| 1 | L10₹67.6 LAccepted-AOC VILLAGE PIPRA P O RAMCHANDRAPUR P S DEVIPUR DIST DEOGHAR | ₹67.6 L | L10 | Accepted-AOC Vide SE MI Deoghar, Lt. No. 47 Dt.31.01.26 |
| 2 | L-1₹42.0 LRejected-Finance | ₹42.0 L | L-1 | Rejected-Finance Vide SE MI Deoghar, Lt. No. 47 Dt.31.01.26 |
| 3 | L2₹45.6 LRejected-Finance VILLAGE TILWARIYA PANCHAYAT JARKA 2 P O NANHIDIH POLICE STATION SONARAYTHADHI BLOCK SONARAYTHADHI SUB DIVISION AND DISTRICT DEOGHAR | DEOGHAR | JHARKHAND | 814112 | ₹45.6 L | L2 | Rejected-Finance Vide SE MI Deoghar, Lt. No. 47 Dt.31.01.26 |
| 4 | L3₹47.6 LRejected-Finance PALAMU | JHARKHAND | 822101 | ₹47.6 L | L3 | Rejected-Finance Vide SE MI Deoghar, Lt. No. 47 Dt.31.01.26 |
| 5 | L4₹48.2 LRejected-Finance | ₹48.2 L | L4 | Rejected-Finance Vide SE MI Deoghar, Lt. No. 47 Dt.31.01.26 |
Tender Value
₹68.9 L
EMD Value
₹1.4 L
Closing Date
27 Nov 2025, 5:00 pmClosed
EE, MIDDDC, Deoghar
EE, MIDDDC, Deoghar
Construction of Check Dam at Bangora Joriya under Block - Devipur, District - Deoghar
2025_WRD_106632_11
WRD/MIDDDC/DEO/F2-07/2025-26
Open Tender
Civil Works
300 days
Block - Devipur, Dist - Deoghar
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.4 L
5 Feb 2026
15 Nov 2025
28 Nov 2025
15 Nov 2025
27 Nov 2025
15 Nov 2025
E/W in excavation in canal by the hydraulic excavators as per designed section in all kinds of soil, soil mixed with kankar, pebbles and boulders upto 300 mm size and disposal of soil upto 500M with all lifts by tipper including construction and maintenance of haul road all complete as per specification and direction of E/I. (7.1.43.2 P-138, WRD, Part - B)
Earth work in excavation of foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth so obtained (50M away from the edge of the trenches) with initial lead of 150M and initial lift of 1.5M as per specification and direction of E/I. (Item no.-6.1.8,Page no.-119,WRD Part-B)
Earthwork in excavation of foundation trenches of toe wall , spillway, head regulator, intake-well and outlet etc as per designed section in odinary rock or soft rock(where blasting is not needed)(vide classification of soil vide item C) with disposal of soil (beyond 50m from the edge of treanches) with initial lead of 150m and lift of 1.5m as per specification and direction of E/I.(Item no- 5.1.15.2 WRD part B)
Providing and laying in position cement concrete of specified grade M-150 (1:2:4 1 cement: 2 coarse sand (Zone-III): 4 graded stone graded aggregate 20mm nomial size) excluding the cost of centering and shuttering- all work upto plinth level. (Item No.-5.3.1.2,Page-106 BCD part-B) (A) Foundation Item No.- 5.3.1.2 (Page-106 BCD Part-B)
Providing and Laying cement concrete in retaining walls, return walls, walls(any thickness) including attached pilasters, ccolumns, piers, abutments, pillars, posts, struts, buttresses, string or lacing cources, parapets,coping,bed blocks,anchor blocks, plain window sills, fillets, sunken floor etc., up to floor level five, excluding the cost of centering, shuttering and finishing. grade M-150(1:2:4 1 cement:2 coarse sand (Zone-III):4 graded stone aggregate 20mm nomial size) Couping Item No.- 5.3.2.2 (Page-106 BCD Part-B)
Providing rough dressed random rubble stone masonary in C.M.(1:4) in foundation with approved quality of coarse sand of requisite F.M. washed and screened with racking out joints,curing,scaffolding and its removal where ever required including royalty and all taxes etc. complete job as per specification and direction of E/I.(5.2.28,SL.No.4.28,Part-A)
Providing rough dressed random rubble stone masonary in C.M.(1:4) in superstructure with approved quality of coarse sand of requisite F.M.(2.5 to 3.0) washed and screened with racking out joints,curing,scaffolding and its removal where ever required including royalty and all taxes etc. complete job as per specification and direction of E/I.(5.2.31,SL.No. 4.31,P-204,Part-A)
Reinforced cement concrete work in walls (any thickness),including attached pilasters,buttresses,plinth and string courses,fillets,columns,pillars,piers,abutments,posts and struts etc.above plinth level up to floor level,excluding cost of centering,shuttering,finishing and reinfircement. 1:1.5:3 (1 cement:1.5 coarse sand (zone-III):3 graded stone aggregate 20mm nomial size) (Sl.No.-5.3.10,P-107, BCD Part-B)
Providing 25mm thick cement plaster (1:4) with approved quality of sand of requisite F.M. Washed and screened including where ever required and it's removal,royalty and all taxes etc. complete job as per specification and direction of E/I.(5.7.12,SL.No.3.12,P-200,Part-A)
Providing weep holes with dry graded stone filter of 20mm to 40mm size in abutment and wing wall as per specification and direction of E/I. (6.7.6,SL.No6.9,P-209,Part-A)
Centring and shuttring including strutting proping etc. and its removal of form Foundation, Footing bases of columns etc for mass concreate. (item no 5.3.17.1BCD)
Centring and shuttring including strutting proping etc and its removal of form Lintels, beam, plinth beam, girders bressumers and contilivers. (item no 5.3.17.5 BCD)
Supplying and laying boulder in rock toe,heel trenches of the dam as per design & drawing including the cost of materials,royalty and all taxes etc.But excluding the cost of carraiges all complete job as per specification and direction of E/I.(5.6.4, SL No. 6.4,P-209,Part-A)
Providing M.S reinforcement (Tor steel) 8mm dia.rods as per approved design and drawing removal of rust,cutting bending including supplying annealed wire,placing M.S rods in position all complete job as per specification and direction of E/I.(SL.No.5.5.4,P-119,BCD,Part-B)
Supplying 300mm dia.NP2 R.C.C Hume Pipe with Collar (Part-A,Page-83,Sl.No.-14)=Rs.510.00 Add 10% C.P=Rs561.00
Labour for laying,fitting and fixing NP2 300mm hume pipe with collars in line,level and grade as well as providing approved jointing materials and joints properly filled to make them water proof all complete as per specification and direction of E/I. (Item No.-7.6.1.3,page-149 WRD Part-B)
Earthwork in filling in foundation or back filling of masonary structure with semi pervious suitable earth in layers, not exceeding 150mm thick,well dressed with each layer rammed and fully compacted finely dressed with earth obtaining cutting from borrow pits with initial lead of 30M and initial lift of 1.5M as per specification and direction of E/I.(6.1.16)P-120 Part-B,WRD
Provision of dewatering with 10HP diesel pump set including P.O.L.( SL.No.10 PM-29,P-83) =Rs.300.00 Add 10% C.P =Rs 330.00
Providing 1.5mm thick cement punning of good quality of cement…do..do…as per E/I.(5.7.11/3.11,Part-A,P-200)
Carriage of materials Cement - Lead 28 KM (205 KM P + 8 KM K)
Sand - Lead 18 KM (10 KM P + 8 KM K)
Stone Chips - Lead 48 KM (40 KM P + 8 KM K)
Boulder - Lead 48 KM (40 KM P + 85 KM K)
Provision of GST @ 18%
Add 1% Labour Cess
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_143745.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.20 MB
BOQ_143745.xls
BOQ • 0.29 MB
TenderDocument.pdf
Tender Documents • 0.58 MB
Download all tender documents and submit your bid