Loading…
Loading…
Tender ID
Tender Value
Refer Docs
EMD Value
₹92.2 Cr
Closing Date
27 May 2026, 11:00 amClosed
No
No
Two Packet System
Normal Tender
Yes
11/04/2026 11:00
Lowest to Highest
180 days
Expenditure
Capital (WMS)
13 conditions · 2 needing a document upload
The Bidder shall have a minimum Annual Turn Over of Rs. 200,00,00,000/- (two hundred crore) in any 2 (two) years out of the last 5 (five) financial years preceding the bid opening date
Technical Capacity is as per Clause 2.2.2 of Tender Document volume-1: RPF
10 conditions · 4 needing a document upload
Goods & Services Tax (GST) registration certificate copy shall be attached
PAN details shall be attached.
The PSU has an option to take payment from Railways through a letter of credit (LC) arrangement as per Railway Board Letter No: 2018/CE-I/CT/9, New Delhi, dated:04.06.2018.
Please submit your bank details i.e. Name of Bank along with Bank Branch Code, Accounts Number as appearing in the cheque book, IFSC Code and PAN Number, duly certified by the authorized official of the bank, to facilitate payment through ECS/NEFT/RTGS. In lieu of the bank certificate photo copy/scanned copy of a cancelled cheque may be attached for verification of the above particulars.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The participating PSUs shall quote single rate for each schedule as percentage "above or below or At par" the maintenance Fee as specified in the RFP
GST will be paid as per GST Law, GST/SGST/UTGST/IGST asamended by Central/State Governments from time to time. GST will be paid as per actual and input credit for GST to be passed on to Indian Railways.
Operation & Maintenance of Dabhoi Workshop (ELW/DB) and Maintenance of 3 phase Locomotive (POH of WAP7 and WAG9, IOH of Motorized Bogie of CO-CO type, IOH of Traction Motor of 6FRA 6068 type) for a period of 18 years
ELWDB2526LOCOPOH06
ELWDB2526LOCOPOH06
Limited
Works - General
216 Months
Unknown (Unspecified Location)
₹0
₹92.2 Cr
27 May 2026
19 Mar 2026
13 May 2026
11 Apr 2026
352 items across 10 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 5,69,68,85,319.23 | ||
| — | 3.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 1st year | — | — | — | 6,20,79,156.75 | |
| — | 5.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 2nd year | — | — | — | 10,63,36,447.55 | |
| — | 12.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 3rd year | — | — | — | 26,20,98,321.12 | |
| — | 12.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 4th year | — | — | — | 26,89,89,168.12 | |
| — | 12.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 5th year | — | — | — | 27,58,80,015.24 | |
| — | 12.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 6th year | — | — | — | 28,27,70,862.24 | |
| — | 12.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 7th year | — | — | — | 28,96,61,709.24 | |
| — | 13.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 8th year | — | — | — | 32,12,65,269.39 | |
| — | 13.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 9th year | — | — | — | 32,87,30,353.64 | |
| — | 13.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 10th year | — | — | — | 33,61,95,437.89 | |
| — | 13.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 11th year | — | — | — | 34,36,60,522.27 | |
| — | 13.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 12th year | — | — | — | 35,11,25,606.52 | |
| — | 14.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 13th year | — | — | — | 38,61,74,590.06 | |
| — | 14.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 14th year | — | — | — | 39,42,13,911.56 | |
| — | 14.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 15th year | — | — | — | 40,22,53,233.2 | |
| — | 14.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 16th year | — | — | — | 41,02,92,554.7 | |
| — | 14.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 17th year | — | — | — | 41,83,31,876.34 | |
| — | 15.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 for 18th year | — | — | — | 45,68,26,283.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
UniformityinPOHactivitiesCostingandMustChangeItems.pdf
ATTACHMENT
RevisedCodallife060620221.pdf
ATTACHMENT
OEMManualWAG9Vol1.pdf
ATTACHMENT
OEMManualWAG9Vol2.pdf
ATTACHMENT
OEMManualWAG9Vol3.pdf
ATTACHMENT
RailwayBoardLetter.pdf
ATTACHMENT
RlyBdletterdt23-06-25PolicyonassignmentofworkstoRailwayPsUsaftercompetitive.pdf
ATTACHMENT
TENDERDocument.pdf
ATTACHMENT
TenderDocument-Voulme1-RFP.pdf
ATTACHMENT
TenderDocument-Volume-2-Agreement.pdf
ATTACHMENT
TenderDocument-Vol-3ScopeofworkSpecialconditionoftender.pdf
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_11111.pdf
ATTACHMENT
GCCWorks2022uptoACS10_1.pdf
ATTACHMENT
RBLETTERFORLC_04.06.2018.pdf
ATTACHMENT
CorrigendumTDVolume-1RFP_2.pdf
CORRIGENDUM
MinutesofPreBidMeeting.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .