Loading…
Loading…
Tender ID
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
27 Apr 2026, 9:00 amClosed
COMMISSIONER MUNICIPAL COUNCIL KOTPUTLI
COMMISSIONER MUNICIPAL COUNCIL KOTPUTLI
Construction of boundary wall for Nath Samaj Shamshan Bhumi
2026_DLB_552405_4
NPK/2026-27/73
Open Tender
Civil Works
Percentage
365 days
KOTPUTLI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
COMMISSIONER MUNICIPAL COUNCIL, MD RISL JAIPUR
₹50,000
Yes
17 Apr 2026
17 Apr 2026
27 Apr 2026
17 Apr 2026
27 Apr 2026
17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for roadway, including trimming bottom and
side slopes in accordance with requirement of line, grades and cross
sections, including disposal of surplus material with all lift and lead
upto 1000 metre as per MoRT&H specification clause 301. In all type of soil | - | cum | - | - |
| 2 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | - | cum | - | - |
| 3 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 4 | Extra for random rubble masonry with hard stone in superstructure above plinth level and upto two stories. | - | cum | - | - |
| 5 | Brick masonry work in cement mortar with mechanical mixer with First class bricks (min. 10.5 Mpa) in foundation (at any level) complete as per drawing and technical specification and as per clause 1000 & 1300 of MoRT&H specification including all scaffolding material, labour, machinery but excluding pointing and plastering. Brick masonry work in cement mortar with mechanical mixer with
First class bricks (min. 10.5 Mpa) in foundation (at any level)
complete as per drawing and technical specification and as per
clause 1000 & 1300 of MoRT&H specification including all
scaffolding material, labour, machinery but excluding pointing and
plastering. | - | cum | - | - |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc. upto two stories, excluding the cost of centring, shuttering and finishing : 1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm
nominal size) (As per design mix) including Providing /mixing of
synthetic fibers compulsorily complying with IS 16481:2022 of 06
mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e.
125 gms per 50 kg Cement up to 900 gms per cum of Concrete/
mortar. | - | cum | - | - |
| 7 | Plastering with cement mortar (1:3) on Brick/stone work in substructure/ super structure at any height complete as per clause 1312 of MoRT&H specification including all material, labour, scaffolding etc.20 mm plaster on stone work | - | sqm | - | - |
| 8 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | - | cum | - | - |
| 9 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Mild steel and Medium Tensile steel bars. | - | kg | - | - |
| 10 | Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete | - | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.68 MB
BOQ_984406.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .