| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.1 LAccepted-AOC 4 13A PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹5.1 L Quoted ₹4.4 L | 1 | Accepted-AOC L1 |
| 2 | 2₹4.5 LRejected-AOC 36 151 E 73 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 02 | ₹4.5 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | ANNAI ENTERPRISES L1 | SRI VAITHEESWARA CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | 5) Transporting the released vent condenser tube nest from central stores to Unit-II repair bay. | 1 | No | 17,660 ₹17,660 | 18,000 ₹18,000 |
| 2.00 | Lifting the tube nest by EOT crane with necessary lifting tackles, filling the tubes by water with necessary arrangements, Inspecting the punctured tubes and plugging the punctured tubes on both sides . | 1 | No | 19,450 ₹19,450 | 20,000 ₹20,000 |
| 3.00 | 6) Lifting the spare tube nest from “ O” Metre unit –II repair bay to Deaerator floor level by using mobile crane. | 1 | No | 19,200 ₹19,200 | 20,000 ₹20,000 |
| 4.00 | Shifting/dragging the spare tube nest from top of unit –II at (32 mtr level) Deaerator floor level to Unit-3 Deaerator floor. | 1 | No | 28,250 ₹28,250 | 29,000 ₹29,000 |
| 5.00 | Lifting it and placing it on the vent condenser platform and shifting and placing the new tube nest to the vent condenser shell. | 1 | No | 40,780 ₹40,780 | 41,000 ₹41,000 |
| 6.00 | 8) Positioning the tube nest inside the shell and assembling of water box and all connected pipe lines after providing gaskets and tightening of all flanges stud and nut etc. | 1 | No | 16,110 ₹16,110 | 17,000 ₹17,000 |
| 7.00 | Labour charges for replacement of valves, pipes, stubs, bends and Reducers by Non IBR welding works.
Vent condenser to Deaerator connected modification of existing 4” syphon line into 6” syphon and providing the 6” flanges in the existing vent condenser by pass line. | 43 | Joints | 1,425 ₹61,275 | 1,500 ₹64,500 |
| 8.00 | Charges for 1 No. 50 T mobile crane for lifting the spare vent condenser tube nest from ‘0’ mtr to ‘32’ mtr height of Deaerator floor and removal of existing tube nest from 32 mtr height to ‘0’ mtr. | 1 | No | 1,48,800 ₹1.5 L | 1,49,000 ₹1.5 L |
| 9.00 | Brass plugs Size 20x16x30 mm | 400 | Nos | 202 ₹80,800 | 210 ₹84,000 |
| 10.00 | Cost of welding electrodes for Non-IBR welding. (For Item Sl.No:1 & 3) | 301 | Nos | 7.25 ₹2,182.25 | 7.5 ₹2,257.50 |
Tender Value
Refer Docs
EMD Value
₹4,700
Closing Date
28 Apr 2025, 9:00 amClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I TM Unit III Transporting Lifting and reassembling of Vent condenser tube nest modification of 4 syphon line into 6 syphon line and providing 6 flanges in vent condenser by pass line during Unit III 2025 26
2025_EB_544427_1
CE / MTPS-I / SE / M-I / TM /OT. 17 / 2025-26
Open Tender
Power/Energy Projects/Products
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹4,700
Yes
13 May 2026
11 Apr 2025
29 Apr 2025
11 Apr 2025
28 Apr 2025
11 Apr 2025
Amount
5) Transporting the released vent condenser tube nest from central stores to Unit-II repair bay.
Lifting the tube nest by EOT crane with necessary lifting tackles, filling the tubes by water with necessary arrangements, Inspecting the punctured tubes and plugging the punctured tubes on both sides .
6) Lifting the spare tube nest from “ O” Metre unit –II repair bay to Deaerator floor level by using mobile crane.
Shifting/dragging the spare tube nest from top of unit –II at (32 mtr level) Deaerator floor level to Unit-3 Deaerator floor.
Lifting it and placing it on the vent condenser platform and shifting and placing the new tube nest to the vent condenser shell.
8) Positioning the tube nest inside the shell and assembling of water box and all connected pipe lines after providing gaskets and tightening of all flanges stud and nut etc.
Labour charges for replacement of valves, pipes, stubs, bends and Reducers by Non IBR welding works. Vent condenser to Deaerator connected modification of existing 4” syphon line into 6” syphon and providing the 6” flanges in the existing vent condenser by pass line.
Charges for 1 No. 50 T mobile crane for lifting the spare vent condenser tube nest from ‘0’ mtr to ‘32’ mtr height of Deaerator floor and removal of existing tube nest from 32 mtr height to ‘0’ mtr.
Brass plugs Size 20x16x30 mm
Cost of welding electrodes for Non-IBR welding. (For Item Sl.No:1 & 3)
Cost of Cutting Gas for cutting the pipes, valves & bends wherever necessary.
Consumables and T & P Charges for Item Sl.No: 1 to 7
SRI VAITHEESWARA CONSTRUCTIONS (BID ID -1307129)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_649056.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid