SUPERINTENDING ENGINEER
SE MPPKVV CO LTD KHARGONE
Empanelment of contractors to award a Rate Contract Award for Replacement of Broken Damaged Poles or New Construction Works Under O and M Circle Khargone
2026_MPPKV_482982_1
002/8178dtd06-02-2026
Open Tender
Electrical and Maintenance Works
Percentage
180 days
KHARGONE
as per tender documents
3 documents required · 3 mandatory
₹5,000
₹42,260
Yes
SE MPPKVV CO LTD KHARGONE
25 Mar 2026
17 Feb 2026
17 Mar 2026
17 Feb 2026
16 Mar 2026
17 Feb 2026
27 Feb 2026
Empanelment of contractors to award a RCA
Empanelment of contractors to award a Rate Contract Award (RCA) for Replacement of Broken Damaged Poles/New Construction Works Under O&M Circle Khargone.
M.P. PASCHIM KSHETRA VIDYUT VITRAN COMPANY LIMITED (STC) SUB DIVISION KHARGONE
LABOUR SCHEDULE FOR ERRECTION OF Line Work
Total
Triming of Trees
Pole Errection Including Transportation Charges
Pole Errection 140 Kg Poles including earthing & back filling with boulder's
Pole Errection 280 Kg Poles including earthing & back filling with boulder's
Errection of R.S. Joist 9 Mtr. Long
Erraction of H.Beam / Rail Pole 9 Mtr. Long
Erraction of H.Beam / Rail Pole 11 Mtr. Long
Erraction of H.Beam / Rail Pole 13 Mtr. Long
Labour charges for Concreting (1:3:6) material
Concreting of Steel Support with muffing including Labour Charges as per Cost Schedule Rate 2022-23
PCC Pole 8 mtr. 140 Kg (0.30 cmt.)
PCC Pole 9.1 mtr. 280 Kg (0.50 cmt.)
R.S. Joist/H.Beam/ Rail Pole 9 Mtr. Long (0.65 cmt)
R.S. Joist/H.Beam/ Rail Pole 11 Mtr. Long (0.70 cmt)
R.S. Joist/H.Beam/ Rail Pole 13 Mtr. Long (0.94 cmt)
Fixing LT Cross 4 pin
Fixing LT Shakle Insulator
Fixing of Suspension Clemp with attachment
LT Cable tension clamp (Galvanized Stay Set)
STAY SET
(1) Normal Soil
(2) Soft Rock / Hard Soil
(3) Hard Rock (Blasting/ Drilling)
(1) Normal Soil
(2) Soft Rock / Hard Soil
(3) Hard Rock (Blasting/ Drilling)
Concreting of Stay including Labour charges as per Cost Schedule Rate 2022-23
Stay Set 16 MM (0.20 Cmt)
Stay Set 20 MM (0.30 Cmt)
Labour charges for Concreting (1:3:6) material
ACSR/AAAC CONDUCTOR
Rabbit conductor 0.05 sq. inch (50 sq.mm. Al.Eq.)
Conversion of 11 KV Line single phase to three phaseRabbit conductor 0.05 sq. inch (50 sq.mm. Al.Eq.)
Raccoon conductor 0.075 sq. inch (80 sq.mm. Al.Eq.)
Dog conductor 0.10 sq. inch. (100 sq.mm. Al.EQ.)
String of LT Line Including Paying Out tensioning of
(A) With Rabbit Conductor (1 No. Cond.)
(A) With Rabbit Conductor (3 No. Cond.)
(B) With Weasel Conductor (1 No. Cond.)
(C) Laying of Overhead AB cable 3 x 25+1x16+1x35 sqmm
(D) Laying of Overhead AB cable 3 x 35+1x16+1x35 sqmm
(E) Laying of Overhead AB cable 3 x 50+1x16+1x35 sqmm
(F) Laying of Overhead AB cable 3 x 95+1x16+1x50 sqmm
Survey of 11/ 33 KV Line
Fixing of 11 KV 'V' Cross arm
Fixing of 33 KV 'V' Cross arm
Fixing of 11 KV Pin Insulator with G.I. Pin
Fixing of 33 KV Pin Insulator with G.I. Pin
Fixing of 11 KV Disc Insulator with H/w
Fixing of 33 KV Disc Insulator with H/w
Fixing of DC cross arm 4'C D.P
Fixing of DC Cross arm 8' center
Fixing of Transformer Structure
Fixing of D.O. Channel
Fixing of Lighting Arrestor (3Nos)
Fixing of D.O. Fuse Unit (3 Nos)
Fixing of DC Cross arm 5' center
11 KV Signle pole cut point
33 KV Single pole cut point
Installation of X'mer on structure
(1) 25 KVA X'mer
(2) 63 KVA X'mer
(3) 100 KVA X'mer
(4) 200 KVA X'mer
Handling & Installation of Dist. Box on D.P. Complete
(1) 25 KVA X'mer
(2) 63 KVA X'mer
(3) 100 KVA X'mer
(4) 200 KVA X'mer
Jumper work at D.P. & Transformer
Fixing of LT Cable at 11/0.4 KVA S/s
Fixing of 11 KV Special Bracket
Fixing of 33/11 KV Danger Board on Pole
Fixing of 33 KV AB Switch
Fixing of Anti Climbing device with Barbed wire
Fixing & installation of per mounted service connection distribution box spring loaded for 16/25/35 sq mm cable
Dis connection and reconnection of exiting LT service line (All size) at consumer premised for single phase connection due to change of bare conductor to cable in LT line
Dis connection and reconnection of exiting LT service line (All size) at consumer premised for Three phase connection due to change of bare conductor to cable in LT line
Labour Charge for cutting of R.S.Joist/ H-Beam/ Rail Pole
Painting of Steel Structure with 2 coat of Red oxide paint and 2 coat of Aluminium paint
Painting without material
Painting with material
Labour Charges for Dismentling Line @ 50%
Cable Dismentled 3x50+1x16+1x35 sq mm
Total
Add : - CGST @ 9%
Add : - SGST @ 9%
Grand Total
Total Amt (GST Extra)
Superintending Engineer (O&M)
M.P.P.K.V.V.CO.LTD-Khargone
stage.html
html • 0.04 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
tender482982.pdf
Tender Documents • 0.46 MB
BOQ_567662.xls
BOQ • 0.30 MB
brokenpolecorri.pdf
PDF • 1.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .