Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-Finance | ₹5.1 L | L1 | Accepted-Finance lowest |
Tender Value
₹6.3 L
EMD Value
₹12,612
Closing Date
12 Aug 2026, 6:00 pmClosed
Dcf jhunjhunu
dcf jhunjhunu
Rdf 2nd Manksas 2nd
2026_FORES_581831_1
16/2026-27
Open Tender
Miscellaneous Works
Percentage
work
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
dcf jhunjhunu
₹12,612
Yes
17 Aug 2026
4 Aug 2026
13 Aug 2026
4 Aug 2026
12 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavared area and dewatering wherever required complete in all respect 5.1.0.2 hard /dense soil 700 rmt | - | CUM | 93 | - |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect 5.1.0.3 hard soil mixed with kanker / boulders, morrum 400 rmt | - | CUM | 115 | - |
| 3 | purchase of barbed wire | - | KG | 120 | - |
| 4 | purchase of iron angles 35 mm x 35 mmx 5 mm of 1.50 m length | - | Nos | 438 | - |
| 5 | Cement bags (50 kg) for fixing of iron angle | - | Nos | 400 | - |
| 6 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavared area and dewatering wherever required complete in all respect 5.1.0.2 hard /dense soil 2000 rmt | - | CUM | 93 | - |
| 7 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect 5.1.0.3 hard soil mixed with kanker / boulders, morrum 1000 rmt | - | CUM | 115 | - |
| 8 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including, dressing of excavated area and, dewatering wherever required, complete in all respect Hard / dense soil | - | PER CUM | 118 | - |
| 9 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect 5.1.0.3 hard soil mixed with kanker / boulders, morrum 3000 pits 0.45x0.45x0.45x3000 | 1 | CUM | 115 | ₹114.89 |
| 10 | Earth work in excavation by mechanical means (hydraulic excavator) / manual means over areas (exceeding 30 cm in depth. 1.5m in width as well as 10 sum on plan) including disposal of excavated earth, lead upto 50m and all lift upto 1.5m disposed earth to be levelled and neatly dressed. All kind of soil. | - | CUM | 175 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
bid16.pdf
Tender Documents • 4.97 MB
BOQ_1033754.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .