| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | ₹4.6 L | L1 | Accepted-AOC accepted |
| 2 | L2₹4.9 LRejected-AOC | ₹4.9 L | L2 | Rejected-AOC rejected |
| 3 | L3₹4.9 LRejected-AOC NEAR GAYATRI PEETH MANDIR JAY NAGAR TEH NAJIBABAD DISTT BIJNOR | ₹4.9 L | L3 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | M/S KRIPAL SINGH CONTRACTOR L2 | M/S UMA DEVI CONTRACTOR L1 | KAUSHIK CONSTRUCTION AND SUPPLIERS L3 |
|---|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | ||||||
| 1.01 | Dismantling Brick masonry work with Cement Mortar including stacking of material within 60-meter lead all complete as directed by the Engineer in charge. | 6.8 | M³ | 350 ₹2,380 | 360 ₹2,448 | 339 ₹2,305.20 |
| 1.02 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer in-charge up to distance of 30 M complete (Manual). | 43.52 | M³ | 115 ₹5,004.80 | 120 ₹5,222.40 | 114 ₹4,961.28 |
| 1.03 | Laying brick ballast of size 25-40 mm i/c all cost labour, T&P etc. but excluding cost of brick all complete as directed by the Engineer in charge. | 10.24 | M³ | 280 ₹2,867.20 | 250 ₹2,560 | 262 ₹2,682.88 |
| 1.04 | Supply and laying Plain cement concrete (P.C.C.) in 1 : 2 : 4 using size (10-20) mm graded crushed aggregate i/c all cost of material, Labour, T&P etc. all complete as directed by the Engineer in charge. | 10.24 | M³ | 4,420 ₹45,260.80 | 4,800 ₹49,152 | 4,712 ₹48,250.88 |
| 1.05 | Brick masonry with cement mortar of ratio 1:4 i/c all cost of material all labour, T&P and etc all complete as directed by the Engineer in charge. | 55.18 | M³ | 4,320 ₹2.4 L | 4,070 ₹2.2 L | 4,440 ₹2.4 L |
| 1.06 | Providing ordinary centring and shuttering of ply wood or steel for RCC work i/c all cost material, Labour T&P etc. all complete as directed by the Engineer in charge. | 40.37 | M² | 780 ₹31,488.60 | 760 ₹30,681.20 | 710 ₹28,662.70 |
| 1.07 | S/Laying reinforcement steel at site per M.T. including bending, binding, cutting and placing in position of reinforcement i/c cost of material, labour and T&P etc.all complete as directed by the Engineer in charge. | 0.3 | MT | 72,200 ₹21,660 | 68,000 ₹20,400 | 62,000 ₹18,600 |
| 1.08 | Supply and laying Cement concrete (M-25) in 1:1:2 i/c all cost of material, Labour, T&P etc. (Reinforced cement concrete) all complete as directed by the Engineer in charge. | 3.62 | M³ | 7,150 ₹25,883 | 6,500 ₹23,530 | 6,300 ₹22,806 |
| 1.09 | Struck Deep pointing in Cement Mortar of ratio 1:2 i/c all cost of material, labour T&P etc. all complete as directed by the Engineer in charge. | 22.64 | M² | 95 ₹2,150.80 | 100 ₹2,264 | 95 ₹2,150.80 |
Tender Value
₹5.8 L
EMD Value
₹12,000
Closing Date
27 Nov 2025, 12:10 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER AFZALGARH IRRIGATION DIVISION DHAMPUR
LOT18 Janpad Bijnor Mein Chakmani Alpika ke km. 1.500 par isthit chhatigrast V.R.B. ke punarnirmaan avam head regulator gate ki marammat/punaristhapna ka Karya.
2025_UPIDC_1086669_60
04/EEAID/2025-26
Open Tender
Civil Works
60 days
DHAMPUR
AS PER NIT
2 documents required · 2 mandatory
₹266
₹12,000
12 Mar 2026
22 Nov 2025
27 Nov 2025
22 Nov 2025
27 Nov 2025
22 Nov 2025
Amount
Laying and Jointing PVC Pipe. Heading
Dismantling Brick masonry work with Cement Mortar including stacking of material within 60-meter lead all complete as directed by the Engineer in charge.
Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer in-charge up to distance of 30 M complete (Manual).
Laying brick ballast of size 25-40 mm i/c all cost labour, T&P etc. but excluding cost of brick all complete as directed by the Engineer in charge.
Supply and laying Plain cement concrete (P.C.C.) in 1 : 2 : 4 using size (10-20) mm graded crushed aggregate i/c all cost of material, Labour, T&P etc. all complete as directed by the Engineer in charge.
Brick masonry with cement mortar of ratio 1:4 i/c all cost of material all labour, T&P and etc all complete as directed by the Engineer in charge.
Providing ordinary centring and shuttering of ply wood or steel for RCC work i/c all cost material, Labour T&P etc. all complete as directed by the Engineer in charge.
S/Laying reinforcement steel at site per M.T. including bending, binding, cutting and placing in position of reinforcement i/c cost of material, labour and T&P etc.all complete as directed by the Engineer in charge.
Supply and laying Cement concrete (M-25) in 1:1:2 i/c all cost of material, Labour, T&P etc. (Reinforced cement concrete) all complete as directed by the Engineer in charge.
Struck Deep pointing in Cement Mortar of ratio 1:2 i/c all cost of material, labour T&P etc. all complete as directed by the Engineer in charge.
Earth work in filling and stg. of damaged banks of canals/ Filling rain cuts/ damaged service road etc i/c lift upto 1.5 m & lead upto 1.0 Km distance, labour, T&P etc all complete as directed by the Engineer in charge.
Two coat of water proof cement paint Weather coat of approved quality on new surface to give an even shade including supply of all materials, labour, Tools & plant etc. required for proper all complete as directed by the Engineer in charge.
Writing letter including cost of material for sign board etc. i/c labour etc all complete as directed by the Engineer in charge.
Providing and Fixing R.C.C. (1:1:2) WHEEL GUARD of size (0.30*0.30*1.20) m incd all material labour T&P etc all complete as directed by the Engineer in charge.
Brick on edge floor with M-150 brick laid dry joints sand filled including preparation of proper slope and its ramming including supply of all materials. labour and T&P etc. required for proper completion of the work.
M/S KRIPAL SINGH CONTRACTOR (BID ID -5705553)
KAUSHIK CONSTRUCTION AND SUPPLIERS (BID ID -5696173)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_2008809.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid