Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAdmitted-Finance | ₹3.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.3 Cr+₹11.9 L (3.72%)Admitted-Finance | ₹3.3 Cr+₹11.9 L (3.72%) | L2 | Admitted-Finance |
| 3 | L3₹3.4 Cr+₹21.7 L (6.81%)Admitted-Finance | ₹3.4 Cr+₹21.7 L (6.81%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Shaurya Shakti Enterprises L1 | shiv shankar enterprises L3 | E-VISION INFRATECH L2 |
|---|---|---|---|---|---|---|
| 1.01Part A -Supply | ||||||
| 1.02 | 24 FIBER ( DWSM ) OPGW FIBER OPTIC CABLE | 3 | K.M. | 1,45,000 ₹4,35,000 Lowest | 1,60,000 ₹4,80,000 | 1,54,000 ₹4,62,000 |
| 1.03ACCESSORIES FOR TOWER | ||||||
| 1.04 | NUMBER PLATE | 5 | Nos | 450 ₹2,250 | 400 ₹2,000 Lowest | 500 ₹2,500 |
| 1.05 | DANGER PLATE | 5 | Nos | 450 ₹2,250 | 400 ₹2,000 Lowest | 500 ₹2,500 |
| 1.06 | PHASE PLATE ( Set of three with Red, Yellow , Blue ) | 5 | Nos | 450 ₹2,250 | 400 ₹2,000 Lowest | 500 ₹2,500 |
| 1.07 | Pipe Type Earthing Materials per Tower | 10 | Nos | 3,500 ₹35,000 Lowest | 3,500 ₹35,000 Lowest | 4,500 ₹45,000 |
| 1.08HARDWARE FOR CONDUCTOR | ||||||
| 1.09 | DOUBLE SUSPENSION FITTING FOR DEER | 27 | Nos. | 3,800 ₹1,02,600 Lowest | 5,000 ₹1,35,000 | 5,000 ₹1,35,000 |
| 1.10 | DOUBLE TENSION FITTING FOR DEER | 14 | Nos. | 5,500 ₹77,000 Lowest | 7,200 ₹1,00,800 | 6,500 ₹91,000 |
Tender Value
Refer Docs
EMD Value
₹3 L
Closing Date
26 Oct 2023, 4:00 pmClosed
SE
400 KV S/S SARNATH VARANASI
WORK
2023_UPTCL_845652_1
E-TENDER No. 34 ETC-II(VNS)2023-24
Open Tender
Electrical Works
Turn-key
90 days
GHAZIPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
EE ETD GHAZIPUR
₹3 L
7 Feb 2024
4 Oct 2023
27 Oct 2023
4 Oct 2023
26 Oct 2023
4 Oct 2023
Amount
Part A -Supply
24 FIBER ( DWSM ) OPGW FIBER OPTIC CABLE
ACCESSORIES FOR TOWER
NUMBER PLATE
DANGER PLATE
PHASE PLATE ( Set of three with Red, Yellow , Blue )
Pipe Type Earthing Materials per Tower
HARDWARE FOR CONDUCTOR
DOUBLE SUSPENSION FITTING FOR DEER
DOUBLE TENSION FITTING FOR DEER
DOUBLE TENSION FITTING FOR PANTHER
SINGLE TENSION FITTING FOR PANTHER
ACCESSORIES FOR CONDUCTOR
VIBRATION DAMPER SUITABLE FOR PANTHER
VIBRATION DAMPER SUITABLE FOR SPL DEER
MID SPAN COMPRESSION JOINT FOR SPL DEER
MID SPAN COMPRESSION JOINT FOR PANTHER
REPAIR SLEEVE FOR SPL DEER
REPAIR SLEEVE FOR PANTHER
PERFORMED ARMOUR ROD FOR SPL. DEER
PERFORMED ARMOUR ROD FOR PANTHER
HARDWARE & ACCESSORIES FOR
SUPPLY & INSTALLATION HARDWARE SET FOR 24 FIBRE OPGW
JOINT BOX ( 24 FIBRE )
160 KN COMPOSITE SILICON RUBBER INSULATOR STRING FOR 220 KV TENSION FITTING OF ANCHOR TOWER.
120 KN COMPOSITE SILICON RUBBER INSULATOR STRING FOR 220 KV SUSPENSION FITTING OF RC TOWER.
120 KN COMPOSITE SILICON RUBBER INSULATOR STRING FOR 132 KV TENSION FITTING
70 KN COMPOSITE SILICON RUBBER INSULATOR STRING FOR 220 KV SUSPENSION FITTING
Part -B (Work)
Survey including preparation of schedule of materials, marking of locations (Route length),GPS Survey of line with co-ordinates of each tower(The length of line shall be authenticated by GPS Survey)
Check survey and Peg marking.
Soil Investigation (All kind of Soil)
Cost of Excavation of foundation( Normal and Pile ) pits including all earth work backfilling ramming and leveling etc.
Setting stub of 220 KV River crossing Tower including all foundation work but excluding the cost of concreting and excavation.
Setting stub including all foundation work but excluding the cost of concreting and excavation of following towers.
220 KV DC/DE
Installation of steel re-inforcement bars in RCC foundation including cost of steel re-inforcement bars cutting, bending, placing, binding etc. for DC+5 Tower.
Cost of Concreting for Normal Open Cast foundation for DC+0 including cost of cement,sand,stone aggregates dewatering vibrating forming shoring and shutring and curing but excluding cost and installation of re-inforcement steel bars.
1:2:4 concreting
Erection of Superstructure of 220 KV DC Towers and Anchor Tower and their extension including transporting tower part from 132 KV S/S Zamania store to site and all work above ground level excluding hoisting of insulator but including fitting of danger plate no. plate ,phase plate fixing and punching of the bolts.
Erection of Superstructure of 220 KV DC River Crossing Tower and their extension including transporting tower part from 132 KV S/S Zamania store to site and all work above ground level excluding hoisting of insulator but including fitting of danger plate no. plate ,phase plate fixing and punching of the bolts.
Tack welding of all the bolt upto 5 meter with application of Zinc rich Aluminium Paint.
Laying, Tensioning, Stringing, Clamping, Jointing etc of ACSR panther conductor including hoisting of insulator fitting of all accessories hardware and accessories etc of conductor all three phases.The work also includes shifting conductor from 132 KV S/S Zamania Store to working site.
Laying, Tensioning, Stringing, Clamping, Jointing etc of all six phases of ACSR Spl. Deer conductor and one OPGW Cable including hoisting of insulator fitting of all accessories hardware and accessories for conductor and OPGW Cable etc from Anchor to Anchor span using 220 KV River Crossing Tower. The work also includes shifting conductor from 132 KV S/S Zamania Store to working site.
Laying of one no. OPGW including stringing of OPGW shall be inclusive of installation of joint boxes, jointing, & splicing work and other associated work.
Grounding work including earthwork for Pipe type earthing of tower including coke and salt .
Preparation & submission of document regarding PTCC clearance & navigational clearance from IWAI and other associated work & follow up till getting the NOC from PTCC & IWAI of respective department.
Preparation & submission of document regarding electrical safety and other associated work & follow up till getting the NOC from electrical safety department. Electrical safety inspection fee will be paid to the contractor on actual basis after providing of inpection fee slip.
Part C- Dismentalling of Line
De-stringing of conductor, de-hosting of insulator, rolling of dismantle conductor and all associated work of all three conductor
dismantling of OPGW, rolling of dismantled OPGW, and all associated work,
Dismantling of RC Tower, Anchor and other towers
Transportation of dismaintled material including shifting up to loading point loading into vehicle transportation unloading and propor stacking at nearest departmental 132 KV S/S Zamania store approx. distance 30 Km.
Part- D Revetment work.
Revetment of tower foundation of Proposed 01 No. RX Tower and 02 No acnhor tower, 1 No. 220 KV DC tower or as per site requirement used in 132 KV Ghazipur -Bhadaura line as per drawing and specification duly approved from SE ETC-II Varanasi. The job includes the following works :
Excavation of earth with the help of suitable T&P and labour, watering and ramming of excavated earth.
Concrete with cement, Sand, Stone ( 40mm stone ballast) in ratio 1:2:4 in foundation and under floor including the cost of all material /labour and T&P etc. required for proper completion of work satisfactorily.
Ist class stone block masonry work for the construction of retaining wall in 1:4 ratio cement and sand including the cost of all material, labour & T&P etc. required for proper completion of job satisfactorily.
Concrete in plinth with 20mm stone ballast coarse sand and cement mortar in ratio 4:2:1 including the cost of all material, labour & T&P etc. required for proper completion of job satisfactorily.
Earth filling under floor and in area between tower foundation and retaining wall including the cost of soil to be obtained by the contractor from outside including watering, ramming and dressing of earth etc. complete including the cost of earth rayalty, taxes, freight etc and cost of all material, labour & T&P etc. required for proper completion of job satisfactorily.
Cost of pipe for weep hole as per required
Installation of steel reinforcement bar in pillar, beam & in RCC foundation of CC pad wherever required as per drawing approved by SE, ETC-II Varanasi including cost of steel, cutting beding and placing etc.
E-VISION INFRATECH
shiv shankar enterprises
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .