Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC Q NO A 29 POWER CITY JAMNIPALI KORBA CG 495450 | JAMNIPALI | KORBA | CHHATTISGARH | 495450 | L1 | Accepted-AOC Technically and financially eligible L1 Bidder | |
| 2 | L2₹7.4 L+₹63,843.66 (9.40%)Rejected-Finance 483 PODI BAHARA WARD NO 21 KORBA CHATTISGARH | KORBA | CHHATTISGARH | 495677 | L2 | Rejected-Finance Not L1 Bidder | |
| 3 | L3₹7.8 L+₹98,154.52 (14.4%)Rejected-Finance KORBA | KORBA | CHHATTISGARH | 495119 | L3 | Rejected-Finance Not L1 Bidder | |
| 4 | L4₹8.0 L+₹1.2 L (18.1%)Rejected-Finance MIG NO II 41 PANDIT RAVI SHANKAR SHUKLA NAGAR KORBA CG 495677 | KORBA | CHHATTISGARH | 495677 | L4 | Rejected-Finance Not L1 Bidder |
Tender Value
₹14.5 L
EMD Value
₹18,200
Closing Date
12 Oct 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
STAFF OFFICER (CIVIL) KORBA AREA
Office of the General Manager, South Eastern Coalfields Limited, CIVIL DEPARTMENT, KORBA AREA KORBA- 495 677(CG)
All mines Closure activities of Banki 7 and 8 and Banki 5 and 6 inclines at Banki Sub area of Korba Area
2024_SECL_318407_1
SECL/GM/KA/C/e-Tender/24-25/44 dt.28.09.2024
Open Tender
Civil Works - Others
Item Rate
45 days
Office of the General Manager, Korba Area, SECL
As per NIT
3 documents required · 3 mandatory
₹18,200
26 Dec 2024
30 Sept 2024
14 Oct 2024
1 Oct 2024
12 Oct 2024
1 Oct 2024
1 Oct 2024 - 5 Oct 2024
Amount
Dismantling of existing service /office building of Banki 5/6 & 7/8 mines
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. In cement mortar
INCLINE SEALING AND STRENGTHENING OF BANKI 5/6 & 7/8 mines
Brick work with clay flyash F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor five level in : - Cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand)
CLEARING OF DEBRIS AT BANKI 5/6 & 7/8 mines
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
BEAUTIFICATION OF PREMISES OF BANKI 5/6 & 7/8 mines
Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m.All kinds of soil .
CLEANING OF DRAINS OF BANKI 5/6 & 7/8 mines
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil
PROVIDING WARNING SIGN BOARDS AT BANKI 5/6 & 7/8 mines
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work.
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Lettering with black Japan paint of approved brand and manufacture
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
FENCING OF BANKI 5 & 6 MINE
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. ALL KINDS OF SOIL
Supplying at site. R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately).
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
FENCING OF BANKI 7& 8 MINE
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. ALL KINDS OF SOIL
Supplying at site. R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately).
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
CRACK/POT HOLE FILLING BANKI 7 & 8 MINE
Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m : All kinds of soil
DOZING/LEVELLING OF BANKI 7&8 MINE
Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m : All kinds of soil
DRAIN CUTTING OF BANKI 7 & 8 MINE
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil
Total impact of GST for the purpose of CTC
SAMEER ENGINEERING WORKS
S.B Construction
BLUE POWER
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_330043.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .