Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.7 LAccepted-AOC D 3 7TH BLOCK JAIN GREEN ACRES DHARGA ROAD ZAMIN PALLAVARAM CHENNAI 600043 | CHENNAI | CHENNAI | TAMIL NADU | 600043 | ₹37.7 L Quoted ₹38.2 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹38.7 LRejected-AOC 2 RC ENTERPRISES NEAR AGRASEN BHAWAN BHATAPARA CHHATTISGARH LINK ROAD BALODA BAZAR RAIPUR CHHATTISGARH 493118 UDYAM CG 18 0005898 | BALODA BAZAR | CHHATTISGARH | 493118 | ₹38.7 L | L2 | Rejected-AOC L1 being accepted |
| 3 | L3₹39.4 LRejected-AOC 1001 63 SHALIMAR GARDEN ISMAILGANJ NEAR INDIRA NAGAR SECTOR 08 CROSSING LUCKNOW 226016 | LUCKNOW | UTTAR PRADESH | 226016 | ₹39.4 L | L3 | Rejected-AOC L1 being accepted |
| 4 | L4₹39.4 LRejected-AOC NO 51 TOWN HALL 3RD STREET ARAKKONAM TAMIL NADU 631 001 | ARAKKONAM | RANIPET | TAMIL NADU | 631001 | ₹39.4 L | L4 | Rejected-AOC L1 being accepted |
| 5 | L5₹49.5 LRejected-AOC | ₹49.5 L | L5 | Rejected-AOC L1 being accepted |
| Sl No | Description | Qty | Unit | rc enterprises L2 | C SRINIVASAN L4 | SRI VENKATESWARA ENTERPRISES L5 | RK ENTERPRISES L3 | lakshmibuilders L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE 'A' | ||||||||
| 2.00Material & Labour for leak test and gas charging by vacuumising complete system of Central type AC plant of following capacity with double stage vaccum pump of (-) 2 Kg/sqcm vaccum pressure after repairs to compressor or Repair in Refrigeration System, Charging the Dry nitrogen gas & hold up to 24 hrs and rectifying the leakage if any by bracing/welding/ replacing the "O" ring & Gland packing of service valve including Top up the compressor oil and charging the refrigerant gas upto desired pressure all as specified , instructed & directed. Note :- i) Once the Gas is charged in the system, it should hold in the system for minimum six months. If any gas get leaked from the system, the contractor has to charge the gas upto required level free of cost and No extra cost on this account shall be claimed. ii) Compressor oil and Refrigerant gas shall be measured and paid separately under relevant items as supply only. iii) Labour charge for replacement of compressor oil and refrigerant gas is deemed to be included in the quoted rate. iv) leakage test on each compressor of complete unit shall be considered as one job. | ||||||||
| 2.01 | Leak test and gas charging of Central AC Plant Screw Compressor unit of capacity 110 TR | 3 | Each job | 20,000 ₹60,000 | 20,500 ₹61,500 | 20,900 ₹62,700 | 20,250 ₹60,750 | 12,000 ₹36,000 |
| 2.02 | Leak test and gas charging of Central AC Plant Scroll Compressor unit of capacity 12.5 TR | 9 | Each job | 12,500 ₹1.1 L | 12,700 ₹1.1 L | 13,600 ₹1.2 L | 12,750 ₹1.1 L | 13,000 ₹1.2 L |
| 3.00Material & Labour for Descaling the Condenser unit of Central type AC plant of following capacity full system by circulating descaling chemical with water (made ph value of circulating water shall be 01) through cooling tower re-circulating pump set up to 2 to 3 hours and open the end cover of condenser and manually clean the inner tubes with nylon brush until complete scale gets removed and flush out with fresh water. Reconnecting the condenser end cover by replacing rubber gasket, bolts, nuts and including cleaning of cooling tower,make up water tank etc as required including commissioning in all respect complete all as directed. Note :- (i) Descaling to be carried out twice in the entire contract period and Each job will be measured and paid separately. (ii) During descaling any damage to copper coil which leads to leakage of gas, contractor shall be resposible to rectify the damage and gas to be filled after leak test without any extra cost (iii) Full system include total Number of condensers in the mentioned capacity AC Plant (iv) Pressure difference between inlet and outlet of condenser unit shall be reduced to prefered level given by manufacturer after descaling. | ||||||||
| 3.01 | Descaling the condenser units of Central AC plant of capacity 110 TR full system | 6 | Each job | 25,000 ₹1.5 L | 24,500 ₹1.5 L | 26,000 ₹1.6 L | 25,000 ₹1.5 L | 18,500 ₹1.1 L |
| 3.02 | Descaling the condenser units of Central AC plant of capacity 38 TR full system | 6 | Each job | 15,000 ₹90,000 | 15,250.2 ₹91,501.20 | 16,000 ₹96,000 | 14,500 ₹87,000 | 17,500 ₹1.1 L |
| 3.03 | Descaling the condenser units of Central AC plant of capacity 25 TR full system | 6 | Each job | 15,000 ₹90,000 | 15,250.2 ₹91,501.20 | 16,000 ₹96,000 | 14,500 ₹87,000 | 15,500 ₹93,000 |
| 4.00Material & Labour for Descaling the chiller units of Central type AC plant of following capacity full system by circulating descaling chemical with water (made ph value of circulating water shall be 01) through cooling tower re-circulating pump set up to 2 to 3 hours complete all as directed. Note :- (i) Descaling to be carried out twice in the entire contract period and Each job will be measured and paid separately. | ||||||||
| 4.01 | Descaling the Chiller units of Central AC plant of capacity 110 TR full system | 6 | Each job | 2,000 ₹12,000 | 2,150.2 ₹12,901.20 | 3,000 ₹18,000 | 2,200 ₹13,200 | 15,000 ₹90,000 |
Updated dates
Tender Value
₹36 L
EMD Value
₹72,000
Closing Date
15 Dec 2025, 6:00 pmClosed
CWE(Navy) Chennai
Commander Works Engineers Navy Military Engineer Services Fort St George Rajaji Salai Chennai600 009
87722 REPAIR AND MAINTENANCE TO CENTRAL AC PLANT IN CERTAIN STORAGE ACCN AT INS RAJALI ARAKKONAM
2025_MES_740187_1
CWE/NAVY/ARK/87722/E8 OF 2025-26
Open Tender
Miscellaneous Works
180 days
ARAKKONAM
AS PER NIT AND TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE (M) Arakkonam
₹72,000
Yes
24 Feb 2026
17 Nov 2025
17 Dec 2025
17 Nov 2025
15 Dec 2025
1 Dec 2025
17 Nov 2025 - 24 Nov 2025
Amount
SCHEDULE 'A'
Leak test and gas charging of Central AC Plant Screw Compressor unit of capacity 110 TR
Leak test and gas charging of Central AC Plant Scroll Compressor unit of capacity 12.5 TR
Material & Labour for Descaling the Condenser unit of Central type AC plant of following capacity full system by circulating descaling chemical with water (made ph value of circulating water shall be 01) through cooling tower re-circulating pump set up to 2 to 3 hours and open the end cover of condenser and manually clean the inner tubes with nylon brush until complete scale gets removed and flush out with fresh water. Reconnecting the condenser end cover by replacing rubber gasket, bolts, nuts and including cleaning of cooling tower,make up water tank etc as required including commissioning in all respect complete all as directed. Note :- (i) Descaling to be carried out twice in the entire contract period and Each job will be measured and paid separately. (ii) During descaling any damage to copper coil which leads to leakage of gas, contractor shall be resposible to rectify the damage and gas to be filled after leak test without any extra cost (iii) Full system include total Number of condensers in the mentioned capacity AC Plant (iv) Pressure difference between inlet and outlet of condenser unit shall be reduced to prefered level given by manufacturer after descaling.
Descaling the condenser units of Central AC plant of capacity 110 TR full system
Descaling the condenser units of Central AC plant of capacity 38 TR full system
Descaling the condenser units of Central AC plant of capacity 25 TR full system
Material & Labour for Descaling the chiller units of Central type AC plant of following capacity full system by circulating descaling chemical with water (made ph value of circulating water shall be 01) through cooling tower re-circulating pump set up to 2 to 3 hours complete all as directed. Note :- (i) Descaling to be carried out twice in the entire contract period and Each job will be measured and paid separately.
Descaling the Chiller units of Central AC plant of capacity 110 TR full system
Descaling the Chiller units of Central AC plant of capacity 38 TR full system
Descaling the Chiller units of Central AC plant of capacity 25 TR full system
Material & Labour for maintenance and repairs / attending the complaint to the compressor unit of Central type AC plant of following capacity including fault finding and rectification including its calibration all as specified and directed. Note :- (i) Repair/ servicing work to be carried out only by service person of OEM or his authorised agency. (ii) After rectifying the complaint, same type of complaint within 1 month for the same unit shall not be paid (iii) Servicing / replacing of PCB / replacement of any other parts will be paid seperately under relavent items
Attending the complaint to the compressor unit of Central AC plant of capacity 110 TR
Attending the complaint to the compressor unit of Central AC plant of capacity 38 TR
Attending the complaint to the compressor unit of Central AC plant of capacity 25 TR
Material & Labour for dismantling unserviceable / wornout "V" belts any type / model , supply and fix new "V" Belt of following specification and testing complete all as directed
V- Belt of size A-57
V- Belt of size A-83
V- Belt of size B-70
V- Belt of size B-124
S &F Butterfly Valve of following size, with replacement of bolts, nuts, washers and rubber gaskets including dismantling of old unserviceable Butterfly valves any type all as directed.
Butterfly Valve of size 150 mm dia all as specified and directed.
Butterfly Valve of size 100 mm dia all as specified and directed.
Butterfly Valve of size 80 mm dia all as specified and directed.
Butterfly Valve of size 50 mm dia all as specified and directed.
S & F new NRV butterfly type of following size with replacement of bolts , nuts , washers and rubber gaskets including dismantling of old unserviceable NRV all as directed.
NRV of size 150 mm bore
NRV of size 100 mm bore
NRV of size 80 mm bore
NRV of size 50 mm bore
S & F new Water strainer of following size, both ends flanged "U" type and suitable for existing location with replacement of bolts, nuts , washers and rubber gaskets including dismantling unserviceable water strainer all as directed.
Water strainer of size 150 mm dia
Water strainer of size 80 mm dia
Water strainer of size 50 mm dia
Taking down the existing corroded MS pipe of following sizes for condenser water recirculating pipe line and M&L including welding in its original position new MS pipe line medium grade including all specials/Joints, painting with 2 coats of synthetic enamel paint over red oxide primer as per zonal standard colour code all as specified and directed.
MS pipe of size 40 mm dia
MS pipe of size 80 mm dia
MS pipe of size 100 mm dia
MS pipe of size 150 mm dia
S & F MS Flange of following size including Bolts ,Nuts, gasket etc and taking down old corroded flanges all as directed.
MS flange of size 50 mm dia
MS flange of size 80 mm dia
MS flange of size 100 mm dia
MS flange of size 150 mm dia
Material & Labour for Painting of MS pipe by Cleaning with wire brush and painting with one coat of metal primer and two coats of oil paint all as directed.
Taking down the Centrifugal pump set, 3 phase, 415 volts, 50 Hz (Condenser & Chilled water re-circulating pump set) from MS frame structural support for servicing /overhauling including replacing unserviceable Bush & bearings, gland packing, studs, gasket etc including machining work to shaft, reassembIing the pump set, painting with two coats of synthetic enamel paint including Transporting, erecting, testing and commissioning complete all as specified and directed for the following capacities
Servicing / Overhauling of pump set of capacity 15 HP
Servicing / Overhauling of pump set of capacity 10 HP
Servicing / Overhauling of pump set of capacity 3 to 5 HP
Taking down the condenser/chiller water recirculating pumpset along with MS frame from the existing foundation. Supply, fabricate MS frame of same type and size as per existing specification including welding and fixing, painting with two coats of synthetic enamel paint, connecting inlet & Outlet, electrical connections of pump etc for smooth functioning including brick work for foundation if required.
Taking down the unserviceable motor and dismantling including taking out damaged/burnt out winding from motor, cleaning the slots with CTC and rewinding the same with new super enamelled copper winding wire of existing gauge and turns, oiling and greasing assembling and installing back into position for making motor fully functional including Transporting and Testing by running complete for the following capacities
Rewinding of motor of capacity 3 to 5 HP
Rewinding of motor of capacity 7.5 HP
Rewinding of motor of capacity 10 HP
Rewinding of motor of capacity 15 HP
Supply & Replace the MS lov - joy (Male & Female) coupling of size up to 150 mm complete with star rubber disc as per sample for condenser recirculating pump & chilled water pump
Supply & Replace the star nylon disc for lov - joy of size up to 150 mm as per sample for condenser recirculating pump & chilled water pump
Supply & Replace the Rubber lov - joy (Male & Female) coupling of below mentioned size required at site for condenser water pump & chilled water pump including removal of old MS / Rubber Lov -Joy coupling and grinding work for matching with existing size.
Rubber Lov-Joy coupling of size 150 mm
Rubber Lov-Joy coupling of size 110 mm
Rubber Lov-Joy coupling of size 100 mm
M&L for servicing and cleaning of water strainer/ NRV of size up to 150 mm with chemical for removing all dust particles, scales and unwanted materials all as directed.
Supply and fix Expansion valve suitable for following capacity central AC plant including taking down old unserviceable one all as directed
Expansion valve of Central AC Plant of Screw Compressor unit of capacity 110 TR
Expansion valve of Central AC Plant of Scroll Compressor unit of capacity 12.5 TR
S&F Filter Drier/Strainer suitable for Central AC for the following capacity including taking down old unserviceable one all as directed.
Filter Drier/Strainer of Central AC Plant of Screw Compressor unit of capacity 110 TR
Filter Drier/Strainer of Central AC Plant of Scroll Compressor unit of capacity 12.5 TR
Supply only Compressor oil (grade as per manufacturer recommendation)
Supply only Refrigerant gas as following
Supply only Refrigerant gas R-134 A
Supply only Refrigerant gas R-407 C
Material and labour for taking down the burntout / defective Scroll type compressor from 12.5 TR unit and replace with factory made compressor, testing and commissioning complete all as specified and directed. Note :- (i) Leak test , Vacuuming & Refrigerant gas shall be measured separately under relavant items. (ii) compressor under one year warranty is contractor's responsibility
Material & Labour for Servicing and cleaning of following Air Handling Units ( AHU's ) incl humidification pumps of central type A/ C including taking down and cleaning of air filters by caustic soda and flushing with water and refixing in original position and cleaning of fire dampers , blowers , spray nozzles , condensate water tray including greasing of blower bearing / blower motor , tightening belt, all bolts, nuts and testing for proper functioning all as specified and as directed. Note :- (i) Servicing of AHU to be carried out twice in the entire contract period and Each job will be measured and paid separately. (ii) Spares required for replacement if any shall be measured and paid separately under relevant items as supply and fixing.
Servicing of Air Handling Unit (AHU) of 30,000 CFM capacity, forming part of the central air-conditioning plant of total capacity 3 × 110 TR
Servicing of Air Handling Unit (AHU) of 26,000 CFM capacity, forming part of the central air-conditioning plant of total capacity 3 × 38 TR
Servicing of AHU of capacity 20,000 CFM of Central AC plant of capacity 03 x 25TR
M&L including removing, taking down old unserviceable Pulley of AHU motor and fix with new Pulley of any capacity all as directed.
M&L for dismantling and removing the unserviceable Thrust bearings from the Air Handling Units of the central type A/C plants and replacing with new Thrust bearing of same type / model , assembling back , reinstalling, connecting and testing complete all as directed.
M&L for arresting water leakage from centrifugal Pump of any capacity by replacing oil seal or gland rope all as directed. Note:- Once water leakage arrested from any pump set, any water leakage obtained within one month contractor shall be rectify the leak without any cost
Supply and replace Air / Pressure release valve made with brass all as directed.
Supply and replace Thermostat switch with sensor all as directed.
Supply and replace Oil pressure cutout all as directed all as directed.
Supply and replace Water pressure cutout all as directed.
Supply and replace Pressure gauge/Temperature gauge glycerin type made of stainless steel body.
Supply & replace Temperature sensor with wiring kit for water entering & leaving from condenser / chiller / AHU room of A/C plant
Supply and replace Single phase preventer unit 415 V,3Ph all as directed.
Supply & Replace HP /LP pressure switch with all accessories all as directed.
Supply & Replace Water flow switch with all accessories all as directed.
M & L for Replacement of unserviceable parts in control panel board (PCB) and servicing and rectifying the fault for the following capacity AC plant all as directed.
Servicing of PCB for Central AC Plant of capacity 110 TR
Servicing of PCB for Central AC Plant of capacity 38 TR
Servicing of PCB for Central AC Plant of capacity 25 TR
Supply and replace Microprocessing unit control panel board PCB set with display and all connected accessories as per recommendation of manufacturer for functioning of Central Air conditioning plant of following Capacity
PCB for Central AC Plant of capacity 110 TR
PCB for Central AC Plant of capacity 38 TR
PCB for Central AC Plant of capacity 25 TR
Taking down the defective hot water generator and dismantling for servicing /overhauling including replacing unserviceable accessories, and re-erecting including all connections including testing complete all as specified and directed.
Material and Labour for taking down unserviceable electrical contactors / relays / disconnectors/ Timer / fuse unit , any type /capacity / model from electrical control panels including supply and fix items of following specifications all as specified and as directed :-
Contactor Set for 3 pole contactor AC3, 140 A, 02 NO+02 NC as existing.
Contactor Set for 3 pole contactor AC3, 110 A, 02 NO+02 NC as existing.
Contactor Set for 3 pole contactor AC, 70 A, 02 NO+02 NC as existing.
Contactor set for 3 pole AC,415V, 32 Amps 02 NO+02 NCas existing.
Contactor set for 3 pole AC,415V, 25 Amps 02 NO+02 NCas existing.
Contactor set for 3 pole AC,415V, 18 Amps 02 NO+02 NCas existing.
Over load relay (direct mounting) of Range 63 - 80 Amps Make:
Over load relay (direct mounting) of Range 100 - 160 Amps Make:
Timer electronic, 3-60 Sec, 230-400 V AC, 50 Hz.
Switch Fuse unit 3 Pole, 200 A, 400 V AC.
Supply and replace Air filter 5 Micron of size 1.2 mtr x 1.2 mtr washable type suitable for AHU of Central Air conditioning plant all as directed.
Supply and replace Compressor oil level sensor switch with all accessories for chiller unit of central AC plant of capacity 110 TR all as directed.
Supply and replace MVPD unit of central AC plant all as directed.
Supply and replacement of MCCB, adjustable type of following capacity/specification ,440V, 50 Hz, with extended terminal & spreader link.
MCCB 4 pole, 36 KA, 250 Amp
MCCB 4 pole, 36 KA, 200 Amp
MCCB 4 pole, 36 KA, 160 Amp
MCCB 4 pole, 16 KA, 63 Amp
MCCB 4 pole, 16 KA, 40 Amp
Material & Labour for Servicing and cleaning of following cooling towers of central type A/ C including taking down and cleaning of fills with water and refixing in original position and applying one coat of synthetic enamel paint same as old colour and testing for proper functioning all as specified and as directed. Note :- (i) Servicing of cooling tower to be carried out twice in the entire contract period and Each job will be measured and paid separately. (ii) Spares required for replacement if any shall be measured and paid separately under relevant items as supply and fixing.
Servicing of Cooling tower of capacity 160 TR
Servicing of Cooling tower of capacity 150 TR
Servicing of Cooling tower of capacity 100 TR
Supply and replacement of Fills for cooling tower suitable for Central AC Plant complete all as specified and directed.
Supply and replacement of Sprinkler assembly for cooling tower suitable for up to 160 TR capacity complete all as specified and directed.
Supply and replacement of PVC Branch pipe and Drift eliminators assembly for cooling tower suitable for up to 160 TR capacity complete all as specified and directed.
Supply and replacement of new Fan Blade assembly with blade fixing Hub from the existing cooling tower capacity up to 160 TR of the central type AC plant all as specified and as directed.
Supply and replacement of PVC mesh for cooling tower complete all as specified and directed.
Supply & replacement of PVC Float valve suitable for cooling tower and makeup water tank as per the sample all as directed
Supply and fixing of Nitrile rubber insulation with with Aluminium cladding on Chiller pipe line of any size including removal of old damaged insulation all as directed.
Material and labour for MS frame work including fabrication MS Hand rails, supporting structure, etc fabricated from structural steel sections including nuts, bolts, washers,welding, bending cold or hot,drilling holes for bolts, in any shape or size as indicated or directed and inclusive of one primer coat, one under coat and one finishing coat of paint including embeding in concrete and screwing etc complete all as specified and directed.
rc enterprises (BID ID -3491480)
RK ENTERPRISES (BID ID -3491552)
C SRINIVASAN (BID ID -3497405)
SRI VENKATESWARA ENTERPRISES (BID ID -3491930)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
87722NGENERALPAGESNN.pdf
Tender Documents • 0.58 MB
87722NPSNN.pdf
Additional Documents • 0.38 MB
BOQ_828822.xls
BOQ • 0.79 MB
Download all tender documents and submit your bid