| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.3 LAccepted-AOC | L1 | Accepted-AOC L1 BIDDER | |
| 2 | Rejected-Technical | - | Rejected-Technical Deficient in PQC | |
| 3 | Rejected-Technical | - | Rejected-Technical Deficient in PQC |
Tender Value
₹38.4 L
EMD Value
₹80,000
Closing Date
23 Mar 2023, 6:00 pmClosed
CWE
HQ 136 WORKS ENGINEERS PIN - 914136 C/O 99 APO
PROVN OF SOLAR POWER PLANT AND SOLAR TREE AT GANGTOK MIL STN UNDER GE GANGTOK (4th CALL)
2022_MES_521374_4
CWE/136-WE/01 OF 2022-23
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Gangtok
Class D, Category b(I)
8 documents required · 8 mandatory
₹500
GE Gangtok
₹80,000
13 Sept 2023
25 Feb 2023
24 Mar 2023
25 Feb 2023
23 Mar 2023
9 Mar 2023
25 Feb 2023 - 1 Mar 2023
Amount
Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:-
a) Solar Photovoltaic Module of capacity 335 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency.
Desig .S pply,installation, testing & commissioning of "Solar Tree PV generationplant" of 6KW capacity with battery backup, 3 phase 415 Volt AC output,Hybrid grid tied with Solar Photo voltaic modules with minimum 500Wp rating Mono crystalline Silicon PV Modules, open circuit voltage (Voe) 49.20 , Short circuit Current (lsc) 8.6 Amp, Optimum operating Voltage (Vmp) 41.70 Volt & optimu m operating current (Imp) 11.99 Amps including civil foundation work for Module Mounting Pole S!ructures, safty control! device switches,SPD, array junction box induding string combiner box (SCB) with IP 65 complete with NET metering system devices with including as folowing components:- (a) Solar Photo Voltaic mono crystalline Silicon Modules for Capacity 500Wp x 12 Nos= 6000, Total Rating 6KWp. (b) Civil and general works for foundation errection- 01 Nos (Each 06KW Solar Tree Plant) (c) Solar Tree Leaf Structure - 01 Nos (Each 6 KW Solar Tree with 4 Branches with 3 leafs.Solar Structure shall be Non-corrosive & electrolytically, Anodise weather proof & dust proof. (d) Power Conditioning unit (Solar Hybrid Inverter) susitable for 6KWp Solar Tree Plant & outdoor type with safety device & Net Metering unit for ON-Grid. (e) Control Cables & connected accessories for connection (from Solar Tree to Inverter). (f) Lightening conductor, Earthing & its Connected works for Solar Tree & Inverter. (g) DCDB and ACDB. Note: (i) The Complete Solar Tree PV generation Plant & design shall be done from SECI/MNRE approved and compliance with standards and latest IS/IEC code (IEC 612215, IIS 14286, IEC 61730 Part-I & II) and latest guidelines and specifications of SECI/MNRE. (ii) All foundation & fixing arrangement shall be in according to manufactures drawing. (iii) Testing & commissioning will be done under supervision of channel partner/ Enginers of Manufactures Rep and all the necessary engineering requirements for testing and inspection layout shall be fulfilled by contractor at site during work executions. (iv) S&F LT cable of size 35 sqmm 3.5core -15RM duly connected with LT panel & Solar tree panel is incJ1,duo
Complete design,Engineering,Manufacturing,Supply , storage ,Civil works,Erection,Testing Commissioning as per the Sikkim State policies of ground mounted On Grid Solar tree(hydrid type with grid islanding feature) of aggregate capacity 6KWp with Battery backup at Bldg No. P-53 including operation & Maintenance for a period of 5 years.(Note:- Battery shall be provide of 08 Nos tall tubular solar battery ,C10,150 AH,12v with 08 years warranty).
Note 1:- (Applicable for all parts/items) : The bidders/contractors are advised to read tender document, all drawings & all corrigendum/ amendments and general condition of contracts before entry/quoting the rates. Note 2:- Attention to bidder is hereby invited to upload revised BOQ if published during their bid submission. Uploading of incorrect/ pre-revised BOQ shall be treated as non bonafide and rejected.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .