| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.1 CrAccepted-AOC 142 | ₹36.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹36.8 CrRejected-AOC | ₹36.8 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹38.6 CrRejected-AOC 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | ₹38.6 Cr | L3 | Rejected-AOC L3 |
| 4 | L4₹39.8 CrRejected-AOC | ₹39.8 Cr | L4 | Rejected-AOC L4 |
Tender Value
₹40 Cr
EMD Value
₹80 L
Closing Date
18 Jan 2019, 1:00 pmClosed
Superintending Engineer
Superintending Engineer Rapti Nahar Nirman Mandal-2, Basti
Puckka Work
2019_UPIDC_292540_2
05/S.E./2018-19
Open Tender
Civil Works
270 days
Campairgang Mahrajgang
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
Treasury Challan
₹80 L
S.E. Rapti Nahar Nirman Mandal-2 Basti
4 Mar 2022
8 Jan 2019
18 Jan 2019
9 Jan 2019
18 Jan 2019
9 Jan 2019
16 Jan 2019
Amount
Earth in excavation of foundation for all structures of campierganj branch all type of soil including lead up to 30.0 m, lift up to 3.5m, and its proper disposal and back filling as per direction given by Engineer in charge required for proper completion of work including cost of all T. & P., labour etc.
Earth work in making diversion, Ramp, Approach road etc. of campierganj branch in all type of soil including lead up to 1.0 km lift up to 1.5m with manual compaction and dressing required for proper completion of work including cost of all T.&P.,labour etc.
Earth work in removing diversion, all type of soil including lead up to 1.0 km lift up to 1.5m with manual compaction and dressing required for proper completion of work including cost of all T.&P.,labour etc.
Earth work in filling for all structure of compierganj branch including all lead, lift dressing and manual compaction.
Laying C.C-A-40 M-10 in foundation of all structures of campierganj branch with Cement (O.P.C.,43 grade) course sand of F.M. not less than 2.0 and hard stone ballest (20-40mm size) including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc.
Laying C.C- A-20, M-15 with Cement (O.P.C.,43 grade). course sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc.
Laying R.C.C- A-20 M15 with Cement (O.P.C.,43 grade). course sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc.
Laying R.C.C- A-20 M-20 with Cement (O.P.C.,43 grade). course sand of F.M. not less than 2.5 and crushed stone grit of size 4.75mm to 20mm. in campierganj branch including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc.
Laying R.C.C- A 20 M-25 with Cement (O.P.C.,43 grade). course sand of F.M. not less than 2.5 and crushed stone grit of size 4.75mm to 20mm. in campierganj branch including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc.
Centering & Shuttering for C.C / R.C.C. work in different parts of structures in campierganj branch with all lead & lift required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc. Up to 3.00m span.
Centering & Shuttering for C.C / R.C.C. work in different parts of structures in campierganj branch with all lead & lift required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc. above 3.00m span.
Cutting, Bending, Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures of campierganj branch required for proper completion of work including cost of all material,labour T.&P. etc.
Providing and laying coarse sand filler with F.M. more than 2.0 with making subgrade including watering ,compaction preparation of surface required for proper completion of work including cost of all materials, labour, T. & P. etc.
providing and laying 4.75 to 20.mm size hard stone grit in laying filter required for proper completion of work including cost of all materials, labour, T.&P.etc.
Supplying and laying rubber seal 225 mm width and 10 mm thickness at joints on sleepers required for proper complection of work including cost of all materials, labour, T.&P.etc.
Carriage and laying stone boulder(Weight 20kg to 40kg and minimum diamension of 200 mm) for canal outer slope protection in campierganj branch required for proper completion of work including cost of all material,labour and T.&P.etc.
Carriage and laying stone boulder(Weight 40kg to 60kg and minimum diamension of 200 mm) for canal outer slope protection and apron in campierganj branch required for proper completion of work including cost of all material,labour and T.&P.etc.
Laying and fixing joint filler board 18mm. Thick as specified locations in different structures of campierganj branch required for proper completion of work including cost of all material,labour and T.&P.etc.
Supplying and driving "Z" type sheet piles of required size in different structures of campierganj branch with cutting, welding & cost of material required for proper completion of work including cost of all materials, labour,T.&P.etc.
Dewatering with all cost of power/P.O.L., machine,pumps,well point system & operate etc with assembling and dismentling of equipments etc. required for completion of work.
Supply and laying tarfelt including cost of all materials, labour,T.&P.etc.
Applying and coat bitumin in two coat including cost of all materials, labour,T.&P.etc.
Supply and Filling bitumin cake including cost of all materials, labour,T.&P.etc.
Vijai Construction (India) Pvt. Ltd.
M/S AJAY KUMAR CONTRACTOR
M/S ARUN CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid