Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹40.3 L+₹8,649.53 (0.22%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹41.9 L+₹1.6 L (4.09%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹42.1 L+₹1.9 L (4.75%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹42.3 L+₹2.1 L (5.16%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ASSADULLAH ITOO L7 | M/s Bhat Builders L1 | M/S Kuchay Constructions L3 | ASIF AHMAD DAR L2 | M/S MOHAMMAD RAFIQ BHAT L8 | KHAJA CONSTRUCTIONS L12 | M/S NOOR MOHAMAD DAR L5 | MOHD YASEEN RAINA L4 | PARVEZ AHMAD DARZI L10 | M/S AHMAD CONSTRUCTIONS L11 | M/S AHANGER CONSTRUCTIONS L6 | abdul rashid dar L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed :All kinds of soil | 203.91 | CUM | 225 ₹45,879.75 | 111 ₹22,634.01 | 175 ₹35,684.25 | 100 ₹20,391 | 99 ₹20,187.09 Lowest | 190 ₹38,742.9 | 200 ₹40,782 | 200 ₹40,782 | 310 ₹63,212.1 | 400 ₹81,564 | 190 ₹38,742.9 | 200 ₹40,782 |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 136.62 | CUM | 175 ₹23,908.5 | 51 ₹6,967.62 Lowest | 90 ₹12,295.8 | 400 ₹54,648 | 99 ₹13,525.38 | 100 ₹13,662 | 150 ₹20,493 | 100 ₹13,662 | 120 ₹16,394.4 | 150 ₹20,493 | 145 ₹19,809.9 | 150 ₹20,493 |
| 3.00 | P/L in position stone soling hand packed including ramming. Including all carriages, complete job. | 33.64 | CUM | 975 ₹32,799 | 736.5 ₹24,775.86 | 850 ₹28,594 | 650 ₹21,866 Lowest | 799.99 ₹26,911.66 | 900 ₹30,276 | 1,000 ₹33,640 | 750 ₹25,230 | 800 ₹26,912 | 700 ₹23,548 | 750 ₹25,230 | 1,000 ₹33,640 |
| 4.00 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) incl carriage av.lead of 20km | 25.49 | CUM | 3,900 ₹99,411 | 2,000 ₹50,980 Lowest | 3,000 ₹76,470 | 2,500 ₹63,725 | 2,499.99 ₹63,724.87 | 3,900 ₹99,411 | 4,200 ₹1,07,058 | 3,800 ₹96,862 | 3,890 ₹99,156.1 | 3,000 ₹76,470 | 4,000 ₹1,01,960 | 4,000 ₹1,01,960 |
| 5.00 | Providing and laying in position specified grade of reinforced cement concrete M20 mix including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level incl carriage av. Lead of 20 km.complete job. | 107.31 | CUM | 5,900 ₹6,33,129 | 5,200 ₹5,58,012 | 5,000 ₹5,36,550 Lowest | 5,800 ₹6,22,398 | 7,000 ₹7,51,170 | 6,000 ₹6,43,860 | 6,400 ₹6,86,784 | 6,500 ₹6,97,515 | 5,990 ₹6,42,786.9 | 7,500 ₹8,04,825 | 6,500 ₹6,97,515 | 7,000 ₹7,51,170 |
| 6.00 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 238.95 | CUM | 5,300 ₹12,66,435 | 4,300 ₹10,27,485 Lowest | 4,600 ₹10,99,170 | 4,700 ₹11,23,065 | 5,600 ₹13,38,120 | 5,300 ₹12,66,435 | 4,900 ₹11,70,855 | 4,600 ₹10,99,170 | 5,000 ₹11,94,750 | 5,400 ₹12,90,330 | 5,000 ₹11,94,750 | 5,000 ₹11,94,750 |
| 7.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level incl carriage 20 km av . Complete job. | 10,731 | KG | 81 ₹8,69,211 | 77 ₹8,26,287 | 82 ₹8,79,942 | 74 ₹7,94,094 | 80 ₹8,58,480 | 90 ₹9,65,790 | 72 ₹7,72,632 Lowest | 72 ₹7,72,632 Lowest | 82 ₹8,79,942 | 90 ₹9,65,790 | 76 ₹8,15,556 | 85 ₹9,12,135 |
| 8.00 | Structural steel work in single section and framed work,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer Welded incl carriage av lead of 20km. | 7,477 | KG | 93 ₹6,95,361 | 89 ₹6,65,453 Lowest | 96 ₹7,17,792 | 91 ₹6,80,407 | 101.27 ₹7,57,195.79 | 113 ₹8,44,901 | 101 ₹7,55,177 | 104 ₹7,77,608 | 100 ₹7,47,700 | 102 ₹7,62,654 | 95 ₹7,10,315 | 105 ₹7,85,085 |
| 9.00 | Painting with synthetic enamel paint of approved brand and manufacture
to give an even shade.Two or more coats on new work complete job | 48.9 | SQM | 135.01 ₹6,601.92 | 100 ₹4,890 | 130 ₹6,357 | 160 ₹7,824 | 50.4 ₹2,464.56 Lowest | 121 ₹5,916.9 | 199 ₹9,731.1 | 80 ₹3,912 | 120 ₹5,868 | 100 ₹4,890 | 140 ₹6,846 | 90 ₹4,401 |
| 10.00 | Providing and fixing G.I. chain link fabric fencing of required width inmesh size 50x50 mm including strengthening with 2 mm dia wire or nuts,bolts and washers as required complete as per the direction of Engineer-incharge Made of G.I. wire of dia 4 mm incl carriage complete job | 1,003.72 | SQM | 535.08 ₹5,37,070.5 | 423.57 ₹4,25,145.68 Lowest | 640 ₹6,42,380.8 | 550 ₹5,52,046 | 550 ₹5,52,046 | 600 ₹6,02,232 | 450 ₹4,51,674 | 450 ₹4,51,674 | 700 ₹7,02,604 | 600 ₹6,02,232 | 575 ₹5,77,139 | 650 ₹6,52,418 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
27 Jun 2023, 4:00 pmClosed
Deputy General Manager Unit 2nd Srinagar
Habitat Center Bemina
Construction of Chain Link Fencing at Padgampora District Pulwama
2023_HAUDD_215615_1
Tender Notice No.06of 2023-24(e)
Open Tender
Civil Works - Others
Item Rate
90 days
PADGAMPORA PULWAMA
As Per Nit
2 documents required · 2 mandatory
₹1,600
Yes
Deputy General Manager Unit 2nd 1206040500005049
₹1.1 L
Yes
10 Jul 2023
8 Jun 2023
28 Jun 2023
8 Jun 2023
27 Jun 2023
8 Jun 2023
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed :All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
P/L in position stone soling hand packed including ramming. Including all carriages, complete job.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) incl carriage av.lead of 20km
Providing and laying in position specified grade of reinforced cement concrete M20 mix including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level incl carriage av. Lead of 20 km.complete job.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level incl carriage 20 km av . Complete job.
Structural steel work in single section and framed work,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer Welded incl carriage av lead of 20km.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on new work complete job
Providing and fixing G.I. chain link fabric fencing of required width inmesh size 50x50 mm including strengthening with 2 mm dia wire or nuts,bolts and washers as required complete as per the direction of Engineer-incharge Made of G.I. wire of dia 4 mm incl carriage complete job
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. Incl carrige complete job
Centering and shuttering including strutting, propping etc. and removal of form for:Lintel, beams, plinth beams, girders, bressumers and cantilevers Incl carrige complete job
ASIF AHMAD DAR
M/S Kuchay Constructions
MOHD YASEEN RAINA
M/S NOOR MOHAMAD DAR
M/S AHANGER CONSTRUCTIONS
ASSADULLAH ITOO
M/S MOHAMMAD RAFIQ BHAT
abdul rashid dar
PARVEZ AHMAD DARZI
M/S AHMAD CONSTRUCTIONS
KHAJA CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .