Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-AOC 99 MODEL TOWN PATHANKOT 145001 | PATHANKOT | PATHANKOT | PUNJAB | 145001 | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹23.0 L+₹1.8 L (8.29%)Rejected-Finance | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹23.8 L+₹2.6 L (12.2%)Rejected-Finance I 910 JAHANGIR PURI NEAR BY ANAND MAYA HOSPITAL NORTH WEST DELHI DELHI 110033 UDYAM DL 06 0040830 | NORTH DELHI | DELHI | 110033 | L3 | Rejected-Finance Not Lowest | |
| 4 | L4₹25.6 L+₹4.4 L (20.5%)Rejected-Finance | L4 | Rejected-Finance Not Lowest | |
| 5 | L5₹35.6 L+₹14.4 L (67.8%)Rejected-Finance | L5 | Rejected-Finance Not Lowest |
Tender Value
₹44.5 L
EMD Value
₹89,000
Closing Date
14 Dec 2020, 6:00 pmClosed
GE (SOUTH) PATHANKOT
GE (SOUTH) PATHANKOT
21OUTSOURCING FOR MAINT AND OPERATION OF HT 11 KV MRS AT KANDRORI AND NANGALBHUR AND PUMPSETS STANDBY DG SETS AND CHLORONOME PLANTS AT PUMP HOUSE NO1DAMTAL UNDER GE S PTK
2020_MES_374061_2
GES/PKT/T-39/2020-21
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
GE (SOUTH) PATHANKOT
All contractors enlisted with MES in Class D and above and category d v
8 documents required · 8 mandatory
₹500
GE (SOUTH) PATHANKOT
₹89,000
Yes
19 Jan 2021
27 Nov 2020
16 Dec 2020
27 Nov 2020
14 Dec 2020
5 Dec 2020
Amount
Outsourcing for maint and operation of water supply installations Tube well No: 1 (Pump House No.1) located at Damtal (9CZW) round the clock having installed Vertical Turbine/Submersible pumpsets of suitable capacity discharge and head ,Chloronome plants/ bleaching dozer and stand by generating set ( will run when electric breakdown occurs) round the clock with deployment of one skilled pump operator each shift of 08 hours ( total three shifts per day) including daily, periodically maintenance like oiling greasing etc including operation of LT control Panels, sluice valves of pumping mains and distributions/interlinking valves for ensuring water supply upto Bldg service tanks including daily periodically maintenance like, replacement of defective glands, cleaning of panels and cleaning of installations inside and outside of the installation including vegetation clearance surrounding installation area upto 10 m from pump house are, maintaining/updating of log sheets and other documents and submit to office of AGE E/M Pathankot, complete all as specified and directed by Engr in charge. NOTE:Quoted rates shall be inclusive of basic wages for skilled operator, contribution towards Employment State Insurance Corporation (ESIC), Employer's contribution towards EPF, bonus, Overhead charges & profit, LWC, GST & others taxes levied all as per existing rules.
(a) The rate quoted shall inclusive of all taxes, cess, levies, including GST as applicable & existing rules.(b) Contractor is required to quote upto two digits after decimal place in accordance with IS:02 of 1960 (Revised 2016) of BIS,(c) The Contractor shall submit proof of payment of i.e Basic wages, ESIC, EPF, Bonus, with submission of valid & authentic document in support of proof of payment, before claiming payments from Department.
(i)Total Skilled Pump Operators required to operate the equipments/installations = 03 Nos .(ii) One Pump Operators (skilled) required in each shift duty of 8 hrs round the clock i.e (Total 03 shifts in a day). (iv) The rate quoted includes Oustourcing for operation & maintenance of installation on all days including Sunday/Gazetted Holidays. (v) The cost of maintenance of documents installations charts and daily records as clarified under relevent particulars,specification shall deemed to be included in the rates quoted for above items. (vi) The quoted rate deemed to be inclusive for provision of reliever duty and leave periods.(Vii) The operator on duty should have proper uniform in light blue colour shirt and dark blue trauser duly printed name as MES and contractor with all protective arrangement during the duties like shoes/hand gloves and required tools for operation and maintenance of installation.
(viii) The rate quoted deemed to be inclusive of rectifying minor defects such as arresting of pipeline leakages temporarily, Greasing of pumps/valves, Gland packing, fuse wire, minor repairs to starters such as replacement of pitted contacts/coils etc whenever required. (ix) Keeping neat and clean of complete installation area by grass cutting and removing the debris. (x) Keeping daily record of pumpsets/ DG running Hrs in all as specified and directed by Engr-in-Charge.(xi) Carrying out A check of DG set (checking of engine oil, battery electrolyte and radiator water level) daily as per Manufacturer's manual. (xii) Replacing of distilled water/battery electrolyte and charging of batteries as when required and rectifying minor defects such as Engine Air lock, tightening of loose bolts and nuts etc, which may develop during operation and relative parameters all as specified and directed by the Engineer-in-Charge.
(xiii) The Contractor shall provide Residual chlorine test kit and Orthodoline solution at each water supply installation for checking/maintaining the Residual Chlorine register and quoted rate is deemed to inclusive for the same.(xiv) The installation will be handed over in operating state on the commencement of contract though work order.(xv) The operator shall ensure by trial run and be alert to run the DG Set within 5 minutes of supply failure.(xvi) Diesel Oil required for running the DG sets will be made available at Site by the Department for running the DG set.However, the record of consumption of oil shall be maintained by Contractor at each installation.Contractor shall have to intimate minimum 02 days in advance for requirement of diesel for DG sets.
(xvii) Antecedents of the Personnel engaged by the contractor to carry out the work shall be verified from police authorities and accordingly security passes shall be issued. (xviii) The contractor shall be solely responsible for all personnel deployed for carrying out the above jobs and all transport required for conveyance. The rate quoted deemed to be inclusive of EPF, insurance etc of operator/electrician all as per latest norms of labour Commissioner. (xix). The labourers shall be provided with protective devices and shall wear them while working. In case any accident/ injury/ fatal or partial disability happened, the contractor shall be solely responsible for settling all claims/ compensation. Department will have a right to recover any sum indicated/ claimed by Labour Commissioner/ Court directive. (Xx) Contractor will render a certificate/ confirmation every month that minimum wages act is not violated and every employee engaged have been paid their wages only through individual bank account laborers in full and receipts there on obtained. The Contractor shall produce bank statements every month alongwith the Certificate.
(xxi) In case the contractor fails to set right break down (occurring during maintenance) or absence of operator within 02 hours, the Accepting Officer and the Engineer-in-Charge (GE and AGE E/M) shall impose penalty of Rs 500/- per hour per operator for inconvenience caused after said 02 hours period. If such penalties occurred more than twice in a month contract will be terminated, the balance portion of the year shall be got executed by other agency at the risk and cost of the contractor
(xxii) Material required for chlorination will be measured and paid separately.
Supply only (Calcium based granular disinfectant for water treatment, more stable than Chlorine Gas, and stronger than bleachingpowder, and sodium Hypochlorite) packing in 45 kg drum with chlorine content not less than 65 % for maintining residual chlorine between 1 to 2 PPM at supply end and less than 0.5 PPM at user end all as directed and specified by Engr-in-Charge. Note: The Contractor shall submit the test certificate from OEM before claiming for payment.
Outsourcing for maint and operation of main receiving HT sub station located at Kandrori Complex round the clock, having installed VCB panels of suitable capacity 01 No incoming (HPSEB) & 02 Nos outgoing, HT structures, LT distribution panels, Distribution transformer, etc complete with deployment One electrician (skilled) and one mate electrician (semiskilled) for each shift of 08 hours and for complete three shifts per day) including daily periodically maintenance of HT/LT distribution system including minor repairs such as replacing of fuse of HT & LT, tighting/replacing of thimbles,lugs, nuts , jumpers & cleaning of panels and surrounding area. Maintaining/updating of log sheets and other documents and submit to office of AGE E/M Pathankot, to recording of continuous supply of electricity in Army area/Users including cleaning of installations inside and outside of the installation complete all as specified and directed NOTE:Quoted rates shall be inclusive of basic wages for skilled and semi skilled electrician, contribution towards Employment State Insurance Corporation (ESIC), Employer's contribution towards EPF, bonus, Overhead charges & profit, LWC, GST & others taxes levied all as per existing rules.
Outsourcing for maint and operation of main receiving HT sub station located at Nangalbhur Complex round the clock, having installed VCB panels of suitable capacity 01 No incoming (PSPCL) & 02 Nos outgoing, HT structures, LT distribution panels, Distribution transformer, etc complete with deployment One electrician (skilled) and one mate electrician (semiskilled) for each shift of 08 hours and for complete three shifts per day) including daily periodically maintenance of HT/LT distribution system including minor repairs such as replacing of fuse of HT & LT, tighting/replacing of thimbles,lugs, nuts , jumpers & cleaning of panels and surrounding area. Maintaining/updating of log sheets and other documents and submit to office of AGE E/M Pathankot, to recording of continuous supply of electricity in Army area/Users including cleaning of installations inside and outside of the installation complete all as specified and directed .NOTE:Quoted rates shall be inclusive of basic wages for skilled and semi skilled electrician, contribution towards Employment State Insurance Corporation (ESIC), Employer's contribution towards EPF, bonus, Overhead charges & profit, LWC, GST & others taxes levied all as per existing rules.
Note for items No .10 & 11 (a) The rate quoted shall inclusive of all taxes, cess, levies, including GST as applicable & existing rules. (b) Contractor is required to quote upto two digits after decimal place in accordance with IS:02 of 1960 (Revised 2016) of BIS. (d) The Contractor shall submit proof of payment of i.e Basic wages, ESIC, EPF, Bonus with submission of valid & authentic document in support of proof of payment, before claiming payments from Department.
(i)Total Electrician both Skilled & semi skilled required to operate the equipments/installations = 06 + 06=12 Nos .(ii) One electrician (skilled) and one mate electrician (semiskilled) requred in each shift duty of 8 hrs round the clock i.e (Total 03 shifts in a day). (iv) The rate quoted includes Oustourcing for operation & maintenance of installation on all days including Sunday/Gazetted Holidays. (v) The cost of maintenance of documents installations charts and daily records as clarified under relevent particulars,specification shall deemed to be included in the rates quoted for above items. (vi) The quoted rate deemed to be inclusive for provision of reliever duty and leave periods.(Vii) The operator on duty should have proper uniform in light blue colour shirt and dark blue trauser duly printed name as MES and contractor with all protective arrangement during the duties like shoes/hand gloves and required tools for operation and maintenance of installation.
(viii) The HT 11 KV supply from State discom sub stations to MRS to be monitored by the operator. The HT OH line from State discom sub stations to MRS Nangalbhur Complex and MRS kandrori complex to be patrolled once in a month for preventive breakdowns.Additional manpower required for the same is deemed to be included in the quoted rate. Necessary transportation should be provided by the contractor and the rate quoted is deemed to be included in per shift rate.(ix) Rated quoted deemed to be inclusive for additional man power required for early restoration of supply in case of emergency.The rate quoted deemed to be inclusive of rectifying minor defects such as (a) replacement of HT fuse wire, lugs, ACSR jumpers etc whenever required.(b) Keeping neat and clean of complete installation area by grass cutting and removing the debris. (c) Keeping daily record of HT sub-stn and relative parameters all as specified and directed by the Engineer-in-Charge. (x) The contractor has to work in conjuction with other agencies working at Nangalbhur Complex area and Kandrori area to resolve the break downs without creating inconvenience to users.
(xi) The capacitors banks shall be operated for maintaining power factor not less than 0.95 at incomer. The cost of replacement of defective LT capacitors/contactors will be measured and paid separately. Any charges leived by State Discom for non maintaining power factor shall be recovered without any claim.The Contractor shall provide HT telescopic discharge rod - 1 set and 11 KV hand gloves - 2 pairs and box spanner set- 1nos at each installation. (h) The installation will be handed over in operating state on the commencement of contract though work order.
(xii) Antecedents of the Personnel engaged by the contractor to carry out the work shall be verified from police authorities and accordingly security passes shall be issued. (xiii) The contractor shall be solely responsible for all personnel deployed for carrying out the above jobs and all transport required for conveyance. The rate quoted deemed to be inclusive of EPF, insurance etc of operator/electrician all as per latest norms of labour Commissioner. (xiv). The labourers shall be provided with protective devices and shall wear them while working. In case any accident/ injury/ fatal or partial disability happened, the contractor shall be solely responsible for settling all claims/ compensation. Department will have a right to recover any sum indicated/ claimed by Labour Commissioner/ Court directive. (XV) Contractor will render a certificate/ confirmation every month that minimum wages act is not violated and every employee engaged have been paid their wages only through individual bank account laborers in full and receipts there on obtained. The Contractor shall produce bank statements every month alongwith the Certificate.
(xvi) In case the contractor fails to set right break down (occurring during maintenance) or absence of operator within 02 hours, the Accepting Officer and the Engineer-in-Charge (GE and AGE E/M) shall impose penalty of Rs 500/- per hour per operator for inconvenience caused after said 02 hours period. If such penalties occurred more than twice in a month contract will be terminated, the balance portion of the year shall be got executed by other agency at the risk and cost of the contractor
Supply only Capacitor duty contactor with 1 No Aux contact 230V AC coil voltage suitable for minimum 10 KVAR capacitor. Make: ABB/Schneider/L&T /Havells/EPCOS or equivalent approved make of HQ CE WC
Supply only Capacitor duty contactor with 1 No Aux contact 230V AC coil voltage suitable for minimum 25 KVAR capacitor. Make: ABB/Schneider/L&T /Havells/EPCOS or equivalent approved make of HQ CE WC
Supply only Double metalised paper and polypropylene technology ( Mixed Dielectric) capacitor cylindrical/box type for power factor correction of 440 V, 50 HZ rated of capacity 3 to 15 KVAR. Make: L&T/Neptune-Ducati / Schneider/Havells/EPCOS or equivalent approved make of HQ CE WC
Supply only Double metalised paper and polypropylene technology ( Mixed Dielectric) capacitor cylindrical/box type for power factor correction of 440 V, 50 HZ rated of capacity 20 to 25 KVAR. Make: L&T/Neptune-Ducati / Schneider/Havells/EPCOS or equivalent approved make of HQ CE WC
Supply and topping up of new transformer oil with di-electric strength not less than 60 KV at 2.5 mm gap in to the conservator tank/ body tank of the transformer by opening the cover & refixing, confirming to IS-335 of 1992 including heating of oil if required at various locations complete all as specified and directed by the Engineer-in-Charge. [Make: Poweroil/ Transol/ Sabitha Chemicals or equivalent approved make of HQ CE WC]
Supply and fixing in repair of housing / bushing assy suitable for VD4 VCB of make ABB
Sch of Credit = 1425.00
Note: In case the tenderer quotes different rates for similar item then lowest rate shall only be applicable for payment and contractor shall not have any claim on this account.
TRIVENI CONSTRUCTIONS
SATISH AND CO
M/S Ajay Kumar Mahajan
M/s gurdial singh and co
M/S Trilok chand sharma
M/S MS ENTERPRISES
M/S SHRI RAM BUILDERS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .