Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 CrAccepted-AOC | L1 | Accepted-AOC Awarded | |
| 2 | L2₹15.4 Cr+₹34.4 L (2.28%)Rejected-Finance | L2 | Rejected-Finance Quoted Higher Rate | |
| 3 | L3₹15.7 Cr+₹65.1 L (4.32%)Rejected-Finance | L3 | Rejected-Finance Quoted Higher Rate | |
| 4 | L4₹16.1 Cr+₹1.0 Cr (6.73%)Rejected-Finance | L4 | Rejected-Finance Quoted Higher Rate | |
| 5 | L5₹16.6 Cr+₹1.5 Cr (9.88%)Rejected-Finance | L5 | Rejected-Finance Quoted Higher Rate |
Tender Value
Refer Docs
EMD Value
₹11.6 L
Closing Date
13 Jun 2022, 3:00 pmClosed
CGM/PH/KSDP
First Floor, Above Maruti Suzuki Showroom,Near Jhinjhri Police Station,NH-7, Jabalpur Road, Katni-483501(MP)
Construction, Strengthening extension of Existing Sub-Structure along With Construction Of New Foundation andSubstructure for Major Bridge No.1187-3 in Katni- Singrauli Rail Line Doubling Project under WCR in the state of Madhya Pradesh
2022_IRCON_117765_1
IRCON_2065_BRIDGE_107
Limited
Civil Works
Percentage
240 days
Katni -Singrauli Doubling Railway Project
Please refer Tender documents.
6 documents required · 6 mandatory
₹30,000
HDFC Bank Katni
₹11.6 L
13 Oct 2022
2 Jun 2022
14 Jun 2022
2 Jun 2022
13 Jun 2022
2 Jun 2022
Government eProcurement System Created By: Sunil Kumar Mishra Created Date/Time: 14-Jun-2022 03:48 PM Tender Title: Construction, Strengthening extension of Existing Sub-Structure along With Construction Of New Foundation andSubstructure for Major Bridge No.1187-3 in Katni- Singrauli Rail Line Doubling Project under WCR in the state of Madhya Pradesh Tender ID: 2022_IRCON_117765_1
Tender Inviting Authority: Chief General Manager , IRCON INTERNATIONAL LIMITED, Katni, Madhya Pradesh
Name of Work: Construction, Strengthening & extension of Existing Sub-Structure along With Construction Of New Foundation &Substructure for Major Bridge No.1187/3 in Katni – Singrauli Rail Line Doubling Project under West Central Railway in the state of Madhya Pradesh PKG 09.
Contract No: IRCON/2065/KSDP/tender/Bridge Substructure/pkg 9/107 Date: 02.06.2022
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 Tracks And Towers Infratech Pvt Ltd(GSTN-36AACCT7497H1ZT) 111698162.00 40.75 157215163.02 Fifteen Crore Seventy Two Lakh Fifteen Thousand One Hundred and Sixty Three
2.00 M/s Bihari Lal Menghani(GSTN-07AAFFB5151N1ZB) 111698162.00 38.00 154143463.56 Fifteen Crore Fourty One Lakh Fourty Three Thousand Four Hundred and Sixty Three
3.00 M/s D K Chauhan(GSTN-NA) 111698162.00 34.92 150703160.17 Fifteen Crore Seven Lakh Three Thousand One Hundred and Sixty
4.00 Pilcon Engineering(GSTN-NA) 111698162.00 48.25 165592525.17 Sixteen Crore Fifty Five Lakh Ninty Two Thousand Five Hundred and Twenty Five
5.00 NIRANJAN KUMAR PANJWANI(GSTN-NA) 111698162.00 44.00 160845353.28 Sixteen Crore Eight Lakh Fourty Five Thousand Three Hundred and Fifty Three
Lowest Amount Quoted BY: M/s D K Chauhan(150703160.17)
BOQ Summary Details Tender Title: Construction, Strengthening extension of Existing Sub-Structure along With Construction Of New Foundation andSubstructure for Major Bridge No.1187-3 in Katni- Singrauli Rail Line Doubling Project under WCR in the state of Madhya Pradesh Tender ID: 2022_IRCON_117765_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 M/s D K Chauhan 150703160.17 L1
2 M/s Bihari Lal Menghani 154143463.56 L2
3 Tracks And Towers Infratech Pvt Ltd 157215163.02 L3
4 NIRANJAN KUMAR PANJWANI 160845353.28 L4
5 Pilcon Engineering 165592525.17 L5
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .