| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.3 LAccepted-Finance | ₹29.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹29.5 L+₹24,924 (0.85%)Rejected-Finance | ₹29.5 L+₹24,924 (0.85%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Hayagreeva Earth Movers L1 | Swathi Construction L2 |
|---|---|---|---|---|---|
| 1.00(I). Storm Water Drain | |||||
| 1.10 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift | 392 | m3 | 108 ₹42,336 Lowest | 109 ₹42,728 |
| 1.20 | Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 59 | m3 | 5,174 ₹3,05,266 Lowest | 5,226 ₹3,08,334 |
| 1.30Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification | |||||
| 1.40 | a). Drain works above 1m Height | 870 | m2 | 606 ₹5,27,220 Lowest | 612 ₹5,32,440 |
| 1.50 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 131 | m3 | 8,223 ₹10,77,213 Lowest | 8,305 ₹10,87,955 |
| 1.60 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 10,480 | Kgs | 91.5 ₹9,58,920 Lowest | 92 ₹9,64,160 |
| 1.70 | Conveyance of Excavated Excess Earth away from the site to 2km including loading and transportation charges etc., complete as per standard Specification. | 262 | m3 | 68 ₹17,816 Lowest | 69 ₹18,078 |
Tender Value
₹35 L
EMD Value
₹35,000
Closing Date
13 Feb 2025, 3:00 pmClosed
THE COMMISSIONER
Salem City Municipal Corporation, Fort Main Road, Salem.
Proposed Construction of Major Drain at ATC Nagar Cross Street From Madura Garden to ATC Nagar Main Road in Division no 5 of Hasthampatty Ward Office.
2025_MAWS_523163_1
E8-Est No 248-D-2024-2025
Open Tender
Civil Works - Water Works
Lump-sum
120 days
Salem city Municipal Corporation
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹35,000
31 Jul 2026
6 Feb 2025
13 Feb 2025
6 Feb 2025
13 Feb 2025
6 Feb 2025
Amount
(I). Storm Water Drain
Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift
Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification
Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification
a). Drain works above 1m Height
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers -
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Conveyance of Excavated Excess Earth away from the site to 2km including loading and transportation charges etc., complete as per standard Specification.
Swathi Construction (BID ID -1247871)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .