Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 CrAdmitted-Finance HOLDING NO 06 623 GYAN VILLA MANAV KALYAN ROAD OPP BRAHMA KUMARI ASHRAM LANE TINSUKIA ASSAM PIN 786125 | TINSUKIA | TINSUKIA | ASSAM | 786125 | L1 | Admitted-Finance | |
| 2 | L2₹14.0 Cr+₹1.1 Cr (8.16%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Vinay Bhardwaj L2 | M/s. GRRB ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00Providing, laying and compaction of surfacing works comprising of Preparation of Sub-Grade, GSBC 150 mm, GSBC 100 mm, WMM 75 mm in three layers, DBM 50 mm, BC 30 mm, along with Tack Coat, Prime Coat, Road Marking with thermoplastic paint and Berm Filling for surfacing work from Km 10.000 to Km 15.000 on Nampong – Vijaynagar road. | |||||
| 1.01 | Preparation of sub-grade by excavating up to 20 cm average depth, removal of vegetations and other extraneous matter dressing excavated earth to required camber or super elevation and rolling with power roller incl watering & disposal of surplus earth complete in all respect all as specified and directed by Engineer-In-Charge. | 53,857 | Sqm | 81 ₹43,62,417 | 75 ₹40,39,275 Lowest |
| 1.02 | Providing, laying and compaction of 150 mm thick Granular Sub Base Course 1st layer confirming to MORT&H Specification for road and bridge works (Fifth Revision), over already prepared Sub Grade surface, including preparation of existing surface and inclusive of cost of all materials, machinery, carriage and correction works as required, including manual operation as and when required for proper grade and level and camber, through rolling with power roller with necessary hand packing to give an even surface, including running expenses of all machineries, inclusive of proper traffic control during laying to the satisfaction of Engineer, required quality control tests at required interval etc complete in all respect all as specified and directed by Engineer-In-Charge. | 8,079 | Cum | 3,700 ₹2,98,92,300 | 3,365 ₹2,71,85,835 Lowest |
| 1.03 | Providing, laying and compaction of 100 mm thick Granular Sub Base Course 2nd layer confirming to MORT&H Specification for road and bridge works (Fifth Revision), over already laid GSBC surface including preparation of existing surface and inclusive of cost of all materials, machinery, carriage and correction works as required including manual operation as and when required for proper grade and level and camber, through rolling with power roller with necessary hand packing to give an even surface, including running expenses of all machineries, inclusive of proper traffic control during laying to the satisfaction of Engineer, required quality control tests at required interval etc complete in all respect all as specified and directed by Engineer-In-Charge. | 3,757 | Cum | 3,600 ₹1,35,25,200 | 3,365 ₹1,26,42,305 Lowest |
| 1.04 | Providing, laying and compaction of 75 mm thick Wet Mix Macadam 1st layer confirming to MORT&H Specification for road and bridge works (Fifth Revision), over already laid, GSB surface including preparation of existing surface and inclusive of cost of all materials, machinery, carriage and correction works as required by means of paver finisher including manual operation as and when required for proper grade and level and camber, through rolling with power roller with necessary hand packing to give an even surface, including running expenses of all plants and machineries, inclusive of proper traffic control during laying to the satisfaction of Engineer, required quality control tests at required interval etc complete in all respect all as specified and directed by Engineer-In-Charge. | 2,762 | Cum | 4,500 ₹1,24,29,000 | 4,175 ₹1,15,31,350 Lowest |
| 1.05 | Providing, laying and compaction of 75 mm thick Wet Mix Macadam 2nd layer confirming to MORT&H Specification for road and bridge works (Fifth Revision), over already laid, WMM surface including preparation of existing surface and inclusive of cost of all materials, machinery, carriage and correction works as required by means of paver finisher including manual operation as and when required for proper grade and level and camber, through rolling with power roller with necessary hand packing to give an even surface, including running expenses of all plants and machineries, inclusive of proper traffic control during laying to the satisfaction of Engineer, required quality control tests at required interval etc complete in all respect all as specified and directed by Engineer-In-Charge. | 2,707 | Cum | 4,500 ₹1,21,81,500 | 4,175 ₹1,13,01,725 Lowest |
| 1.06 | Providing, laying and compaction of 75 mm thick Wet Mix Macadam 3rd layer confirming to MORT&H Specification for road and bridge works (Fifth Revision), over already laid, WMM surface including preparation of existing surface and inclusive of cost of all materials, machinery, carriage and correction works as required by means of paver finisher including manual operation as and when required for proper grade and level and camber, through rolling with power roller with necessary hand packing to give an even surface, including running expenses of all plants and machineries, inclusive of proper traffic control during laying to the satisfaction of Engineer, required quality control tests at required interval etc complete in all respect all as specified and directed by Engineer-In-Charge. | 2,651 | Cum | 4,500 ₹1,19,29,500 | 4,175 ₹1,10,67,925 Lowest |
| 1.07 | Providing, laying and compaction of 50 mm thick DBM (Dense Bituminous Macadam) layer over WMM surface including preparation and correction of existing surface with pre-coated stone chips grading confirming to Table:500-10 and aggregates satisfying the physical requirement of table 500-08 of MORT&H specifications of Road and bridge works (Fifth Revision) mixed with minimum 4.7% bitumen VG-30 (Viscosity Grade-30) by mass of total mix and 2% filler by weight of mix all as specified as per MoRT&H Specifications (Fifth Revision) complete in all respect and all as specified and directed by Engineer-In-Charge. | 1,730 | Cum | 17,250 ₹2,98,42,500 | 16,050 ₹2,77,66,500 Lowest |
| 1.08 | Providing, laying and compaction of 30 mm thick BC (Bituminous Concrete) layer including preparation and correction of existing surface, with pre-coated stone chips grading confirming to Table:500-17 and aggregates satisfying the physical requirement of table 500-16 of MORT&H specifications of Road and bridge works (Fifth revision) mixed with minimum 5.6% bitumen VG-30 (Viscosity Grade-30) by mass of total mix and 2% filler by weight of mix all as specified as per MoRT&H Specifications (Fifth Revision) complete in all respect all as specified and directed by Engineer-In-Charge. | 1,038 | Cum | 20,125 ₹2,08,89,750 | 18,725 ₹1,94,36,550 Lowest |
| 1.09 | Providing and applying Prime Coat over WMM surface by mechanical mean with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer @ of 7.5 Km/10 Sqm (RS-1 grade) using emulsion pressure distributor, confirming to clause 502 of MoRT&H Specifications of Road and bridge works (Fifth Revision) complete in all respect and as specified and directed by Engineer-In-Charge. | 34,605 | Sqm | 40 ₹13,84,200 | 38 ₹13,14,990 Lowest |
Tender Value
Refer Docs
EMD Value
₹8.2 L
Closing Date
23 Jul 2020, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Chief Engineer (P) Udayak
HQ CE (P) Udayak, C/O 99 APO (GREF) PIN-931715
P L and C of surfacing works for Preparation of Sub Grade, GSBC 150 mm, GSBC 100 mm, WMM 75 mm 3 layers, DBM 50 mm, BC 30 mm compacted thick bet Km 10.00 To Km 15.00 on Road Nampong Vijaynagar of 103 RCC under 752 BRTF of Project Udayak in A P State
2020_BRO_569243_1
TENDER No CE (P) UDAYAK 14 of 2020-21
Open Tender
Civil Works
Works
240 days
Road Nampong Vijaynagar
As pertender documents
5 documents required · 5 mandatory
₹0
₹8.2 L
Yes
HQ CE (P) Udayak C/O 99 APO
6 Aug 2020
4 Jul 2020
24 Jul 2020
4 Jul 2020
23 Jul 2020
15 Jul 2020
4 Jul 2020 - 13 Jul 2020
14 Jul 2020
120 days
Amount
Providing, laying and compaction of surfacing works comprising of Preparation of Sub-Grade, GSBC 150 mm, GSBC 100 mm, WMM 75 mm in three layers, DBM 50 mm, BC 30 mm, along with Tack Coat, Prime Coat, Road Marking with thermoplastic paint and Berm Filling for surfacing work from Km 10.000 to Km 15.000 on Nampong – Vijaynagar road.
Preparation of sub-grade by excavating up to 20 cm average depth, removal of vegetations and other extraneous matter dressing excavated earth to required camber or super elevation and rolling with power roller incl watering & disposal of surplus earth complete in all respect all as specified and directed by Engineer-In-Charge.
Providing, laying and compaction of 150 mm thick Granular Sub Base Course 1st layer confirming to MORT&H Specification for road and bridge works (Fifth Revision), over already prepared Sub Grade surface, including preparation of existing surface and inclusive of cost of all materials, machinery, carriage and correction works as required, including manual operation as and when required for proper grade and level and camber, through rolling with power roller with necessary hand packing to give an even surface, including running expenses of all machineries, inclusive of proper traffic control during laying to the satisfaction of Engineer, required quality control tests at required interval etc complete in all respect all as specified and directed by Engineer-In-Charge.
Providing, laying and compaction of 100 mm thick Granular Sub Base Course 2nd layer confirming to MORT&H Specification for road and bridge works (Fifth Revision), over already laid GSBC surface including preparation of existing surface and inclusive of cost of all materials, machinery, carriage and correction works as required including manual operation as and when required for proper grade and level and camber, through rolling with power roller with necessary hand packing to give an even surface, including running expenses of all machineries, inclusive of proper traffic control during laying to the satisfaction of Engineer, required quality control tests at required interval etc complete in all respect all as specified and directed by Engineer-In-Charge.
Providing, laying and compaction of 75 mm thick Wet Mix Macadam 1st layer confirming to MORT&H Specification for road and bridge works (Fifth Revision), over already laid, GSB surface including preparation of existing surface and inclusive of cost of all materials, machinery, carriage and correction works as required by means of paver finisher including manual operation as and when required for proper grade and level and camber, through rolling with power roller with necessary hand packing to give an even surface, including running expenses of all plants and machineries, inclusive of proper traffic control during laying to the satisfaction of Engineer, required quality control tests at required interval etc complete in all respect all as specified and directed by Engineer-In-Charge.
Providing, laying and compaction of 75 mm thick Wet Mix Macadam 2nd layer confirming to MORT&H Specification for road and bridge works (Fifth Revision), over already laid, WMM surface including preparation of existing surface and inclusive of cost of all materials, machinery, carriage and correction works as required by means of paver finisher including manual operation as and when required for proper grade and level and camber, through rolling with power roller with necessary hand packing to give an even surface, including running expenses of all plants and machineries, inclusive of proper traffic control during laying to the satisfaction of Engineer, required quality control tests at required interval etc complete in all respect all as specified and directed by Engineer-In-Charge.
Providing, laying and compaction of 75 mm thick Wet Mix Macadam 3rd layer confirming to MORT&H Specification for road and bridge works (Fifth Revision), over already laid, WMM surface including preparation of existing surface and inclusive of cost of all materials, machinery, carriage and correction works as required by means of paver finisher including manual operation as and when required for proper grade and level and camber, through rolling with power roller with necessary hand packing to give an even surface, including running expenses of all plants and machineries, inclusive of proper traffic control during laying to the satisfaction of Engineer, required quality control tests at required interval etc complete in all respect all as specified and directed by Engineer-In-Charge.
Providing, laying and compaction of 50 mm thick DBM (Dense Bituminous Macadam) layer over WMM surface including preparation and correction of existing surface with pre-coated stone chips grading confirming to Table:500-10 and aggregates satisfying the physical requirement of table 500-08 of MORT&H specifications of Road and bridge works (Fifth Revision) mixed with minimum 4.7% bitumen VG-30 (Viscosity Grade-30) by mass of total mix and 2% filler by weight of mix all as specified as per MoRT&H Specifications (Fifth Revision) complete in all respect and all as specified and directed by Engineer-In-Charge.
Providing, laying and compaction of 30 mm thick BC (Bituminous Concrete) layer including preparation and correction of existing surface, with pre-coated stone chips grading confirming to Table:500-17 and aggregates satisfying the physical requirement of table 500-16 of MORT&H specifications of Road and bridge works (Fifth revision) mixed with minimum 5.6% bitumen VG-30 (Viscosity Grade-30) by mass of total mix and 2% filler by weight of mix all as specified as per MoRT&H Specifications (Fifth Revision) complete in all respect all as specified and directed by Engineer-In-Charge.
Providing and applying Prime Coat over WMM surface by mechanical mean with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer @ of 7.5 Km/10 Sqm (RS-1 grade) using emulsion pressure distributor, confirming to clause 502 of MoRT&H Specifications of Road and bridge works (Fifth Revision) complete in all respect and as specified and directed by Engineer-In-Charge.
Providing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor @ 2.5 Kg/10 Sqm (RS-1 grade) or using low viscosity grade paving bitumen of VG-10 grade using bitumen pressure distributer on prepared bituminous/granular surface cleaned with mechanical broom over DBM layer, all complete as per clause 503 of to MoRT&H Specifications (Fifth Revision) complete in all respect and as specified and directed by Engineer-In-Charge
Providing and applying Road marking with thermoplastic paint (2.5 mm thick) conforming to MoRT&H Specifications (Fifth Revision): 803.4 and IRC/IS Codes as applicable including preparation of surface and application complete in all respect all as specified and directed by Engineer-In-Charge.
Earthwork in embankment by filling with earth free from roots etc. spreading in layers not exceeding 30 cm including watering and finishing to required slope & level not exceeding 1.5 m high above the base in ordinary soil complete in all respect all as specified and directed by Engineer-in-Charge. (Berm filling)
Vinay Bhardwaj
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .