| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC | ₹8.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.2 LRejected-AOC | ₹8.2 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | K SEKAR L2 | BOOPATHY D L1 |
|---|---|---|---|---|---|
| 1.00STRENGTHENING OF THE ROAD FROM RAMAPURAM FOREST ROAD (R-27)KM 0/900-1/106 AT SENGALNANTHAM SHOLINGHUR BLOCK RANIPET DISTRICT. | |||||
| 2.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 252 | Sqm | 6.36 ₹1,602.72 | 6.3 ₹1,587.60 |
| 3.00 | Picking 5 Cm to 10 mm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete | 262 | Sqm | 23.36 ₹6,120.32 | 23.3 ₹6,104.60 |
| 4.00 | Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A. | 113.4 | cum | 140.45 ₹15,927.03 | 140.4 ₹15,921.36 |
| 5.00 | Collection and supply of Grity gravel for Basecourse And side berms and labour charges for filling etc complete | 37.8 | cum | 145.82 ₹5,512 | 145.8 ₹5,511.24 |
| 6.00 | Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5. | 118.13 | cum | 2,338.37 ₹2.8 L | 2,336.37 ₹2.8 L |
| 7.00 | Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5. | 787.5 | Sqm | 86.44 ₹68,071.50 | 85.4 ₹67,252.50 |
| 8.00 | Applying Tack coat over WMM surface using 2.50 kgs of bitumen emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5. | 757.5 | Sqm | 20.21 ₹15,309.08 | 20.21 ₹15,309.08 |
| 9.00 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 23.63 | cum | 11,210.21 ₹2.6 L | 11,210.2 ₹2.6 L |
| 10.00 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous SurfaceProviding and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803 Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminou s Surface | 42 | Sqm | 890 ₹37,380 | 890 ₹37,380 |
Tender Value
₹8.4 L
EMD Value
₹16,840
Closing Date
17 Feb 2026, 3:00 pmClosed
BDO BP
Panchayat Union Sholinghur
STRENGTHENING OF THE ROAD FROM RAMAPURAM FOREST ROAD (R-27)KM 0/900-1/106 AT SENGALNANTHAM SHOLINGHUR BLOCK RANIPET DISTRICT.
2026_RDTN_658673_1
A3/1733/2025
Open Tender
Civil Works
180 days
Sholinghur
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹16,840
Yes
6 Mar 2026
16 Feb 2026
17 Feb 2026
16 Feb 2026
17 Feb 2026
16 Feb 2026
STRENGTHENING OF THE ROAD FROM RAMAPURAM FOREST ROAD (R-27)KM 0/900-1/106 AT SENGALNANTHAM SHOLINGHUR BLOCK RANIPET DISTRICT.
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 Cm to 10 mm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A.
Collection and supply of Grity gravel for Basecourse And side berms and labour charges for filling etc complete
Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5.
Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
Applying Tack coat over WMM surface using 2.50 kgs of bitumen emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous SurfaceProviding and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803 Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminou s Surface
60cm equilateral triangle
Provision for Hectometor stone
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_790191.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_790191.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid