| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.1 L+₹30,751.52 (2.62%)Rejected-Finance SALBAGAN ROAD BENACHITY DURGAPUR BARDHAMAN BARDHAMAN 713213 WEST BENGAL INDIA | DURGAPUR | BARDHAMAN | WEST BENGAL | 713213 | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | GT ENTERPRISE L1 | UNITED ENGINEERING ENTERPRISE L2 |
|---|---|---|---|---|---|
| 1.00Boiler repairing of VCT Boiler No: WBL-9168 of Pit No 5 & 6 at Madhaipur Colliery Pandaveswar area. . (Inclusive of EPF/CMPF) | |||||
| 1.01 | Old damaged shell extension plate angle gas cutting and out dressing grinding consumable(Material cost) | 1 | Nos | 3,000 ₹3,000 Lowest | 3,077 ₹3,077 |
| 1.02 | Old damaged shell extension plate angle gas cutting and out dressing grinding consumable (labour Cost) | 1.5 | Semiskilled Manshift | 1,239.22 ₹1,858.83 Lowest | 1,271 ₹1,906.5 |
| 1.03 | Shell extension plate materials few late angle + 10% allowance = 330 kg (Size 6' dia & 1' height) thick 12 mm | 330 | Kgs | 100 ₹33,000 Lowest | 103 ₹33,990 |
| 1.04 | New Shell extension plate & angle rolling, bending, fabrication & same position fitting welding, grinding, dressing smoothly consumable(Material Cost) | 1 | Nos | 2,000 ₹2,000 Lowest | 2,051 ₹2,051 |
| 1.05 | New Shell extension plate & angle rolling, bending, fabrication & same position fitting welding, grinding, dressing smoothly consumable(Labour Cost) | 1.5 | Skilled Manshift | 1,284 ₹1,926 Lowest | 1,317 ₹1,975.5 |
| 1.06 | New Shell extension plate & angle rolling, bending, fabrication & same position fitting welding, grinding, dressing smoothly consumable(Labour Cost) | 3 | Unskilled Manshift | 1,193.13 ₹3,579.39 Lowest | 1,224 ₹3,672 |
| 1.07 | Damaged fusible plug opening , boring and threading labour charges | 1.5 | Semiskilled Manshift | 1,239.22 ₹1,858.83 Lowest | 1,271 ₹1,906.5 |
| 1.08 | New fusible plug fitting in same position with material IBR T.C.(material cost) | 1 | Nos | 6,000 ₹6,000 Lowest | 6,154 ₹6,154 |
| 1.09 | New Mud plug covered making machining drilling with materials Consumable | 1 | Nos | 15,500 ₹15,500 Lowest | 15,897 ₹15,897 |
Tender Value
₹11.8 L
EMD Value
₹14,700
Closing Date
20 Sept 2025, 5:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Repairing of vertical Boilers No.- WBL-10511, WBL-10511, WBL- 9168 and WBL- 6812 at pit nos. 9,1,5 and 6 Madhaipur Colliery under Pandaveswar Area
2025_ECL_343367_1
GM-PND/EandM/25-26/129/657 dated 01/09/2025
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Madhaipur Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹14,700
28 Nov 2025
6 Sept 2025
22 Sept 2025
6 Sept 2025
20 Sept 2025
6 Sept 2025
6 Sept 2025 - 9 Sept 2025
Amount
Boiler repairing of VCT Boiler No: WBL-9168 of Pit No 5 & 6 at Madhaipur Colliery Pandaveswar area. . (Inclusive of EPF/CMPF)
Old damaged shell extension plate angle gas cutting and out dressing grinding consumable(Material cost)
Old damaged shell extension plate angle gas cutting and out dressing grinding consumable (labour Cost)
Shell extension plate materials few late angle + 10% allowance = 330 kg (Size 6' dia & 1' height) thick 12 mm
New Shell extension plate & angle rolling, bending, fabrication & same position fitting welding, grinding, dressing smoothly consumable(Material Cost)
New Shell extension plate & angle rolling, bending, fabrication & same position fitting welding, grinding, dressing smoothly consumable(Labour Cost)
New Shell extension plate & angle rolling, bending, fabrication & same position fitting welding, grinding, dressing smoothly consumable(Labour Cost)
Damaged fusible plug opening , boring and threading labour charges
New fusible plug fitting in same position with material IBR T.C.(material cost)
New Mud plug covered making machining drilling with materials Consumable
New Mud plug covered making machining drilling labour Charges
New Mud plug covered making machining drilling Labour Charges
Old damaged wall stays gas cutting and out with consumable
Old damaged wall stays gas cutting and out with consumable(Labour Charges)
Old damaged wall stays gas cutting and out with consumable(Labour Charges)
Gas cutting position hole BQ welding buildup grinding, dressing, smoothly & hole removing(Material Cost)
Gas cutting position hole BQ welding buildup grinding, dressing, smoothly & hole removing(Labour Charges)
New wall stay making, machining, threading round bar 32mmx225mm with BQ material
New wall stay same positioning, fitting, cocking consumable
New wall stay same positioning, fitting, cocking consumable(labour Charges)
Hydraulic test arrangement by Boiler Inspector Director(material cost)
Hydraulic test arrangement by Boiler Inspector Director(Labour Cost)
Boiler fitting purpose materials type joint, cotton tape, steam joint, hole tight, nut bolt, rubber joint, fiber bush, rubber cone gauge glass etc.
Boiler fire bar & ring fabricated assembly fitting with consumable
Boiler fire bar & ring fabricated assembly fitting with consumable(Labour Charges)
Boiler fire bar & ring fabricated assembly fitting with consumable(Labour Charges)
Boiler fitting and commissioning steaming & running condition(Labour Charges)
Profit @10% (on Material)
Boiler repairing of VCT Boiler No: WBL-6812 of Pit No 5&6 at Madhaipur Colliery Pandaveswar area. (Inclusive of EPF/CMPF)
Old damaged shell extension plate angle gas cutting and out dressing grinding consumable(Material cost)
Old damaged shell extension plate angle gas cutting and out dressing grinding consumable (labour Cost)
Shell extension plate materials few late angle + 10% allowance = 300 kg (Size 6' dia & 1' height) thick 12 mm
New Shell extension plate & angle rolling, bending, fabrication & same position fitting welding, grinding, dressing smoothly consumable(Material Cost)
New Shell extension plate & angle rolling, bending, fabrication & same position fitting welding, grinding, dressing smoothly consumable(Labour Cost)
New Shell extension plate & angle rolling, bending, fabrication & same position fitting welding, grinding, dressing smoothly consumable(Labour Cost)
Boiler cross tube gas cutting opening, dismantling out and dressing, grinding proper -V cutting with consumable (Material Cost)
Boiler cross tube gas cutting opening, dismantling out and dressing, grinding proper -V cutting (Labour charges)
Boiler cross tube gas cutting opening, dismantling out and dressing, grinding proper -V cutting (Labour charges)
Boiler cross tube same positioning erection, fitting BQ welding with side 350mmX1825mmX13mm of 360 Kg(Material Cost)
Boiler cross tube same positioning erection, fitting BQ welding with side 350mmX1825mmX13mm of 360 Kg(Labour Cost)
Boiler cross tube same positioning erection, fitting BQ welding with side 350mmX1825mmX13mm of 360 Kg(Labour Cost)
Damaged fusible plug opening , boring and threading labour charges
New fusible plug fitting in same position with material IBR T.C.(material cost)
New Mud plug covered making machining drilling with materials Consumable
New Mud plug covered making machining drilling labour Charges
New Mud plug covered making machining drilling Labour Charges
Hydraulic test arrangement by Boiler Inspector Director(material cost)
Hydraulic test arrangement by Boiler Inspector Director(Labour Cost)
Boiler fitting purpose materials type joint, cotton tape, steam joint, hole tight, nut bolt, rubber joint, fiber bush, rubber cone gauge glass etc.
Boiler fire bar & ring fabricated assembly fitting with consumable
Boiler fire bar & ring fabricated assembly fitting with consumable(Labour Charges)
Boiler fire bar & ring fabricated assembly fitting with consumable(Labour Charges)
Boiler fitting and commissioning steaming & running condition(Labour Charges)
Profit @10% (on Material)
Boiler repairing of VCT Boiler No: WBL-10589 of Pit No 9 at Madhaipur Colliery Pandaveswar area. (Inclusive of EPF/CMPF)
Old damaged shell extension plate angle gas cutting and out dressing grinding consumable(Material cost)
Old damaged shell extension plate angle gas cutting and out dressing grinding consumable (labour Cost)
Shell extension plate materials few late angle + 10% allowance = 320 kg (Size 6' dia & 1' height) thick 12 mm
New Shell extension plate & angle rolling, bending, fabrication & same position fitting welding, grinding, dressing smoothly consumable(Material Cost)
New Shell extension plate & angle rolling, bending, fabrication & same position fitting welding, grinding, dressing smoothly consumable(Labour Cost)
New Shell extension plate & angle rolling, bending, fabrication & same position fitting welding, grinding, dressing smoothly consumable(Labour Cost)
Boiler cross tube gas cutting opening, dismantling out and dressing, grinding proper -V cutting with consumable (Material Cost)
Boiler cross tube gas cutting opening, dismantling out and dressing, grinding proper -V cutting (Labour charges)
Boiler cross tube gas cutting opening, dismantling out and dressing, grinding proper -V cutting (Labour charges)
Boiler cross tube same positioning erection, fitting BQ welding with side 350mmX1825mmX13mm of 360 Kg(Material Cost)
Boiler cross tube same positioning erection, fitting BQ welding with side 350mmX1825mmX13mm of 360 Kg(Labour Cost)
Boiler cross tube same positioning erection, fitting BQ welding with side 350mmX1825mmX13mm of 360 Kg(Labour Cost)
Damaged fusible plug opening , boring and threading labour charges
New fusible plug fitting in same position with material IBR T.C.(material cost)
New Mud plug covered making machining drilling with materials Consumable
New Mud plug covered making machining drilling labour Charges
New Mud plug covered making machining drilling Labour Charges
Hydraulic test arrangement by Boiler Inspector Director(material cost)
Hydraulic test arrangement by Boiler Inspector Director(Labour Cost)
Boiler fitting purpose materials type joint, cotton tape, steam joint, hole tight, nut bolt, rubber joint, fiber bush, rubber cone gauge glass etc.
Boiler fire bar & ring fabricated assembly fitting with consumable
Boiler fire bar & ring fabricated assembly fitting with consumable(Labour Charges)
Boiler fire bar & ring fabricated assembly fitting with consumable(Labour Charges)
Boiler fitting and commissioning steaming & running condition(Labour Charges)
Profit @10% (on Material)
Boiler repairing of VCT Boiler No: WBL-10511 of Pit No 1 at Madhaipur Colliery Pandaveswar area. (Inclusive of EPF/CMPF)
Damaged furnace plate - gas cutting, out dressing grinding with consumable Materials
Damaged furnace plate - gas cutting, out dressing grinding (Labour charge)
New furnace BQ Plate size 1 mX 1m of thickness 16mm + 10% all ounaceweight 150kgs
Rolling Furnance Plate ,Proper fabricated 'V' & fitting at same position with consumable material
Rolling Furnance Plate ,Proper fabricated 'V' & fitting at same position (labour charge)
Rolling Furnance Plate ,Proper fabricated 'V' & fitting at same position with consumable material and labour
B.Q. plate welding both side Shell plate and furnace plate 4 meter(Material Cost)
B.Q. plate welding both side Shell plate and furnace plate 4 meter(Labour Charge)
Rivet work 50 nos., gas cutting, heated hammering and out by manual with consumable & fitting BQ welding with side 350mmX1825mmX13mm of 360 Kg (Material Cost)
Rivet work 50 nos., gas cutting, heated hammering and out by manual with consumable & fitting BQ welding with side 350mmX1825mmX13mm of 360 Kg(labour Cost)
Rivet hole BQ welding built up and hole removing with consumable & labour charges
Same positioning riveting, cocking with materials, consumable
Same positioning riveting, cocking with materials, consumable(labour charges)
Boiler cross tube gas cutting opening, dismantling out and dressing, grinding proper -V cutting with consumable(Material Cost)
Boiler cross tube gas cutting opening, dismantling out and dressing, grinding proper -V cutting (Labour charges)
Boiler cross tube same positioning erection, fitting BQ welding with side 350mmX1825mmX13mm 360 Kg(Material cost)
Boiler cross tube same positioning erection, fitting BQ welding with side 350mmX1825mmX13mm 360 Kg(labour cost)
Boiler cross tube same positioning erection, fitting BQ welding with side 350mmX1825mmX13mm 360 Kg
Stage Inspection Arrangement by Boiler inspector(Material cost)
Stage Inspection Arrangement by Boiler inspector(Labour cost)
Hydraulic test arrangment by Boiler inspector Director(material Cost)
Hydraulic test arrangment by Boiler inspector Director(Labour cost)
Water filling
Valve Drilling, steam joint, nut bolt, old Valve opening, same positioning, fitting with consumables(material cost)
Valve Drilling, steam joint, nut bolt, old Valve opening, same positioning, fitting (labour Charges)
Boiler fitting and commissioning steaming & running condition
Profit @10% (on Material)
Total impact of GST for the purpose of CTC
UNITED ENGINEERING ENTERPRISE (BID ID -1184375)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .