Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified |
| 2 | Accepted-Technical | Accepted-Technical Qualified |
Tender Value
₹7.5 Cr
EMD Value
₹15.1 L
Closing Date
13 Aug 2026, 4:00 pmClosed
Superintending Engineer
Superintending Engineer 16th Circle Irrigation work pratapgarh
Restoration and demarcation of Rajamau Dy from Km. 0.000 to Km. 32.700 in Raebareli division (south), Sharda canal Raebareli
2026_UPIDC_1174979_2
03/S.E/XVI/2026-27
Open Tender
Civil Works
Item Rate
365 days
Raeebareli.
Please refer Tender documents.
3 documents required · 3 mandatory
₹9,878
₹15.1 L
Yes
24 Aug 2026
6 Aug 2026
14 Aug 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation including chharri-bajari, wet earth, slush kanker which is not separable i.e. all type of soils including dewatering with all leads, lifts, labour, T&P and proper disposal etc complete. | - | M3 | 154.9 | - |
| 2 | Providing and laying plain cement concrete A20-M15 mix (1:2:4) Concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) complete in all respect including all cost of material labour T&P and dewatering if any etc. but excluding centering and shuttering to complete the job to complete the job as per sanctioned drawing and in the direction of Engineer- In - Charge. | 1 | M3 | 8,404 | ₹8,395.6 |
| 3 | Providing bending, binding, and placing of reinforcement Fe-500 / Fe-550 TMT deformed bars conforming to IS code to complete all respect including cost of material , labour, binding wire, T&P etc. | - | MT | 1,12,178.11 | - |
| 4 | Providing and Laying A20-M20 mix (1:1.5:3) Reinforced Cement Concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 -20 mm) & Banda c-sand (F.M 1.5 - 2.0) complete in all respect including all cost of material, labour & T&P required for proper completion of work but excluding centering and shuttering to complete the job as per sanctioned drawing and in the direction of Engineer- In - Charge. | 1 | M3 | 8,912.5 | ₹8,903.59 |
| 5 | Centering & Shuttering of RCC work including rent of shuttering material labour & T&P required for proper completion of work. | - | M2 | 838.7 | - |
| 6 | Painting in synthetic enamal paint on Pillars complete in all respect including cost of all material labour T&P etc. | 1 | M2 | 123 | ₹122.88 |
| 7 | Writing letter on sign board above 50 mm size but below80 mm size | - | Letter | 8.5 | - |
| 8 | Dry brick on edge soling for making khadanja road work including preparing sub-grade ,filling joints with local earth spreading , a binding coat of 1 cm of local earth on entire surface made and all labour , T&P to complete the job chainage from km 0.00 to km 8.00, and from km 23.00 to km 28.90 | - | M2 | 444.7 | - |
| 9 | Demolishing cement concrete manually /by mechanical means including disposal of material within 50 meters lead as per direction of Engineer -In - Charge . | 1 | M3 | 1,077.48 | ₹1,076.4 |
| 10 | Providing and Laying A20-M10 mix (1:3:6) plain cement concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0)in foundation complete in all respect excluding centering shuttering but including cost of all materials, labours & T&P etc to complete the job as per sanctioned drawing & specification in the direction of Engineer in charge. | - | M3 | 7,317.4 | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.18 MB
BOQ_2207950.xls
BOQ • 0.30 MB
rajamaubid.pdf
Tender Documents • 2.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .