Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.3 LAccepted-Finance | ₹19.3 L | L1 | Accepted-Finance The L1 bidder has quoted has less Percentage |
| 2 | L2₹19.6 LRejected-Finance | ₹19.6 L | L2 | Rejected-Finance The L2 bidder has quoted has Excess Percentage |
Tender Value
₹19.0 L
EMD Value
₹19,100
Closing Date
20 Jan 2026, 3:00 pmClosed
Executive Engineer,PWD
Collectorate Campus Kancheepuram
Construction of One Class Room Building in Panchayat Union Primary at Kattuputhur in Uthiramerur Taluk of Kancheepuram District
2026_PWD_644422_1
23KPM/01/2025-2026
Open Tender
Civil Works - Buildings
90 days
Kattuputhur
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹19,100
Yes
20 Jan 2026
19 Jan 2026
20 Jan 2026
19 Jan 2026
20 Jan 2026
19 Jan 2026
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation, basement, etc with filling M.sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Refilling in basement with Excavated earth in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and filling in foundation, basement, etc with crushed stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:5:10 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner, vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid).
Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c, etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid).
Supplying and erecting centering for plane surfaces such as RCC Floor Slab, Roof Slab, Loft, Landing Slabs, etc with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over steel adjustable span of size 2m x 2m (expandable upto 3.60m) and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid).
Supplying and erecting steel centering including necessary supports For plane surfaces such as rectangular or square RCC columns etc. which require only nominal strutting using mild steel sheets made of 10 gauge thick welded with MS angle size 40mm x 40mm x 5 mm and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick).etc..complete in all floors complying with standard specifcation. Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid).
In foundation and basement
In Ground floor
In foundation and basement
In Ground floor
Foundation & Basement
In Ground floor
In Ground Floor 11cm Thick
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers
Finishing the top of roof with one course of machine pressed tiles of following size of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers.
Using Fine polished Kota Stone Slab above 600 x 600 of 18 / 20mm size
Paving pre-polished concrete anti-skid step tiles (Required shape and design) of 20mm thick of approved quality and colour laid in accordance with IS 1443 in Cement Mortar 1:3 (One Cement and Three crushed stone sand), with required Cement Slurry and Mortar Plasticizer, 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers.
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including mortar plasticizer at 200ml per 50Kg of cement used, hacking the surfaces and curing, etc., in all floors complying with standard specification and as directed by the departmental officers.
Supplying and applying of Two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothly with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the departmental officers. (The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (water proof abrasive sheet) cost of putty blade, labour charges for grinding the joints and sand papering, two coats of putty, scrapping the putty area to level the surface smooth, etc., complete). The putty should be got approved by the Executive Engineer before use on work
Supply and Installation of Ceramic writing Board made on steel core the long lasting porcelain is fused at temperatures up to 800 c. with this process a scratch and stain resistant surface is created and becomes smooth and erasing free of "Ghost lines" virtually maintenance free, this chalk board never acquires. "chalking in" and total cleaning is accomplished with clear water the writing surface will not crack peel even when solvents are use to remove crayon, paint or other foreign substances highly versatile, the entire writing area can become a display board with the help of magnetic buttons. The boards are made of 0.4mm ceramic on steel writing surface 9mm MDF, 0.2mm, GI sheet. The above three materials sandwiched with rubber based.
110 mm dia (In building with ground floor only)
Supplying and fixing fine polished cuddapah slab of following thickness for cup-board arrangements including laying to correct alignment with necessary cement mortar and black powder etc, complete complying with standard specification and as directed. 40mm thick
Manufacturing, Supplying and Fixing of Stainless Steel Hand rails for staircase using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick at required locations to a height of 900mm from finished floor level welded to 38mm dia Stainless Steel pipe post of 1.00mm thick as vertical at 900mm centre with 2 Nos. of 25mm dia intermediate horizontal stainless steel pipe of 1.60mm thick in between. The vertical pipe has to be welded to the 100 X 100 X 6mm MS base plate encased in the base concrete. The rate is inclusive of the charges for cutting, bending, welding, grinding, polishing, conveyance, electrical charges, etc. complete
Supplying and fixing of M.S. grill of approved design for open courtyard, grill, grill work to doors and window openings etc., using necessary mild steel flats for inner and outer members which should be fixed on edges including cutting the members, welding, grinding, one coat of priming coat using best approved quality red oxide primer, dismantling of walls / concrete if necessary, fixing and finishing the dismantled portion to original condition etc., complete complying with standard specification.
Manufacturing supplying and fixing of Fully panelled steel door with the following specification MS angels of size 40x40x6mm are used for the outer frames and M.S. angles of size 35x35x6mm for the shutter frames stiffeners with 32 x 6mm M.S flat is provided at required intervals in the shutter frame. 18-gauge C.R. sheet laid as panel in the shutter and welded intact. M.S. flat 18x5mm is welded over the 32 x 6mm M.S. flat sandwitching the C.R. sheet in between additional stiffeners with 18x5mm M.S. flat is provided diagonally at the rear side of the shutter, 3nos. of Steel Parliament Hinges of Size 125mm x 150mm in case of single leaf and 6nos. of Steel Parliament Hinges of Size 125mm x 150mm in double leaves shutter to be provided 6nos. of holdfasts 200 mm in length made of angle section spliced at the ends are welded to the outer frames of the door. Tower bolts 4nos. One the top of each shutter, one at lock rail and the other at the bottom are provided. 1no. Aldrop is provided at lock rail section in the door 3 Nos of handle are to be provided, one more aldrop is provided in the inner lock rail section of the door One rotaing locking arrangements for the inner side of the door and additional provision for locking arrangements for lock is provided on the rear side of the door at an appropriate place. Incase of double leaf door M.S.Flat 32 x 3mm at 1.1Kg/m is provided on the one shutter t conceal the gap between the two shutters.at an appropriate place in the door. A tie bar is provided at the bottom of the frame to prevent twisting of frame during transportation and fixing. All members are given a coat of red oxide primer as directed by the departmental officers. The rate includes cost of all materials, labour charges, transportation to site of work, loading, un loading and all other incidental charges etc.,complete complying with standard specification and as directed by the departmental officers. - Double leaf of size 1.20m x 2.10m.
Two leaves
Painting two coats of newly plastered wall surface with ready mixed interior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting two coats of newly plastered wall surface with ready mixed Exterior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification.
SUB TOTAL
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
ETN2301.pdf
Tender Documents • 0.18 MB
BOQ_772263.xls
BOQ • 0.30 MB
GeneralCondition.pdf
Tender Documents • 0.31 MB
Download all tender documents and submit your bid