Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
26 Jul 2022, 6:00 pmClosed
GE (P) AF Gurgaon
GE (P) AF Gurgaon Near Atul Kataria Chowk Gurgaon
CA NO. GE(P)AF/GUR-43/2022-23 REPAIR AND MAINTENANCE OF 250KLPD AND 85KLPD SEWAGE TREATMENT PLANT AND AUXILARY E/M ITEMS AT AF STN GURGAON UNDER GE(P) AF GURGAON
2022_MES_533972_1
GE (P) AF/Gur-43/2022-23
Open Tender
Miscellaneous Works
Item Rate
272 days
GE (P) AF Gurgaon
All as per NIT
10 documents required · 10 mandatory
₹500
GE (P) AF Gurgaon
₹90,000
Yes
8 Sept 2022
27 Jun 2022
28 Jul 2022
27 Jun 2022
26 Jul 2022
11 Jul 2022
Amount
Supply and filling Calcium based granular disinfectant for water treatment, packing in 45 KG. PLASTIC DRUMS complete all as specified and directed by Engineer-in-Charge. Make :- Manhar Technologies/Hibride/Avon
Testing of Sewage Treated water as per relevant IS of STP , submission of detailed test report before and after treatment of water. Testing should be done from Govt approved laboratory Test report indicates the following parameters :- (a) Carrying out minimum essential testing of sewage water as per revlevant IS mandatory for chemical, odour, PH Value, TSS, BOD,COD total nitrogen, sulphate, oil and grease ammonical Nitrogen (NH3-N) and Bacteriological total collifrom organisms and other charaterstics as per relevant IS of sewage water. Note: Testing to be done in 1st week of every month.
Periodical Cleaning of Oil & Grease Strap tank, Equilization tank, CCT Tank, sludge tank & Treated water tank of 250 KLPD Plant complete all as specified and as directed by Engr-in-charge. Note :- Cleaning shall be carried out by the following methods (i) Removing all the existing water from the tank through tankers (ii) Cleaning inner surface of tank by scraping with steel wire brush and removing mud & sludge collected inside the tanks manually at a distance not exceeding 50 Mtrs. (iiI) Washing with clean water & bleaching powder mixture complete tank internally and removal of left out sludge. (iii) Labour and T&P required for removal of settled down sewage sludge/mud inside the sewage tank for scooping out from inside and below the septic/staining sewage water inside the well and lifting the same and deposited on top and near by the sewage tank where directed and further to removal the same where approved by the PCB (iv) All Safety measures to be taken by the contractor for doing the cleaning.
Periodical Cleaning of Oil & Grease Strap tank, Equilization tank, CCT Tank, sludge tank & Treated water tank of 85 KLPD Plant complete all as specified and as directed by Engr-in-charge Note :- Cleaning shall be carried out by the following methods (i) Removing all the existing water from the tank through tankers (ii) Cleaning inner surface of tank by scraping with steel wire brush and removing mud & sludge collected inside the tanks manually at a distance not exceeding 50 Mtrs. (iiI) Washing with clean water & bleaching powder mixture complete tank internally and removal of left out sludge. (iii) Labour and T&P required for removal of settled down sewage sludge/mud inside the sewage tank for scooping out from inside and below the septic/staining sewage water inside the well and lifting the same and deposited on top and near by the sewage tank where directed and further to removal the same where approved by the PCB (iv) All Safety measures to be taken by the contractor for doing the cleaning.
Supply , laying and fixing in replacement of HDPE pipe of 110mm dia of PE -63 material Black colour having 6kgf/cm2 pressure rating alongwith joint i.e. elbow,Tee,union.coupler, end cap etc with Compressor push fitting as specified and directed by Engr-in-Charge. Make: Supreme/diplast/kisan Note: Compressor joint and all other joint included in this quoted rate.
Supply , laying and fixing in replacement of HDPE pipe of 90mm dia of PE -63 material Black colour having 6kgf/cm2 pressure rating alongwith joint i.e. elbow,Tee,union.coupler, end cap etc with compressor push fitting as specified and directed by Engr-in-Charge. Make: Supreme/diplast/kisan Note: Compressor joint and all other joint included in this quoted rate.
Supply , laying and fixing in replacement of HDPE pipe of 50mm dia of PE -63 material Black colour having 6kgf/cm2 pressure rating alongwith joint i.e. elbow,Tee,union.coupler, end cap etc with compressor push fitting as specified and directed by Engr-in-Charge. Make: Supreme/diplast/kisan Note: only Compressor joint is excluded in this quoted rate.
Excavation in trenches not exceeding 1.5M wide and not exceeding 1.5M in depth for foundation etc or for shafts, wells, cesspits, manholes, pier holes etc not exc 10 Sqm on plan and not exc 1.5M in depth and getting only out in hard soil/standing complete all as specified and directed
Returning, filling in trenches including spreadin, levelling watering and well ramming in layers not exceeding 25 cms thick in each layer of oil complete all as specified and directed
Removing surplus excavated material to a distance exc 50 Mtr and deposting where directed at l level not exceeding 1.5 Mtr above the starting point all as specified and directed by Engr - in Charge
S&F Compressor push Coupler joint of Dia 110mm HDPE pipe all as specified and directed by Engr - in Charge Make: Supreme/diplast/kisan
S&F Compressor push Coupler joint of Dia 90mm HDPE pipe all as specified and directed by Engr - in Charge Make: Supreme/diplast/kisan
S&F Compressor push Coupler joint of Dia 50mm HDPE pipe all as specified and directed by Engr - in Charge. Make: Supreme/diplast/kisan
M&L for filling of tube media including removing the water and cleaning Tube Settler Tank complete all as specified and directed by Engr-in-Charge.
M&L for filling of Fab MBBR media including removing the water and cleaning complet from the MBBR tank 1 & 2 complete all as specified and directed by Engr-in-Charge. Note: Water to be removed through filling of water tankers and thereafter cleaning to be done all this rate is included in quoted rate.
Supplying , installing , testing and commissioning in replacement of Chlorine dosing pump of high pressure single head gear motored adjustable dosing pump model 96 NGQ 51 of declibec of potter and watt with accessories including lead, connecting nuts, injection check valve, clay weight, ferrule, dosing system Model Ads-1 of declibec or equivalent of potter and watt consisting of 100 Ltrs PE/FRP tank with PE/FRP lid, level gauge, single phase electric motor and agitator with shaft and blade mounted on tank, lid must have port hole pouring granular chlorination chemical and water when necessary. Lid must have provision for mounting dosing pump on the lid/wall including inlet and out let connection with 15mm dia heavy graded PVC pipe and connected fitting with 15mm dia gate valve complete all as specified and directed by Engineer-in-Charge. Make: Toshcon Jesco /Manhar/Declibec
M&L for filling of Sand media including removing the water and cleaning complete from Sand Filter complete all as specified and directed by Engr-in-Charge.
M&L for filling of Carbon media including removing the water and cleaning complete from Carbon Filter complete all as specified and directed by Engr-in-Charge.
M&L for filling of Bio Culture with adequate quantity of DAP, Urea, Wheat Flour, corn flour & Jaggery in MBBR Tank 1 & 2 all as specified and directed by Engr-in-Charge.
M&L for fixing of butterfly valve 2" in Sludge drain tank along with its fixture and fitting complete all as specified and directed by Engr-in-charge.
M&L for pressure gauge (4") 7Kg alongwith its fitting and fixture all as specified and directed by Engr-in-Charge.
M&L FBD diffuser in MBBR Tank complete all as specified and directed by Engr-in-Charge.
M&L in replacement of GI Pipe 50mm dia alongwith Tee & Elbow complete all as specified and directed by Engr-in-charge
M& L in replacement of standpost to water sprinkler plastic 15-18mtr range, Type Pop Up 25 mm dia all as specified and directed by Engr-in-charge
S&F in replacement of Air Release Valve of 50mm Dia alongwith Saddle and UPVC pipe all as specified and directed by Engr-in-charge
S&F GI Butterfly valve 4" size alongwith all its fixtures and fittings all as specified and directed by Engr-in-charge
S&F GI Butterfly valve 3" size alongwith all its fixtures and fittings all as specified and directed by Engr-in-charge
M& L for Repair & testing of parts of starter panels complete all as specified and as directed by Engr-in-charge. (Note;- The rate also includes change of Wiring of any size in the panel. Parts required are seperately measured in the schedule)
S&F in replacement Voltage monitor relay (3 phase ) AC : 110/ 415Volt Setting 75 -100/300 - 400 V, complete all as specified and directed by Engineer-in-Charge.
Supply and fix in replacement Over current relay definite time Non directional ,definite time & current adjustable setting 0.5 -5A 1-10A /0.1-1A time 0-10 sec, complete all as specified and directed by Engineer-in-Charge.
Supply & Fixing only Electronic Phase sequencing relay all as specified and as directed by Engr-in-Charge . Make:Universal or equivalent out of make mentioned list of make.
S & F in replacement of Contractor MNX 25, 240V 50/60Hz upto 500V,50/80Hz 3 Pole all as specified and as directed by Engr-in-Charge.
S & F in replacement of Contractor MNX 18, 240V 50/60Hz upto 500V,50/80Hz 3 Pole all as specified and as directed by Engr-in-Charge.
S & F in replacement of Contractor MNX A2, 240V 50/60Hz upto 500V,50/80Hz 3 Pole all as specified and as directed by Engr-in-Charge .
S & F in replacement of Contractor MNX 9, 240V 50/60Hz upto 500V,50/80Hz 3 Pole all as specified and as directed by Engr-in-Charge .
S& F in replacement of MCB 63Amp 4Pole,415V ,16KA as specified and directed by Engr-in-charge.
S& F in replacement of MCCB 100Amp 4Pole,415V ,16KA as specified and directed by Engr-in-charge
M&L complete for drilling hole under hard standing /road in different location as per site requirement (between 03 mtr to 12mtr maximum) for laying of HDPE pipe by means of bookle and without disturbing the top surface and making good the disturbed surface if any complete all as specified.
M&L for cutting and taking out unserviceable copper wire windings from the rotor grooves of the 10 HP submersible motor, cleaning the grooves/ rotor with chemical reagent, re – winding the same with super enamelled PVC insulated copper wire of suitable gauge (Approx Kgs - 7.5) including teflon tape insulating paper jointing material etc complete all as specified and directed by Engineer-in-Charge. Note : Rate included taking out & refixing of pump & motor from the sump.
M&L for cutting and taking out unserviceable copper wire windings from the rotor grooves of the 15 HP submersible motor, cleaning the grooves/ rotor with chemical reagent, re – winding the same with super enamelled PVC insulated copper wire of suitable gauge (Approx Kgs - 9.5) including teflon tape insulating paper jointing material etc complete all as specified and directed by Engineer-in-Charge. Note : Rate included taking out & refixing of pump & motor from the sump.
M&L for overhauling of submersible pumps of any type/make, rotor turning and grinding including dismantling and re-assambling of pump and replacing the unserviceable items of the pumps after checking the serviceability of the pumps of 10 HP capacities.(Note:- New part which are rquired for replacement of new part shall be measured as "supply only " and paid under following items)
Housing bushes PVC
Seal bush PVC
Segment and thrust bearing
Oil seal & cable seal
Impeller U22 -212 series
Guide bushes
Distance sleeve
Neck ring PVC
Top dol bushes & sleeves set
Coupling with sand guard
All as item No. 34.00 here-in-before but pump set of capacity 15 HP
Housing bushes PVC
Seal bush PVC
Segment and thrust bearing
Oil seal & cable seal
Impeller U22 -212 series
Guide bushes
Distance sleeve
Neck ring PVC
Top dol bushes & sleeves set
Coupling with sand guard
Note:- (a) The amount of Rs 44,930/- against Schedule of Credit on Page No 109 shall be deducted from the total amount quoted against Sch 'A' while deriving the Contract Sum for Acceptance.
NAVYUG VYAPARI
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .