| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹80.9 LAccepted-AOC | 1 | Accepted-AOC lowest rate | |
| 2 | 2₹81.8 L+₹23,772 (0.29%)Rejected-Finance 12F ALOOKARAN HOUSE WOODCOCK ROAD ST MARYS HILL OOTY NILGIRIS DISTRICT 643 001 | THE NILGIRIS | TAMIL NADU | 643001 | 2 | Rejected-Finance l2 |
Tender Value
₹82.0 L
EMD Value
₹82,000
Closing Date
10 May 2023, 3:00 pmClosed
PROJECT DIRECTOR
DRDA THE NILGIRIS
Strengthening of Road from Km 1.0 of Neggicombai Pudhumandhu Road - Paneer Road KM 0/0-1/08
2023_RDTN_307015_1
MGSMT ktg jackanarai p 05
Open Tender
Civil Works - Roads
Item Rate
180 days
KOTAGIRI
AS PER TENDER DOCUMENT
3 documents required · 3 mandatory
₹0
₹82,000
DRDA THE NILGIRIS
11 Jul 2023
26 Apr 2023
10 May 2023
26 Apr 2023
10 May 2023
26 Apr 2023
29 Apr 2023
Amount
Strengthening of the road from KM 1/0 of Neggicombai Pudhumandhu road to Paneer Km 0/0-1/080 H/O-Jackanarai (R-170)
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying tack coat over WMM surface (not treated with primer) using 7Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5 Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Bituminous Macadam 50 MM thick. Providing and laying BITUMINOUS macadam with Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finish
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading,premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and fill.
Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads ass per IRC :35 the finished to be level, uniform and free from streaks and etc complete as per MORT and H specification no.803
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
V Shape Drain
Earth work excavation and depositing on bank within initial lead of 10mtrs and initial lift of 2mtrs. in hard stiff clay still black hard red earth shales murrams gravel stoney earth a death mixed withsmall size boulders and hard gravelly soil (SS 20 B)
Cement concrete 1:4:8 (one cement four sand and eight hard broken stone) using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc.,
Cement concrete 1:2:4 using 20mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 30cm, thick, compacting etc., complete complying with standard specification and as directed.
RETAINING WALL
Earth work excavation and depositing on bank within initial lead of 10mtrs and initial lift of 2mtrs. in hard stiff clay still black hard red earth shales murrams gravel stoney earth a death mixed withsmall size boulders and hard gravelly soil (SS 20 B)
Cement concrete 1:4:8 (one cement four sand and eight hard broken stone) using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc.,
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with Cross bracings using mild steel sheets of size 90cms x 60cm and 10 gauge stiffened welded with mild steel angles of size 25mm x 25mmx3mm for boarding laid over silver oak (Country wood) Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification and as directed for the following items.
Cement concrete 1:3:6 using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc., complete complying with standard specification and as directed.
Provision for Sign board
Provision for HM Stone
Provision for KM Stone
Provision for Name boards cum Citizen Board
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Hilltop Constructions (P) Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .