| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹14.8 L+₹738.55 (0.05%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | A.Velladurai L1 | MUPIDATHI L2 |
|---|---|---|---|---|---|
| 1.00Construction of Multi Purpose Hall @ Kumaresan colony village in Keela Kadayam Panchayat in Kadayam Panchayat Union Under MLACDS - 2026 - 2027 | |||||
| 2.00 | Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for corewall etc., complete. | 32.03 | Cum | 260 ₹8,327.8 Lowest | 263.5 ₹8,439.91 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 8.47 | Cum | 5,281 ₹44,730.07 Lowest | 5,282.3 ₹44,741.08 |
| 4.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete., | 19.38 | Cum | 6,067 ₹1,17,578.46 Lowest | 6,068.3 ₹1,17,603.65 |
| 5.00 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site | 28.03 | Qtl | 9,185 ₹2,57,455.55 Lowest | 9,186.5 ₹2,57,497.6 |
| 6.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete., | 27.28 | Cum | 8,894 ₹2,42,628.32 Lowest | 8,895 ₹2,42,655.6 |
| 7.00Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Above basement | |||||
| 8.00 | Below Basement | 56.52 | Sqm | 547.5 ₹30,944.7 Lowest | 547.5 ₹30,944.7 Lowest |
| 9.00 | Above Basement | 143.57 | Sqm | 1,095 ₹1,57,209.15 Lowest | 1,095 ₹1,57,209.15 Lowest |
| 10.00 | Refilling the basement with excavated earth including all labour charges such as watering and ramming etc complete. | 15.92 | Cum | 45.5 ₹724.36 Lowest | 45.8 ₹729.14 |
Tender Value
₹20 L
EMD Value
₹15,000
Closing Date
30 Sept 2026, 3:00 pmClosed
Block Development officer,B.Pt
Block development Officer ( B.Pt ), Panchayat Union Office, Kadayam.
Construction of Multi Purpose hall building at Kumaresan colony in Keelakadayam Panchayat
2026_RDTN_704382_3
BDKDM/477/2026-A3
Open Tender
Civil Works
Works
Kadayam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹15,000
30 Sept 2026
15 Sept 2026
30 Sept 2026
15 Sept 2026
30 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Multi Purpose Hall @ Kumaresan colony village in Keela Kadayam Panchayat in Kadayam Panchayat Union Under MLACDS - 2026 - 2027 | - | - | - | - |
| 2 | Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for corewall etc., complete. | 32.03 | Cum | 263.78 | ₹8,448.87 |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 8.47 | Cum | 5,282.34 | ₹44,741.42 |
| 4 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete., | 19.38 | Cum | 6,068.38 | ₹1,17,605.2 |
| 5 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site | 28.03 | Qtl | 9,186.59 | ₹2,57,500.12 |
| 6 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete., | 27.28 | Cum | 8,895.15 | ₹2,42,659.69 |
| 7 | Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Above basement | - | - | - | - |
| 8 | Below Basement | 56.52 | Sqm | 547.5 | ₹30,944.7 |
| 9 | Above Basement | 143.57 | Sqm | 1,095 | ₹1,57,209.15 |
| 10 | Refilling the basement with excavated earth including all labour charges such as watering and ramming etc complete. | 15.92 | Cum | 45.85 | ₹729.93 |
stage.html
html • 0.02 MB
finance_846636.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_846636.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .