Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹31.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L1₹31.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L2₹33.8 L+₹2.0 L (6.25%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L2₹33.8 L+₹2.0 L (6.25%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L2₹33.8 L+₹2.0 L (6.25%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹39.8 L
EMD Value
₹79,680
Closing Date
16 Jul 2026, 6:00 pmClosed
EXEN REW SGR
EXECUTIVE ENGINEER REW SRINAGAR
Balance portion of Common Facility Centre for Playground at Muftifbagh Gandtal
2026_RDPR_314940_13
ENIT09/REW SGR 2025-26
Open Tender
Civil Works
Percentage
SRINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Rural Development and Panchayati Raj
₹79,680
21 Jul 2026
8 Jul 2026
17 Jul 2026
8 Jul 2026
16 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Brick work with FPS bricks of class designation 75 in super structure in cement mortar 1:6 (1 cement, 6 coarse sand) | 39.93 | Cum | 9,000 | ₹3,59,370 |
| 0_) | Centring and shuttering incld. Strutting, proping etc & removal of form work for suspended floors, roofs, landings, balconies & access plateform | 213.29 | Cum | 718.2 | ₹1,53,184.88 |
| 0_) | Reinforcement for RCC work incld straightning, cutting, bending, placing in position & binding all complete (Thermo-mechanically treated bars) | 3,635.55 | Kg | 123.2 | ₹4,47,899.76 |
| 0_) | P/L in position specified grade of reinforced cement cencrete excld. The cost of centring, shuttering, finishing and reinforecement-All work upto plinth level. 1:1.5:3 graded stone agg. 20mm nominal size | 4.47 | Cum | 7,275.95 | ₹32,523.5 |
| 0_) | Reinforced cement conc. Work in beams, suspended floors roofs having slope upto 15 deg. Landing balconies, shelves, lintels upto floor 5 level excld. Centring, shuttering in 1:1.5:3 20mm stone agg. Nominal size | 28.58 | Cum | 9,821.85 | ₹2,80,708.47 |
| 0_) | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Imported wood | 1.95 | Cum | 50,000 | ₹97,500 |
| 0_) | Providing & fixing panelled or panelled & glazed shutters for doors & windows and clerestory windows including ISImarked black enamelled M.S Butt hingeswith necessary screws excluding panelling 2nd cass Kail wood 35mm thick (test check certificate by duly vetted by forest deptt) | 12.22 | Sqm | 2,853.95 | ₹34,875.27 |
| 0_) | Providing and fixing of Pre-laminated particle board with decorative lamination on both sides, Grade I, Type II IS : 12823 marked | 14.22 | Sqm | 1,748.4 | ₹24,862.25 |
| 0_) | Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with waterproofing cement compound consisting of applying :
(a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253kg/ sqm. This layer will be allowed to air cure for 4 hours.
(b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm . This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. | 15.92 | Sqm | 485.1 | ₹7,722.79 |
| 0_) | Supplying and applying bituminous solution primer on roof and or wall surface at 0.24 litre per sqm. | 24.85 | Sqm | 52.75 | ₹1,310.84 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_1020224.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .