| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.1 LAccepted-AOC | 1 | Accepted-AOC Tender Coated As per Estimated Amount | |
| 2 | 2₹15.1 L+₹96,968.48 (6.88%)Rejected-Finance | 2 | Rejected-Finance Tender Coated Above Estimated Amount |
| Sl No | Description | Qty | Unit | MRP Infratech Private Limited L2 | K.JAGANATHAN L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B | 68.69 | CUM | 275 ₹18,889.75 | 262 ₹17,996.78 Lowest |
| 2.00 | Supplying and filling in foundation and basement with Filling M Sand in layers not more 15 cm thick etc. complete. | 6.83 | CUM | 1,822 ₹12,444.26 | 1,735 ₹11,850.05 Lowest |
| 3.00 | Cement concrete 1:4:8 for foundation using 40mm HBG metal etc. complete. | 10.25 | CUM | 5,712 ₹58,548 | 5,440 ₹55,760 Lowest |
| 4.00 | Rein forced Cement concrete 1:11/2:3 mix using 20mm HBG metal for foundation and basement etc. complete. | 32.91 | CUM | 9,791 ₹3,22,221.81 | 9,325 ₹3,06,885.75 Lowest |
| 5.00 | Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors etc. complete. Upto GL | 56.61 | SQM | 572 ₹32,380.92 | 545 ₹30,852.45 Lowest |
| 6.00 | Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors etc. complete. Above GL | 112.93 | SQM | 1,285 ₹1,45,115.05 | 1,033 ₹1,16,656.69 Lowest |
| 7.00 | Supplying and fabrication of steel including cost and conveyance and cutting, bending, tying and placing in position | 2.13 | MT | 96,451 ₹2,05,440.63 | 91,858 ₹1,95,657.54 Lowest |
| 8.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 10cum | 36.77 | CUM | 6,447 ₹2,37,056.19 | 6,140 ₹2,25,767.8 Lowest |
| 9.00 | Plastering with C.M 1:5mix 12mm thich including cost and conveyance and all labour charges etc., complete. | 426.19 | SQM | 298 ₹1,27,004.62 | 284 ₹1,21,037.96 Lowest |
| 10.00 | Colour washing Two coat with Plastic Emulsion Paint using best quality and approved varity of colour pigments including cost of all materials brushes and scaffolding charges etc. complete.as per std specifications | 426.19 | SQM | 274 ₹1,16,776.06 | 261 ₹1,11,235.59 Lowest |
Tender Value
₹14.9 L
EMD Value
₹15,000
Closing Date
28 Oct 2025, 3:00 pmClosed
The Block Developement Office (BP)
St Thomas Mount Panchayat union
CONSTRUCTION OF COMPOUND WALL TO NOOKAMPALAYAM BURIAL GROUND IN PERUMBAKKAM PANCHAYAT AT ST THOMAS MOUNT PANCHAYAT UNOIN. SCHEME OF VPGF 2025 - 2026 ESTIMATE AMOUNT RS.14.86 LAKHS
2025_RDTN_615359_1
0855/2023/B1, dt. .10.2025,
Open Tender
Civil Works - Roads
Item Rate
120 days
PERUMBAKKAM
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹15,000
Yes
28 Nov 2025
17 Oct 2025
28 Oct 2025
17 Oct 2025
28 Oct 2025
17 Oct 2025
Amount
Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B
Supplying and filling in foundation and basement with Filling M Sand in layers not more 15 cm thick etc. complete.
Cement concrete 1:4:8 for foundation using 40mm HBG metal etc. complete.
Rein forced Cement concrete 1:11/2:3 mix using 20mm HBG metal for foundation and basement etc. complete.
Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors etc. complete. Upto GL
Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors etc. complete. Above GL
Supplying and fabrication of steel including cost and conveyance and cutting, bending, tying and placing in position
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 10cum
Plastering with C.M 1:5mix 12mm thich including cost and conveyance and all labour charges etc., complete.
Colour washing Two coat with Plastic Emulsion Paint using best quality and approved varity of colour pigments including cost of all materials brushes and scaffolding charges etc. complete.as per std specifications
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}18%
MRP Infratech Private Limited (BID ID -1496860)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_735206.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_735206.xls
BOQ • 0.34 MB
TENDER.pdf
Tender Documents • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .