| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 CrAccepted-Finance PLOT 9 BESIDES HANUMAN MANDER RAMASREYA KA PURWA GOMITI NAGAR LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹7.7 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹8.1 Cr+₹34.4 L (4.46%)Rejected-Finance 6 OM COMPLEX BHUJ BHACHAU BYPASS DABDA ROAD ANJAR KUTCH 370110 | ANJAR | KUTCH | GUJARAT | 370110 | ₹8.1 Cr+₹34.4 L (4.46%) | L2 | Rejected-Finance L2 |
| 3 | L3₹8.4 Cr+₹64.3 L (8.33%)Rejected-Finance GIJROLI DY LIKELY RELATED TO THE WORK LOCATION MENTIONED SPECIFIC ADDRESS NOT PROVIDED FOR THE CONTRACTOR | DAMAN | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396210 | ₹8.4 Cr+₹64.3 L (8.33%) | L3 | Rejected-Finance L3 |
| 4 | L4₹9.6 Cr+₹1.9 Cr (24.4%)Rejected-Finance PLOT NO 63 PAHADIYAN DISTRICT VARANASI UTTAR PRADESH | VARANASI | UTTAR PRADESH | 221001 | ₹9.6 Cr+₹1.9 Cr (24.4%) | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | MEGHENDRA PAL SINGH CONTRECTOR L3 | S.P.R.U INFRATECH PRIVATE LIMITED L4 | LAXMINARAIN INFRABUILD PRIVATE LIMITED L1 | VELJI RATNA SORATHIA INFRA PVT. LTD L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Ordinary Jungle clearance where growth is continuous for constructing canal including all cost of labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 8,950 | M2 | 1 ₹8,950 Lowest | 3 ₹26,850 | 1.6 ₹14,320 | 4 ₹35,800 |
| 2.00 | Earth work in excavation of canal with manual compaction and dressing of 5.0 to 0.6 cumecs discharge and disposal of surplus earth with manual lead beyond 30M for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material, labour and T&P etc required for proper completion of work as per direction of Engineer-in-charge. | 25,149.65 | M3 | 65 ₹16,34,727.25 | 70.17 ₹17,64,750.94 | 57 ₹14,33,530.05 Lowest | 97 ₹24,39,516.05 |
| 3.00 | Excavating soft rock, disintegrated rock or hard shale by pickaxes (not required blasting) including stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material labour and T&P etc required for proper completion of work as per direction of Engineer in Charge. | 22,056.73 | M3 | 150 ₹33,08,509.5 | 150 ₹33,08,509.5 | 117 ₹25,80,637.41 | 97 ₹21,39,502.81 Lowest |
| 4.00 | Excavating other rocks by blasting, removing muck & stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material labour and T&P etc required for proper completion of work as per direction of Engineer-in-Charge. | 12,466 | M3 | 325 ₹40,51,450 | 295 ₹36,77,470 | 283 ₹35,27,878 | 145 ₹18,07,570 Lowest |
| 5.00 | Earthwork in filling in canal embankment with borrow area soil used with total lead upto 1.0 km by truck or tractor trolley including cost of all lifts, borrowing earth from private land/approved borrow area land, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 68,879.65 | M3 | 125 ₹86,09,956.25 | 185 ₹1,27,42,735.25 | 117 ₹80,58,919.05 | 89 ₹61,30,288.85 Lowest |
| 6.00 | Earthwork in filling in canal embankment with borrow area soil used with total lead beyond 1.0 km and upto 2.0 km by truck or tractor trolley including cost of all lifts, borrowing earth from private land/approved borrow area land, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 33,144.49 | M3 | 155 ₹51,37,395.95 | 170 ₹56,34,563.3 | 127 ₹42,09,350.23 | 89 ₹29,49,859.61 Lowest |
| 7.00 | Earthwork in filling in canal embankment with mix soil (obtained through excavation of canal) used with total leads upto 210m including cost of all lifts, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 13,985.08 | M3 | 65 ₹9,09,030.2 | 30 ₹4,19,552.4 Lowest | 70 ₹9,78,955.6 | 89 ₹12,44,672.12 |
| 8.00 | Earthwork in filling in canal embankment with mix soil (obtained through excavation of canal) used with total leads upto 1.00km including cost of all lifts, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 94,243.35 | M3 | 120 ₹1,13,09,202 | 125 ₹1,17,80,418.75 | 110 ₹1,03,66,768.5 | 89 ₹83,87,658.15 Lowest |
| 9.00 | Excavation of foundation in Hard Earth mixed with Bajari, Kankar or Mooram which can be excavaled by pick axe or crowbar including all lift and lead up to 30m and including back filling watering, ramming of excavated earth in to the trenches or in to the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge up to a distance of 30m. from the foundation trenches. | 16,614.71 | M3 | 80 ₹13,29,176.8 Lowest | 85 ₹14,12,250.35 | 117 ₹19,43,921.07 | 115 ₹19,10,691.65 |
| 10.00 | Providing and laying of coarse sand filling, including cost of all materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 302.2 | M3 | 1,600 ₹4,83,520 | 1,500 ₹4,53,300 | 1,190 ₹3,59,618 | 1,000 ₹3,02,200 Lowest |
Tender Value
Refer Docs
EMD Value
₹23.8 L
Closing Date
27 Jul 2026, 3:00 pmClosed
S.E.K.C.C.2, Mirzapur
Office of Superintending Engineer, Kanhar Construction Circle-2, Mirzapur
Balance work for construction of Pucca structures and E/w for construction of canal at various chainage between km. 15.640 to km. 28.425 of Left Pandu Basin canal.
2026_UPIDC_1166039_4
01/SE/2026-27
Open Tender
Civil Works
Item Wise
120 days
Duddhi Sonebhadra
Please refer Tender Documents.
2 documents required · 2 mandatory
₹2,360
₹23.8 L
15 Sept 2026
6 Jul 2026
27 Jul 2026
6 Jul 2026
27 Jul 2026
10 Jul 2026
6 Jul 2026 - 10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ordinary Jungle clearance where growth is continuous for constructing canal including all cost of labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 8,950 | M2 | - | - |
| 2 | Earth work in excavation of canal with manual compaction and dressing of 5.0 to 0.6 cumecs discharge and disposal of surplus earth with manual lead beyond 30M for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material, labour and T&P etc required for proper completion of work as per direction of Engineer-in-charge. | 25,149.65 | M3 | - | - |
| 3 | Excavating soft rock, disintegrated rock or hard shale by pickaxes (not required blasting) including stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material labour and T&P etc required for proper completion of work as per direction of Engineer in Charge. | 22,056.73 | M3 | - | - |
| 4 | Excavating other rocks by blasting, removing muck & stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material labour and T&P etc required for proper completion of work as per direction of Engineer-in-Charge. | 12,466 | M3 | - | - |
| 5 | Earthwork in filling in canal embankment with borrow area soil used with total lead upto 1.0 km by truck or tractor trolley including cost of all lifts, borrowing earth from private land/approved borrow area land, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 68,879.65 | M3 | - | - |
| 6 | Earthwork in filling in canal embankment with borrow area soil used with total lead beyond 1.0 km and upto 2.0 km by truck or tractor trolley including cost of all lifts, borrowing earth from private land/approved borrow area land, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 33,144.49 | M3 | - | - |
| 7 | Earthwork in filling in canal embankment with mix soil (obtained through excavation of canal) used with total leads upto 210m including cost of all lifts, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 13,985.08 | M3 | - | - |
| 8 | Earthwork in filling in canal embankment with mix soil (obtained through excavation of canal) used with total leads upto 1.00km including cost of all lifts, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 94,243.35 | M3 | - | - |
| 9 | Excavation of foundation in Hard Earth mixed with Bajari, Kankar or Mooram which can be excavaled by pick axe or crowbar including all lift and lead up to 30m and including back filling watering, ramming of excavated earth in to the trenches or in to the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge up to a distance of 30m. from the foundation trenches. | 16,614.71 | M3 | - | - |
| 10 | Providing and laying of coarse sand filling, including cost of all materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 302.2 | M3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tender_document_Lot_4.pdf
Tender Documents • 2.45 MB
BOQ_2188110.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .