Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance | -75.99% | ₹2.1 L | L1 | Admitted-Finance |
| 2 | L1₹2.1 LAdmitted-Finance AB 337 AMAR PURI RAM NAGAR PAHAR GANJ NEW DELHI 55 | CENTRAL DELHI | DELHI | 110002 | -75.99% | ₹2.1 L | L1 | Admitted-Finance |
| 3 | L2₹2.4 LAdmitted-Finance | -72.51% | ₹2.4 L | L2 | Admitted-Finance |
| 4 | L3₹2.8 LAdmitted-Finance | -68.12% | ₹2.8 L | L3 | Admitted-Finance |
| 5 | L3₹2.8 LAdmitted-Finance | -68.12% | ₹2.8 L | L3 | Admitted-Finance |
Tender Value
₹8.7 L
EMD Value
₹17,445
Closing Date
23 Apr 2026, 6:00 pmClosed
EE (Civil)
EE (Civil), BCD-I, New Delhi-110001
Rate Contract for Repair and Maintenance of Type-I, II, III, IV and V Quarters P and T Colony, Kali Bari, Telegraph Square, Peshwa Road, Baba Kharak Singh Marg and Dev Nagar, New Delhi for the financial year 2026-27
2026_BSNL_274715_1
04/EE/BCD-I/ND/2026-27
Open Tender
Civil Works
365 days
Dev Nagar
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
AO (Cash)
₹17,445
30 Apr 2026
14 Apr 2026
27 Apr 2026
14 Apr 2026
23 Apr 2026
14 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1SUBHEAD-I DSR-2023 ITEMS | ||||||
| 1.01 | All items contained in Delhi Schedule of Rates-2023 for Civil Works, read with up-to-date correction slips issued by CPWD with rates rationalized Considering 10% Contractors Profit and Over heads instead of 15 %.
Rate Unit
As per DSR 2023 As per DSR 2023
(read with all correction
slips issued till the date of
issue of work - order) | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 2SUBHEAD-II NON DSR ITEMS | ||||||
| 2.1 | Providing and fixing MR grade plywood conforming to IS 303, with commercial ply on both faces, in cupboards, kitchen Cabinets, furniture etc. Fixing is to be done with nails, steel screws (counter sunk type) and adhesive complete as per the direction of Engineer-in-charge. | - | - | - | - | BI01010001010000000000000515BI0100001114 |
| 2.2 | a) Plywood 9 ply, 18mm thick | - | One Square Metre | - | - | BI01010001010000000000000515BI0100001115 |
| 3Providing and fixing multipurpose cement bonded wood particle board conforming to IS: 14276 (Bison panel or Equivalent) in cupboards, wardrobes, furniture etc. Fixing is to be done with nails, steel screws (counter sunk type) and adhesive complete as per the direction of Engineer-in-charge | ||||||
| 3.1 | a) 8mm thick | - | One Square Metre | - | - | BI01010001010000000000000515BI0100001117 |
| 3.2 | b) 20mm thick | - | One Square Metre | - | - | BI01010001010000000000000515BI0100001118 |
| 4Cleaning /Machine rubbing of floors Mosaic/terrazzo flooring including skirting with electrically operated grinding machine with fine stone of required numbers. The grinding should be done atleast in one stages and necessary repairing of to the existing floor be done with white cement and marble powder (and using color of required shade if required.The floor should be cleaned and washed with oxalic acid and left to dry. Finally floor should be polished with wax polished of approved quality and saw dust all complete to give glossy finish as per direction of Engineer-in-Charge. (Note: Water and power supply if available may be supplied to the contractor by the BSNL subject to the following conditions: i) The water charges @ 1 % shall be recovered on gross amount of the work done. ii) The contractor (s) shall make his/their own arrangement of water connection and laying of pipelines from existing main source of supply. iii) The contractor shall make his own arrangement to extend the power supply from the tapping point and install a sub meter for recording consumption of power in the work. The consumption charges thereof shall be recovered from the contractor by deduction from his bills or from any other dues | ||||||
| 5Providing and fixing 28mm diaAluminium pipe (heavy) for curtain rod powder coated / colouranodised to golden yellow shade or in required shade including the cost of providing pair of mild steel brackets and PVC end cap or finel with necessary screws etc as per site requirement all complete as per directions of Engineer-in-Charge. | ||||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_320738.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid