Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.5 LAccepted-AOC | L1 | Accepted-AOC Being L1 Bidder | |
| 2 | L2₹38.9 L+₹43,701 (1.14%)Rejected-Finance | L2 | Rejected-Finance Being L2 Bidder | |
| 3 | L3₹39.1 L+₹63,561 (1.65%)Rejected-Finance | L3 | Rejected-Finance Being L3 Bidder |
| Sl No | Description | Qty | Unit | RIK ENTERPRISE L3 | MODERN ENGINEERING ENTERPRISE L1 | M/S. S. D. CHATTERJEE AND CO. L2 |
|---|---|---|---|---|---|---|
| 1.01 | Annual Maintenance of entire Electrical Installation and Lighting System incl. 11/0.433 KV indoor type Sub Station, Main & Sub Distribution Pannel, 2 MVA Transformer (2 Nos, 1 MVA TR), Compound light installed in the old hospital campus of Bolpur Sub-Divisional Hospital ( Incl.Quarters, Drug Reserve Store, Santiniketan Govt. Nursing College & Nursing training school and Hostel ) and Electrical Installation and Compound lighting system in the campus of Bolpur Sub Correctional Home ( Incl. Quaters ) for round the clock i.e (24x365) hrs as per Terms & Conditions by duputing following man power. (Period for 365 Days..incl. Holidays.)
The Agency has to depute :
i) 01 (One) no Highly Skilled Electrician, 02 (Two) Nos Skilled Eletrician and 02 (Two) Nos Semi-Skilled in 1st Shift or in the shift as per site requirement as per direction of EIC.
ii) 02 (Two) Nos Skilled Eletrician and 02 (Two) Nos Semi-Skilled in 2nd Shift or in the shift as per site requirement as per direction of EIC.
ii) 01 (One) Nos Skilled Eletrician and 01 (One) Nos Semi-Skilled in 3rd Shift or in the shift as per site requirement as per direction of EIC.
i) Highly Skilled Labour | 1 | Nos | 28,400 ₹3,40,800 | 27,000 ₹3,24,000 Lowest | 28,600 ₹3,43,200 |
| 2.00 | ii) Skilled Labour | 5 | Nos | 24,800 ₹14,88,000 | 24,600 ₹14,76,000 Lowest | 25,000 ₹15,00,000 |
| 3.00 | iii) Semiskilled Labour | 5 | Nos | 23,175 ₹13,90,500 | 22,500 ₹13,50,000 Lowest | 22,500 ₹13,50,000 Lowest |
| 4.00 | Charges for Annual Electrical Maintenance work related with Fire Detection Scheme installed under Bolpur Electrical Section-I, Bolpur Electrical Sub-Division under Birbhum Electrical Division, PWD. During the period for : 365 days.. including Holidays.
Maintenance comprises : Integrated Control Panel, smoke cum heat detector, heat detector, LASER detector, Manual call point, Fault Isolator module, control module and all accessories related to Fire detection scheme on preventive or scheduled maintenance as well as on call within 24 hrs by expert workmen having at least three year experience in relevant fire detection company incl. charges of faulty parts.
** Agency should be deputed 01 (One) no experienced workman for three (03) Shift. | 1 | item | 57,805 ₹6,93,660 Lowest | 58,283.25 ₹6,99,399 | 58,325 ₹6,99,900 |
| 5.00N.B: i) Rate should be Quoted per Labour per Month basis. ii) Payment will be made after availability of fund from concern Department. iii) Payment will be made as per P.W.D norms. | ||||||
Tender Value
Refer Docs
EMD Value
₹79,451
Closing Date
22 Jan 2025, 1:00 pmClosed
Executive Engineer, Birbhum Electrical DivisionPWD
Office of the EXECUTIVE ENGINEER P.W.DTE. Birbhum Electrical Division P.O. Suri,Dist Birbhum, Pin 731101
Annual Maintenance work related with E.I, Lighting System and Fire Detection system installed at Bolpur Sub Divisional Hospital and Bolpur Sub Correctional Home under Bolpur Electrical Section I under Birbhum Electrical Division, PWD, During the peri
2025_WBPWD_794501_1
BIRED/140/e-NIQ(1st call) of 2024-2025
Open Tender
ELECTRICAL WORKS ORG
Item Rate
365 days
Bolpur
Please refer Tender documents.
5 documents required · 5 mandatory
₹79,451
Executive Engineer, Birbhum Electrical DivisionPWD
8 Jul 2026
3 Jan 2025
24 Jan 2025
3 Jan 2025
22 Jan 2025
6 Jan 2025
6 Jan 2025
Amount
Annual Maintenance of entire Electrical Installation and Lighting System incl. 11/0.433 KV indoor type Sub Station, Main & Sub Distribution Pannel, 2 MVA Transformer (2 Nos, 1 MVA TR), Compound light installed in the old hospital campus of Bolpur Sub-Divisional Hospital ( Incl.Quarters, Drug Reserve Store, Santiniketan Govt. Nursing College & Nursing training school and Hostel ) and Electrical Installation and Compound lighting system in the campus of Bolpur Sub Correctional Home ( Incl. Quaters ) for round the clock i.e (24x365) hrs as per Terms & Conditions by duputing following man power. (Period for 365 Days..incl. Holidays.) The Agency has to depute : i) 01 (One) no Highly Skilled Electrician, 02 (Two) Nos Skilled Eletrician and 02 (Two) Nos Semi-Skilled in 1st Shift or in the shift as per site requirement as per direction of EIC. ii) 02 (Two) Nos Skilled Eletrician and 02 (Two) Nos Semi-Skilled in 2nd Shift or in the shift as per site requirement as per direction of EIC. ii) 01 (One) Nos Skilled Eletrician and 01 (One) Nos Semi-Skilled in 3rd Shift or in the shift as per site requirement as per direction of EIC. i) Highly Skilled Labour
ii) Skilled Labour
iii) Semiskilled Labour
Charges for Annual Electrical Maintenance work related with Fire Detection Scheme installed under Bolpur Electrical Section-I, Bolpur Electrical Sub-Division under Birbhum Electrical Division, PWD. During the period for : 365 days.. including Holidays. Maintenance comprises : Integrated Control Panel, smoke cum heat detector, heat detector, LASER detector, Manual call point, Fault Isolator module, control module and all accessories related to Fire detection scheme on preventive or scheduled maintenance as well as on call within 24 hrs by expert workmen having at least three year experience in relevant fire detection company incl. charges of faulty parts. ** Agency should be deputed 01 (One) no experienced workman for three (03) Shift.
N.B: i) Rate should be Quoted per Labour per Month basis. ii) Payment will be made after availability of fund from concern Department. iii) Payment will be made as per P.W.D norms.
M/S. S. D. CHATTERJEE AND CO. (BID ID -6035740)
RIK ENTERPRISE (BID ID -6031113)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .