Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical BATHINDA | BATHINDA | PUNJAB | 151001 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 102 RAVINDRA NAGAR OLD PALASIA INDORE MADHYA PRADESH | INDORE | INDORE | MADHYA PRADESH | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical POST OFFICE ROAD JANPAD ETAH UTTAR PRADESH | ETAH | ETAH | UTTAR PRADESH | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹74.1 Cr
EMD Value
₹74.1 L
Closing Date
14 May 2026, 11:00 amClosed
Regional Officer-UP West
3/248, Vishal Khand, Gomti Nagar, Lucknow-226010
Strengthening and overlay on various stretches of Lucknow ring road pkg-3A from Km 64.900-64.380 to Km 79.516-79.000 in the state of Uttar Pradesh at Risk and Cost of existing Contractor on percentage rate basis in the state of Uttar Pradesh
2026_NHAI_276248_1
NHAI/PIU-LKO/LRR Pkg-3A/2026
Open Tender
Civil Works - Highways
Percentage
180 days
Lucknow
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
NHAI
₹74.1 L
15 May 2026
30 Apr 2026
15 May 2026
30 Apr 2026
14 May 2026
30 Apr 2026
Invitation of e-quotation from Empanelled agencies “Strengthening and overlay on various stretches of Lucknow ring road pkg-3A from Km 64.900/64.380 to Km 79.516/79.000 in the state of Uttar Pradesh at Risk and Cost of existing Contractor on percentage rate basis” in the state of Uttar Pradesh.
Bill No.
Bill No.-1
Bill No.-2
Bill No.-3
SOR Item No. MP PWD SOR 2022
Chainage
SOR Item No. MP PWD SOR 2022
Total Area
MPPWD SOR-22 Item No.
Ordinary soil
Mechanical Means
RCC Grade M20
Item Description
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per relevant clauses of section 300 & 2100 in
Ordinary soil
Mechanical Means
Providing Plain cement concrete M-15 nominal mix in foundation as per relevant clauses of sections 1500, 1700 and 2100.
Provdiing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with
RCC Grade M20
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications and as per relevant clauses of section 1600.
Embankment Construction with Material Obtained from Borrow Pits Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevant clauses of section-300. (For Slope and Quadrant Pitching)
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
Stone/Boulder
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
Total =
Cast in Situ Cement Concrete M20 kerb (Discontinuous Kerb along Pitching) Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-15grade 150 mm thick, or with kerb laying machine, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409 (Using Concrete Batching and Mixing Plant)
MPPWD SOR-22 Item No.
a) Using Batch Mix Plant of appropriate capacity (vi) for Grading-II ( 30-40 mm thickness ) Bitumen Content minimum 5.4% with 30/40bitumen (VG-40)
Triangular 900 mm side
600 mm dia circular sign
Item Name
PCC Dismentling
Excavation upto GSB
PCC M-15 on Approach slab
RCC M-30 on Approach slab
prime coat
Tack Coat
Crash barrier Concrete RCC M-40
Particular
Total Length of Shivpuri-Jhansi Section (1251+814 to 1305+087) (LHS+RHS)=
Length of BC Overlay-3 Stretch Under DLP (LHS+RHS)=
Length of Microsurfacing Work-2 under DLP (LHS+RHS)=
Length of Microsurfacing Work-1 under DLP (LHS+RHS)=
Total Length Under DLP
Balance NON-DLP Length (LHS+RHS) (1-5)
Balance NON-DLP Length where Overlay work is required on Emergent Basis
Inspection Date of RFI
Total
Inspection Date
Date of Inspection
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
Appendix-I-BOQ.xls
Tender Documents • 0.14 MB
EquotationLucknowRingRoadPkg-3A.rar
Tender Documents • 6.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .