Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-Finance | ₹8.8 L | L1 | Accepted-Finance admitted |
| 2 | L2₹8.8 L+₹2,469.60 (0.28%)Accepted-Finance | ₹8.8 L+₹2,469.60 (0.28%) | L2 | Accepted-Finance admitted |
| 3 | Rejected-Technical FARRUKHABAD | - | - | Rejected-Technical As Per Checklist |
Tender Value
₹10.4 L
EMD Value
₹20,900
Closing Date
3 Aug 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
O/o EXECUTIVE ENGINEER
Construction of a drain from Shripals house towards the culvert in village Sidhechakarpur
2026_REDUP_1173174_1
216/EEREDFBD/2026-27
Open Tender
Civil Works
Percentage
180 days
FARRUKHABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹856
₹20,900
Yes
24 Aug 2026
29 Jul 2026
3 Aug 2026
29 Jul 2026
3 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains(not exceeding 1.5m in width or 10 sqm on plan), i/c dressing of sides and ramming of bottoms, for all lift, i/c getting out the excavated soil and disposal of surplus excavated soil. within a lead of 50m i/c all complete. | 257.9 | Cum | 180.05 | ₹46,434.9 |
| 2 | Plan cement concrete in 1:4:8 with 1 cement ,4 C/sand derived from natural sources 8 graded stone aggregate 40 mm nominal size derived from natural sources .i/c all complete | 34.5 | Cum | 4,712.03 | ₹1,62,565.04 |
| 3 | Brick work with common burnt clay F.P.S(Non modular) brick of class designation 7.5 in 1;4 cement & c.sand mortor in foundation & plinth i/c all complete. | 102.47 | Cum | 5,098.46 | ₹5,22,439.2 |
| 4 | Providing and laying in position reinforced cement concrete(1:1.5:3 with cement, c/sand & 20mm stone grite of specified grade excluding the cost of centring,shuttering,finishing & reinforcement in Sill bend, Door bend, Sunshed, column , Beam & Roof slab. | 1.21 | Cum | 7,958.63 | ₹9,629.94 |
| 5 | T.M.T. bars iron work in R.C.C work i/c Straightening cutting bending & placing in position and binding All complete Work | 0.95 | Qtl | 7,460.25 | ₹7,087.24 |
| 6 | 12mm thick plaster with 1:4 ratio cement & c/sand i/c all labour & material etc all compt work | 253 | sqm | 247.19 | ₹62,539.07 |
| 7 | P/laying in cement conrete in bed, blocks, anchor blocks plain winodw sill etc upto floor five level.In1:2:4 ( Cement, C/sand stone aggregete with 20mm nominal size stone grit) (Holdfast) | 9.55 | cum | 6,844.75 | ₹65,367.36 |
| 8 | Supply and fixing in inaguration stone plate or sign board | 1 | Jobs | 5,937.5 | ₹5,937.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
sedhechakar04.pdf
Tender Documents • 1.15 MB
BOQ_2203119.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .