| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 CrAccepted-AOC DILLIGHAT NO 2 CHAIKYA GAON NAMRUP THERMAL POWER STATION NAMRUP DIBRUGARH ASSAM 786622 | DIBRUGARH | ASSAM | 786622 | ₹10.0 Cr | L1 | Accepted-AOC AWARDED |
| 2 | L2₹10.0 Cr+₹63,126.67 (0.06%)Rejected-AOC GELAPUKHURI CITY TOWN TINSUKIA P O TINSUKIA P S TINSUKIA DIST TINSUKIA PIN 786125 | TINSUKIA | ASSAM | 786125 | ₹10.0 Cr+₹63,126.67 (0.06%) | L2 | Rejected-AOC Not Qualified for AOC |
| Sl No | Description | Qty | Unit | M/S PRADIP KUMAR ADHYAPAK L2 | SANTOSH GARODIA L1 |
|---|---|---|---|---|---|
| 1.00 | Felling trees including uprooting roots and stumps up to 50 cm. below ground, cutting into pieces and removing the same from the site of work etc. complete as directed.Trees above 0.50 m and up to 1 m girth: | 588 | Each | 248.08 ₹1,45,871.04 | 248 ₹1,45,824 Lowest |
| 2.00 | Cutting bamboo, uprooting roots & stumps including removing them from the site of work, etc. complete as directed. | 2,352 | Sqm | 673.18 ₹15,83,319.36 | 673 ₹15,82,896 Lowest |
| 3.00 | Earthwork in grabbing the seat of the embankment up-to 0.3 m depth by mechanical means and depositing the soils outside the country side toe of the proposed structures, etc. complete as directed. | 1.55 | Hec | 32,667.62 ₹50,634.81 | 32,667.5 ₹50,634.63 Lowest |
| 4.00 | Earth work in excavation by hydraulic excavator, to proper grade and slopes as required including utilizing the spoils for filling works in the vicinity including removing roots & vegetation, dressing to design section etc. complete as directed. Ordinary Soil, For depth up to 3.00 m | 62,400 | Cum | 130.44 ₹81,39,456 | 130.3 ₹81,30,720 Lowest |
| 5.00 | Earth work in embankment by tractor trailer carriage by Mechanical means with locally available ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 25 cm thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 4cm cube, dressing as per design section and compaction with three wheel static roller of 80-100 KN capacity in layers not exceeding 30 cm in thickness and core cutter soil test at every layer and every 500m distance, etc. complete as directed.
For initial lead upto 1 km for all lifts.(Distance=1.00km) | 1,23,534 | Cum | 277.53 ₹3,42,84,391.02 | 277.5 ₹3,42,80,685 Lowest |
| 6.00 | Turfing with grass sods of largest possible rectangles of 12 cm. minimum thickness placed closely including dressing earth pegging with Jati bamboo split, watering till the grass grows for a lead up to 90 m and all lifts, etc. complete as directed. | 1,23,756 | Sqm | 30.18 ₹37,34,956.08 | 30 ₹37,12,680 Lowest |
| 7.00 | Supply of geo textile tube (Mega Container) with the minimum properties as mentioned below: - o Polymer: PP of 400 GSM or above o Tube Circumference: 10m + 5% o Fill Port (diameter): 30 to 45 cm o Tensile Strength (MD): ≥ 100 kN/m o Tensile Strength (CD): ≥ 100 kN/m o Elongation - MD: ≤ 25% * AOS: ≤ 0.180 nim o Permittivity: ≥ 0.40 S-1 o Length: 25 m. | 240 | Tube | 1,08,222.11 ₹2,59,73,306.4 | 1,08,222 ₹2,59,73,280 Lowest |
| 8.00 | Filling of geo-tubes (25m long and 10m circumference) with sand of volume 176 cum by using mud pump not below the fill height of 1.60m as per drawing and technical specifications, binding the tube with 9mm nylon rope to jati bamboo pegs of length 2m placed 5m c/c along both sides of the tube and at both ends to keep the tube in position during filling, as specified and directed including all loading, unloading and handling charges and local carriage upto a distance of 250M, pumping slurry using mud pump from a distance upto 500m, etc. including setting up of the tube laying platform complete as directed. | 240 | Tube | 62,292.15 ₹1,49,50,116 | 62,292 ₹1,49,50,080 Lowest |
| 9.00 | Construction of temporary shed of two roof with mud plinth of 0.45 m height above ground level with Bhaluka bamboo post 1.5 m apart, driven at atleast 0.75 m below ground and height above plinth of 2.5m. Split Jatti bamboo/tarza wall 10 cm thick touch roofing over bamboo rua frame, placing at 0.15 m clear apart, fitted with bamboo kamies from binding doors and windows with Bamboo Chattai, strengthening with Bamboo frame binding with wire, roofing with TATA Shaktee roofing sheets etc., complete as directed. (Using Bhaluka Bamboo at the rate of 6.00 nos/ Rm & Jati Bamboo at the rate of 61.00nos / Rm) | 88 | Sqm | 2,707.26 ₹2,38,238.88 | 2,707 ₹2,38,216 Lowest |
| 10.00 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
A) With Crushed Stone
II) P.C.C. grade M 20
(i) Nominal mix (1:2:4) | 360.79 | Cum | 7,612.75 ₹27,46,604.07 | 7,612.7 ₹27,46,586.03 Lowest |
Tender Value
₹10.0 Cr
EMD Value
₹19.9 L
Closing Date
30 Jan 2026, 2:00 pmClosed
Chief Engineer, Water Resources Department
Assam Water Centre, O/o the Chief Engineer, WRD, 5th Floor, Basistha, Guwahati-29.
Raising and Strengthening to Sassoni -Tingkhong Bund from Amguri to Uriamguri on the left bank of river Buridehing including construction of existing damaged sluice gate at Uriamguri.
2026_DoWR_50442_1
DIBRUGARH/2025-26/M AND R/II
Open Tender
Civil Works
Works
120 days
Uriamguri
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
₹19.9 L
Yes
16 Jun 2026
21 Jan 2026
30 Jan 2026
21 Jan 2026
30 Jan 2026
26 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Felling trees including uprooting roots and stumps up to 50 cm. below ground, cutting into pieces and removing the same from the site of work etc. complete as directed.Trees above 0.50 m and up to 1 m girth: | 588 | Each | 248.08 | ₹1,45,871.04 |
| 2 | Cutting bamboo, uprooting roots & stumps including removing them from the site of work, etc. complete as directed. | 2,352 | Sqm | 673.18 | ₹15,83,319.36 |
| 3 | Earthwork in grabbing the seat of the embankment up-to 0.3 m depth by mechanical means and depositing the soils outside the country side toe of the proposed structures, etc. complete as directed. | 1.55 | Hec | 32,667.62 | ₹50,634.81 |
| 4 | Earth work in excavation by hydraulic excavator, to proper grade and slopes as required including utilizing the spoils for filling works in the vicinity including removing roots & vegetation, dressing to design section etc. complete as directed. Ordinary Soil, For depth up to 3.00 m | 62,400 | Cum | 130.44 | ₹81,39,456 |
| 5 | Earth work in embankment by tractor trailer carriage by Mechanical means with locally available ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 25 cm thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 4cm cube, dressing as per design section and compaction with three wheel static roller of 80-100 KN capacity in layers not exceeding 30 cm in thickness and core cutter soil test at every layer and every 500m distance, etc. complete as directed.
For initial lead upto 1 km for all lifts.(Distance=1.00km) | 1,23,534 | Cum | 277.53 | ₹3,42,84,391.02 |
| 6 | Turfing with grass sods of largest possible rectangles of 12 cm. minimum thickness placed closely including dressing earth pegging with Jati bamboo split, watering till the grass grows for a lead up to 90 m and all lifts, etc. complete as directed. | 1,23,756 | Sqm | 30.18 | ₹37,34,956.08 |
| 7 | Supply of geo textile tube (Mega Container) with the minimum properties as mentioned below: - o Polymer: PP of 400 GSM or above o Tube Circumference: 10m + 5% o Fill Port (diameter): 30 to 45 cm o Tensile Strength (MD): ≥ 100 kN/m o Tensile Strength (CD): ≥ 100 kN/m o Elongation - MD: ≤ 25% * AOS: ≤ 0.180 nim o Permittivity: ≥ 0.40 S-1 o Length: 25 m. | 240 | Tube | 1,08,222.11 | ₹2,59,73,306.4 |
| 8 | Filling of geo-tubes (25m long and 10m circumference) with sand of volume 176 cum by using mud pump not below the fill height of 1.60m as per drawing and technical specifications, binding the tube with 9mm nylon rope to jati bamboo pegs of length 2m placed 5m c/c along both sides of the tube and at both ends to keep the tube in position during filling, as specified and directed including all loading, unloading and handling charges and local carriage upto a distance of 250M, pumping slurry using mud pump from a distance upto 500m, etc. including setting up of the tube laying platform complete as directed. | 240 | Tube | 62,292.15 | ₹1,49,50,116 |
| 9 | Construction of temporary shed of two roof with mud plinth of 0.45 m height above ground level with Bhaluka bamboo post 1.5 m apart, driven at atleast 0.75 m below ground and height above plinth of 2.5m. Split Jatti bamboo/tarza wall 10 cm thick touch roofing over bamboo rua frame, placing at 0.15 m clear apart, fitted with bamboo kamies from binding doors and windows with Bamboo Chattai, strengthening with Bamboo frame binding with wire, roofing with TATA Shaktee roofing sheets etc., complete as directed. (Using Bhaluka Bamboo at the rate of 6.00 nos/ Rm & Jati Bamboo at the rate of 61.00nos / Rm) | 88 | Sqm | 2,707.26 | ₹2,38,238.88 |
| 10 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
A) With Crushed Stone
II) P.C.C. grade M 20
(i) Nominal mix (1:2:4) | 360.79 | Cum | 7,612.75 | ₹27,46,604.07 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
biddocumenturiamguriDibrugarh.pdf
Tender Documents • 1.38 MB
BOQ_80309.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .