| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.2 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹47.2 L+₹2 L (4.43%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹45.3 L
EMD Value
₹46,000
Closing Date
27 Mar 2024, 5:00 pmClosed
se edc
sonbhadra
Electrification Work
2024_PVVNV_915175_1
144/edc(so)/2023-24
Open Tender
Electrical Works
Item Rate
90 days
sonbhadra
Pleased Ref Tender Doc.
2 documents required · 2 mandatory
₹3,540
SE EDC SONEBHADRA Bank A/c No.089105000853
₹46,000
26 Apr 2024
11 Mar 2024
28 Mar 2024
11 Mar 2024
27 Mar 2024
11 Mar 2024
Centralized Materials of following materials as per RESSPO/PuVVNL norms at the work site provided by Store Centar Robertsganj
ST Pole 11 Mtr.
11 KV VCB Outgoing 200/100/5A
M.S. Top Channel (125*65*3200)
Cross Bracing MS Angle
11 KV XLPE Cable 3x185 sq. mm
GI Pipe 8" dia
Lightening Arrestor 11 KV
Stay Complete
Earthing Complete
Line Isulator
Decenterlized Material Provided by Contractor
Holding clamp for XLPE Cable with STP
Clamp for Top Channel
Clamp for Cross Bracing MS Angle
Danger Board with clamp nut & bolt
Barbed Wire
Earth wire clamp
Various type nut & bolts
Stay Clamp with nut & bolt
Battery Charger 24 Volt
11 KV Jointing Kit S/T for XLPE 3x185sq.mm
11 KV Jointing Kit O/D for XLPE 3x185sq.mm
33 KV FUSE SET
Stone pad (300*300*75) mm
Work of following material as per Respo/Puvvnl norms at the work site.
Erection of Sectional Double Pole Structure of ST/PCC pole including digging of pit, fitting of accessories, back filling of earth, grouting of each pole & stay sets & other required works with by jumpering with E bracket & Pin Insulator.
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Grouting of stay with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Earthing of Poles
Lying of 11 KV XLPE Cable size 3x185 mm2 including cost of sand and bricks and also with GI pipe.
Making of S/T cable jointing 3x185 sqmm of 11 KV kit
Making of O/D cable jointing 3x185 sqmm of 11 KV kit
Erection of cross bassing on double pole
Installation of Battery charger with 24 volt batary
Installation of 11 KV VCB O/G 200/100/5 Amp.
Installation of danger board
Installation of stone pad
Tree branch cutting
Installation of 33 KV line Isolator
Installation of 33 KV fuse set
Installation of 33 KV lighting Arestor
Installation of 11 KV lighting Arestor
TRIDEV INFRACON
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .