Loading…
Loading…
Tender Value
₹57.0 L
EMD Value
₹1.1 L
Closing Date
29 Sept 2026, 6:00 pm
CWE Amritsar
HQ CWE Amritsar
SPL REPAIR TO CLOSED BLASTPEN IN FCAB UNDER GE NAMS
2026_MES_787224_1
83092/E8
Open Tender
Civil Works
Item Rate
180 days
GE NAMS
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
GE NAMS
₹1.1 L
Yes
1 Sept 2026
1 Sept 2026
6 Oct 2026
1 Sept 2026
29 Sept 2026
22 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of Mud in roofs, any thickness, including plastering and leaping (whether full thickness removed or only a part thereof) complete all as specified and as directed. | 243.2 | CUM | - | - |
| 2 | Removing excavated material not exceeding 50 meters and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified and as directed. | 283.2 | CUM | - | - |
| 3 | Labour for Cutting or uprooting grass from over traverse wall, removing rubbish off the premises, cleaning surface complete all as specified and as directed. | 1,360 | SQM | - | - |
| 4 | Material and Labour for cement plaster in 1:3 for Screed bed or bedding layer of mortar 15 mm thick using/ mixing water proofing compound for Roof complete all as specified and as directed. | 608 | SQM | - | - |
| 5 | Material and Labour for applying evenly two layer tack coat of bitumen of grade 85/25 at the rate of 1.2 kg per sq.m per coat including cleaning surfaces complete all as specified and directed | 608 | SQM | - | - |
| 6 | Material and Labour Liquid water proofing compound by weight of cement complete all as specified and as directed. | 28.67 | LTR | - | - |
| 7 | Material and Labour for earth filling with proper consolidation around traverse wall and Blast pen Roof, whether curved or flat, from outside MOD land. The earth shall be free from vegetation, stones, and pebbles and foreign materials, possessing good engineering properties for filling in embankment, complete all as specified and as directed. | 651.2 | CUM | - | - |
| 8 | Taking down cement plaster from walls/ceiling including raking out joints hacking for key scrubbing down with water complete all as specified and as directed. | 684 | SQM | - | - |
| 9 | Material and Labour for 1:3 Cement plaster rendering 10 mm thick on fair faces of brick work or concrete surfaces of ceiling complete all as specified and directed. | 608 | SQM | - | - |
| 10 | Demolition of brick work built in cement mortar complete all as specified and as directed. | 2 | CUM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_882250.xls
BOQ • 0.50 MB
Tender83092.pdf
Tender Documents • 1.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .