Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹32.1 L+₹1.8 L (6.08%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹33.5 L+₹3.2 L (10.7%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹34.0 L+₹3.8 L (12.5%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | Rejected-Technical | - | Rejected-Technical Due to short document |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
15 Apr 2021, 6:00 pmClosed
Superintending Engineer PHED Circle Nagaur
Superintending Engineer PHED Circle Nagaur
Constt n Comm of borehole by DTH/Rot/Comb of 200mm supply n installation of energy eff. Sub. Pump sets n other allied works incl. comm n testing of TW under Distt.Sub Dn II Ngr with 2 year defect liability 3 year OnM after comp. of defect lia. period
2021_PHCJA_217555_1
Nit No 98/2020-21 SE
Open Tender
Civil Works - Water Works
Percentage
365 days
Executive Engineer PHED Dn Nagaur
Tender fee, processing fee, EMD, tender document, regn certificate, experience certificate etc
2 documents required · 2 mandatory
₹2,000
Executive Engineer PHED Dn
₹1.2 L
Yes
27 Apr 2021
22 Mar 2021
16 Apr 2021
22 Mar 2021
15 Apr 2021
22 Mar 2021
22 Mar 2021 - 26 Mar 2021
eProcurement System Government of Rajasthan Created By: MADAN LAL MEENA Created Date/Time: 27-Apr-2021 06:01 PM Tender Title: Constt n Comm of borehole by DTH/Rot/Comb of 200mm supply n installation of energy eff. Sub. Pump sets n other allied works incl. comm n testing of TW under Distt.Sub Dn II Ngr with 2 year defect liability 3 year OnM after comp. of defect lia. period Tender ID: 2021_PHCJA_217555_1
Tender Inviting Authority: Superintending Engineer P.H.E.D. Circle Nagaur
Name of Work: Construction and Commissioning of bore hole by DTH/Rotary/ Combination rig of 200 mm dia, supply and installation of energy efficient Submersible Pump sets, Panels Cables and other allied works including commissioning and testing of tube well under PHED Distt Sub Dn. II Nagaur with 24 months defect liability, 3 years operation and maintenance after completion of defect liability period (ARC)
Contract No: NIT NO 98/2020-21
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 NEHRA ELECTRICALS & CONST.COMPANY(GSTN-08AALFN7776RIZ0) 3475992.00 -2.11 3402648.57 Thirty Four Lakh Two Thousand Six Hundred and Fourty Eight
2.00 M/s Mahadev Builders(GSTN-08AANFM9080B1Z3) 3475992.00 -3.71 3347032.70 Thirty Three Lakh Fourty Seven Thousand Thirty Two
3.00 M/s Shiv Drilling Company(GSTN-08AEAFS1261D1ZF) 3475992.00 -7.71 3207993.02 Thirty Two Lakh Seven Thousand Nine Hundred and Ninty Three
4.00 ADESH BORWELL AND ENGINEERING SERVICE(GSTN-NA) 3475992.00 -13.00 3024113.04 Thirty Lakh Twenty Four Thousand One Hundred and Thirteen
Lowest Amount Quoted BY: ADESH BORWELL AND ENGINEERING SERVICE(3024113.04)
BOQ Summary Details Tender Title: Constt n Comm of borehole by DTH/Rot/Comb of 200mm supply n installation of energy eff. Sub. Pump sets n other allied works incl. comm n testing of TW under Distt.Sub Dn II Ngr with 2 year defect liability 3 year OnM after comp. of defect lia. period Tender ID: 2021_PHCJA_217555_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 ADESH BORWELL AND ENGINEERING SERVICE 3024113.04 L1
2 M/s Shiv Drilling Company 3207993.02 L2
3 M/s Mahadev Builders 3347032.70 L3
4 NEHRA ELECTRICALS & CONST.COMPANY 3402648.57 L4
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .