| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.5 LAccepted-AOC 205 PARSHAV VIHAR PLOT NO 50 1 P EXTN PATPARGANJ DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹37.2 L+₹7.2 L (24.1%)Rejected-Finance | L2 | Rejected-Finance Being not lowest bidder |
| Sl No | Description | Qty | Unit | SANJEEV ENTERPRISES L1 | Continental Engineers and contractors L2 |
|---|---|---|---|---|---|
| 1.00 | Attending breakdown complaints in firefighting system comprising of Auto /Manual operational check of the following firefighting /fire hydrant system including related electrical control panel installed for the firefighting system for the location Old MLH/ARS-1 Hanger complete all as specified and as directed :-
(a) Centrifugal pump set of cap 90 KW make Kirloskar - 02 Nos
(b) Jockey pump set of cap 11 KW make Kirloskar - 01 No,
(c) Electical panel - 01 No
(d) Fire Hydrant with valve on both side -22 Nos,
(e) Sluice valve 250/200/150/100 mm - 27 Nos
(f) Pressure switch - 04 Nos,
(g) Pressure gauge - 05
(h) Hose cabinet - 31 Nos.
Note:-
(i) Any minor defect noticed during function l test (i.e.) making electrical connections into the electrical control panel, filling the graphite packing seal into the gland piece of centrifugal type firefighting pump, replacement of rubber flanged gaskets of size 250/150 mm /100 mm with necessary nuts bolts and washers if required to arrest the leakages etc to make the firefighting system functional shall deemed to be included in the quoted item rates.
(ii) Periodical serviceability /functional test for locations viz Old MLH/ARS-1 hanger shall be carried out in every month by station fire section . Record of the same shall be maintained and submitted to the Engr-in-Charge duly signed by contractor and his engineer including endorsement from Station fire section.
(iii) A recovery of double @ quoted rate shall be made against the contractor for not attending the complaints with in 24 Hrs
(iv) Any major unserviceable item related to firefighting system shall be measured and paid for separately under the respective item of schedule if required to be replaced for making the system serviceable. | 15 | Each Job | 5,000 ₹75,000 Lowest | 12,500 ₹1,87,500 |
| 2.00 | Attending breakdown complaints in firefighting system comprising of Manual operational check of the following firefighting /fire hydrant systemm including related electrical control panel installed for the firefighting system for the location Engine Division/site V and VII complete all as specified and as directed :-
(a) Centrifugal pump set of cap 15 HP - 01 Nos
(b) Centerifugal pump set 50 HP - 01 No
(c) Electical panel - 01 No
(d) Fire Hydrant with valve on both side -6 Nos
(e) Sluice valve 150/100 mm - 2 Nos
(f) Pressure gauge - 01
(g) Hose cabinet - 06 Nos
Note:
(i) Any minor defect noticed during function l test (i.e.) making electrical connections into the electrical control panel, filling the graphite packing seal into the gland piece of centrifugal type firefighting pump, replacement of rubber flanged gaskets of size 150 mm /100 mm with necessary nuts bolts and washers if required to arrest the leakages etc to make the firefighting system functional shall deemed to be included in the quoted item rates.
(ii) Periodical serviceability /functional test for locations viz Engineer Division shall be carried out in every month by station fire section . Record of the same shall be maintained and submitted to the Engr-in-Charge duly signed by contractor and his engineer including endorsement from Station fire section.
(iii)A recovery of double @ quoted rate shall be made against the contractor for not attending the complaints with in 24 Hrs
(iv) Any major unserviceable item related to firefighting system shall be measured and paid for separately under the respective item of schedule if required to be replaced for making the system serviceable. | 16 | Each Job | 5,000 ₹80,000 Lowest | 12,000 ₹1,92,000 |
| 3.00 | Attending breakdown complaints in firefighting system comprising of Auto /Manual operational check of the following firefighting /fire hydrant systemm including related electrical control panel installed for the firefighting system for the location Lean Lift building, complete all as specified and as directed :-
(a) Centrifugal pump set of cap 100 HP make Kirloskar - 01 Nos
(b) Centrifugal pump set 50 HP - 01 Nos,
(c) Centrifugal pump set 10 KW - 01 No
(d) Diesel Engine driven Pump set 38 KW - 01 No,
(e) Electical panel - 02 No
(f) Fire Hydrant with valve on both side -22 Nos
(g) Sluice valve 250/200/150/100 mm - 27 Nos
(h) Pressure switch - 04 Nos, (g) Pressure gauge - 05,
(j) Hose cabinet - 31 Nos
(k) water sprinkler - 161 Nos
Note:
(i) Any minor defect noticed during function l test (i.e.) making electrical connections into the electrical control panel, filling the graphite packing seal into the gland piece of centrifugal type firefighting pump, replacement of rubber flanged gaskets of size 250/150 mm /100 mm with necessary nuts bolts and washers if required to arrest the leakages etc to make the firefighting system functional shall deemed to be included in the quoted item rates.
(ii) Periodical serviceability /functional test for locations viz Lean lift building shall be carried out in every month by station fire section . Record of the same shall be maintained and submitted to the Engr-in-Charge duly signed by contractor and his engineer including endorsement from Station fire section. (iii)A recovery of double @ quoted rate shall be made against the contractor for not attending the complaints with in 24 Hrs
(iv) Any major unserviceable item related to firefighting system shall be measured and paid for separately under the respective item of schedule if required to be replaced for making the system serviceable. | 14 | Each Job | 5,000 ₹70,000 Lowest | 12,000 ₹1,68,000 |
| 4.00 | Attending breakdown complaints in firefighting system including foam flooding system comprising of Auto /Manual operational check of the following firefighting /fire hydrant systemm including related electrical control panel installed for the firefighting system for the location New MLH Upgrade hanger and IDS Lab complete all as specified and as directed :-
(a) Centrifugal pump set of cap 9000 LPM,75 Meter head (make Kirloskar - 02 Nos)
(b) Centrifugal pump set 70 Meter head,2850 LPM - 01 Nos,
(c) Centrifugal pump set 70 meter head,180 LPM - 01 No
(d) Diesel Engine driven Centrifugal pump set of cap 9000 LPM,75 Meter head (make Kirloskar - 02 Nos)
(e) Electical panel - 04 No
(f) Fire Hydrant with valve on both side -22 Nos
(e) Sluice valve 250/200/150/100 mm - 27 Nos
(f) Pressure switch - 06 Nos,
(g) Pressure gauge - 05,
(h) Hose cabinet - 21 Nos
(j) RRL hose - 42 Nos
(j) Hot foam generator 40 Cum/Min -180 Nos
(k) vertical foam bladder tank 2500 ltrs -02 Nos
(l) in line proportional TP TP100/50-2 Nos)
(m) deluge valve station of 250 mm dia -12 Nos
Note:
(i) Any minor defect noticed during function l test (i.e.) making electrical connections into the electrical control panel, filling the graphite packing seal into the gland piece of centrifugal type firefighting pump, replacement of rubber flanged gaskets of size 250/150 mm /100 mm with necessary nuts bolts and washers if required to arrest the leakages etc to make the firefighting system functional shall deemed to be included in the quoted item rates.
(ii) Periodical serviceability /functional test for locations viz New MLH Upgrade Hanger shall be carried out in every month by station fire section . Record of the same shall be maintained and submitted to the Engr-in-Charge duly signed by contractor and his engineer including endorsement from Station fire section.
(iii) A recovery of double @ quoted rate shall be made against the contractor for not attending the complaints with in 24 Hrs
(iv) Any major unserviceable item related to firefighting system/foam flooding system shall be measured and paid for separately under the respective item of schedule if required to be replaced for making the system serviceable. | 18 | Each Job | 5,000 ₹90,000 Lowest | 11,500 ₹2,07,000 |
| 5.00 | Supply and fix in repair brass female coupler for fire hydrand of size 63 mm complete all as specified and directed.
(Make :- MEC/NEWAGE/ATASEE/Mitras or any make approved in any command) | 12 | Each | 2,500 ₹30,000 Lowest | 2,500 ₹30,000 Lowest |
| 6.00 | Supply and fix in repair canvas hose 63 mm with brass male and female coupler 15 Mtr long conforming to IS-636 complete with male and female coupling conforming to IS-903 complete all as specified and directed.
(Make:- MEC/NEWAGE/ATASEE/Mitras or any make approved in any command). | 10 | Each | 4,500 ₹45,000 Lowest | 4,500 ₹45,000 Lowest |
| 7.00 | Supply and fix in repair pressure switch as per sample complete all as specified and as firected.
(Make: Danfos/ Honeywell/ Siemens) | 2 | Each | 1,850 ₹3,700 Lowest | 3,300 ₹6,600 |
| 8.00 | Supply only Branch pipe gun metal 63mm instantaneous inlet, made threaded outlet, 15mm bore nozzle short complete all as specified and directed.
(Make :- MEC/ NEWAGE/ATASEE/Mitras or any make approved in any command) | 5 | Each | 3,150 ₹15,750 Lowest | 3,150 ₹15,750 Lowest |
| 9.00 | Supply and fixing in replacement of cast iron sluice valve heavy duty class PN-1.6 conforming to IS 14846-2000 with flanged ends 150 mm nominal bore ISI marked complete with gun metal or stainless steel spindle and cast iron hand wheel including rubber /fiber board gasket nuts, washers etc, suitable for fire fighting pressurised pipe line including necessary excavation, returning and filling complete all as specified and directed .
(MAKE :- SANT/KIRLOSKER/UPDHAYA/BIR.) | 2 | Each | 8,850 ₹17,700 Lowest | 8,850 ₹17,700 Lowest |
| 10.00 | All as per item No 9.00 but for 200 mm dia. | 2 | Each | 11,500 ₹23,000 Lowest | 13,500 ₹27,000 |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
3 Apr 2026, 6:00 pmClosed
CWE (AF) TUGHLAKABAD
Headquarters CWE AF Tughlakabad, Air Force Station, Tughlakabad, PO Sangam Vihar, New Delhi 110 080
REPAIRS/MAINTENANCE INCL PERIODICAL TESTING OF FIRE FIGHTING INSTALLATIONS, CLEANING OF FIRE TANKS, REPAIR TO FIRE PUMPS AND REPLACEMENT OF UNSV FIRE HYDRANTS AND ACCESSORIES AT 3 BRD UNDER GE (AF) MC CHANDIGARH
2026_MES_756108_1
CWE/TKD/CHD/TOKEN-81 OF 2025-26
Open Tender
Miscellaneous Works
Item Rate
180 days
CHANDIGARH
As per NIT.
7 documents required · 7 mandatory
₹500
GE (AF) MC CHANDIGARH
₹70,000
Yes
21 Jul 2026
12 Mar 2026
6 Apr 2026
12 Mar 2026
3 Apr 2026
27 Mar 2026
13 Mar 2026 - 20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Attending breakdown complaints in firefighting system comprising of Auto /Manual operational check of the following firefighting /fire hydrant system including related electrical control panel installed for the firefighting system for the location Old MLH/ARS-1 Hanger complete all as specified and as directed :-
(a) Centrifugal pump set of cap 90 KW make Kirloskar - 02 Nos
(b) Jockey pump set of cap 11 KW make Kirloskar - 01 No,
(c) Electical panel - 01 No
(d) Fire Hydrant with valve on both side -22 Nos,
(e) Sluice valve 250/200/150/100 mm - 27 Nos
(f) Pressure switch - 04 Nos,
(g) Pressure gauge - 05
(h) Hose cabinet - 31 Nos.
Note:-
(i) Any minor defect noticed during function l test (i.e.) making electrical connections into the electrical control panel, filling the graphite packing seal into the gland piece of centrifugal type firefighting pump, replacement of rubber flanged gaskets of size 250/150 mm /100 mm with necessary nuts bolts and washers if required to arrest the leakages etc to make the firefighting system functional shall deemed to be included in the quoted item rates.
(ii) Periodical serviceability /functional test for locations viz Old MLH/ARS-1 hanger shall be carried out in every month by station fire section . Record of the same shall be maintained and submitted to the Engr-in-Charge duly signed by contractor and his engineer including endorsement from Station fire section.
(iii) A recovery of double @ quoted rate shall be made against the contractor for not attending the complaints with in 24 Hrs
(iv) Any major unserviceable item related to firefighting system shall be measured and paid for separately under the respective item of schedule if required to be replaced for making the system serviceable. | 15 | Each Job | - | - |
| - | Attending breakdown complaints in firefighting system comprising of Manual operational check of the following firefighting /fire hydrant systemm including related electrical control panel installed for the firefighting system for the location Engine Division/site V and VII complete all as specified and as directed :-
(a) Centrifugal pump set of cap 15 HP - 01 Nos
(b) Centerifugal pump set 50 HP - 01 No
(c) Electical panel - 01 No
(d) Fire Hydrant with valve on both side -6 Nos
(e) Sluice valve 150/100 mm - 2 Nos
(f) Pressure gauge - 01
(g) Hose cabinet - 06 Nos
Note:
(i) Any minor defect noticed during function l test (i.e.) making electrical connections into the electrical control panel, filling the graphite packing seal into the gland piece of centrifugal type firefighting pump, replacement of rubber flanged gaskets of size 150 mm /100 mm with necessary nuts bolts and washers if required to arrest the leakages etc to make the firefighting system functional shall deemed to be included in the quoted item rates.
(ii) Periodical serviceability /functional test for locations viz Engineer Division shall be carried out in every month by station fire section . Record of the same shall be maintained and submitted to the Engr-in-Charge duly signed by contractor and his engineer including endorsement from Station fire section.
(iii)A recovery of double @ quoted rate shall be made against the contractor for not attending the complaints with in 24 Hrs
(iv) Any major unserviceable item related to firefighting system shall be measured and paid for separately under the respective item of schedule if required to be replaced for making the system serviceable. | 16 | Each Job | - | - |
| - | Attending breakdown complaints in firefighting system comprising of Auto /Manual operational check of the following firefighting /fire hydrant systemm including related electrical control panel installed for the firefighting system for the location Lean Lift building, complete all as specified and as directed :-
(a) Centrifugal pump set of cap 100 HP make Kirloskar - 01 Nos
(b) Centrifugal pump set 50 HP - 01 Nos,
(c) Centrifugal pump set 10 KW - 01 No
(d) Diesel Engine driven Pump set 38 KW - 01 No,
(e) Electical panel - 02 No
(f) Fire Hydrant with valve on both side -22 Nos
(g) Sluice valve 250/200/150/100 mm - 27 Nos
(h) Pressure switch - 04 Nos, (g) Pressure gauge - 05,
(j) Hose cabinet - 31 Nos
(k) water sprinkler - 161 Nos
Note:
(i) Any minor defect noticed during function l test (i.e.) making electrical connections into the electrical control panel, filling the graphite packing seal into the gland piece of centrifugal type firefighting pump, replacement of rubber flanged gaskets of size 250/150 mm /100 mm with necessary nuts bolts and washers if required to arrest the leakages etc to make the firefighting system functional shall deemed to be included in the quoted item rates.
(ii) Periodical serviceability /functional test for locations viz Lean lift building shall be carried out in every month by station fire section . Record of the same shall be maintained and submitted to the Engr-in-Charge duly signed by contractor and his engineer including endorsement from Station fire section. (iii)A recovery of double @ quoted rate shall be made against the contractor for not attending the complaints with in 24 Hrs
(iv) Any major unserviceable item related to firefighting system shall be measured and paid for separately under the respective item of schedule if required to be replaced for making the system serviceable. | 14 | Each Job | - | - |
| - | Attending breakdown complaints in firefighting system including foam flooding system comprising of Auto /Manual operational check of the following firefighting /fire hydrant systemm including related electrical control panel installed for the firefighting system for the location New MLH Upgrade hanger and IDS Lab complete all as specified and as directed :-
(a) Centrifugal pump set of cap 9000 LPM,75 Meter head (make Kirloskar - 02 Nos)
(b) Centrifugal pump set 70 Meter head,2850 LPM - 01 Nos,
(c) Centrifugal pump set 70 meter head,180 LPM - 01 No
(d) Diesel Engine driven Centrifugal pump set of cap 9000 LPM,75 Meter head (make Kirloskar - 02 Nos)
(e) Electical panel - 04 No
(f) Fire Hydrant with valve on both side -22 Nos
(e) Sluice valve 250/200/150/100 mm - 27 Nos
(f) Pressure switch - 06 Nos,
(g) Pressure gauge - 05,
(h) Hose cabinet - 21 Nos
(j) RRL hose - 42 Nos
(j) Hot foam generator 40 Cum/Min -180 Nos
(k) vertical foam bladder tank 2500 ltrs -02 Nos
(l) in line proportional TP TP100/50-2 Nos)
(m) deluge valve station of 250 mm dia -12 Nos
Note:
(i) Any minor defect noticed during function l test (i.e.) making electrical connections into the electrical control panel, filling the graphite packing seal into the gland piece of centrifugal type firefighting pump, replacement of rubber flanged gaskets of size 250/150 mm /100 mm with necessary nuts bolts and washers if required to arrest the leakages etc to make the firefighting system functional shall deemed to be included in the quoted item rates.
(ii) Periodical serviceability /functional test for locations viz New MLH Upgrade Hanger shall be carried out in every month by station fire section . Record of the same shall be maintained and submitted to the Engr-in-Charge duly signed by contractor and his engineer including endorsement from Station fire section.
(iii) A recovery of double @ quoted rate shall be made against the contractor for not attending the complaints with in 24 Hrs
(iv) Any major unserviceable item related to firefighting system/foam flooding system shall be measured and paid for separately under the respective item of schedule if required to be replaced for making the system serviceable. | 18 | Each Job | - | - |
| - | Supply and fix in repair brass female coupler for fire hydrand of size 63 mm complete all as specified and directed.
(Make :- MEC/NEWAGE/ATASEE/Mitras or any make approved in any command) | 12 | Each | - | - |
| - | Supply and fix in repair canvas hose 63 mm with brass male and female coupler 15 Mtr long conforming to IS-636 complete with male and female coupling conforming to IS-903 complete all as specified and directed.
(Make:- MEC/NEWAGE/ATASEE/Mitras or any make approved in any command). | 10 | Each | - | - |
| - | Supply and fix in repair pressure switch as per sample complete all as specified and as firected.
(Make: Danfos/ Honeywell/ Siemens) | 2 | Each | - | - |
| - | Supply only Branch pipe gun metal 63mm instantaneous inlet, made threaded outlet, 15mm bore nozzle short complete all as specified and directed.
(Make :- MEC/ NEWAGE/ATASEE/Mitras or any make approved in any command) | 5 | Each | - | - |
| - | Supply and fixing in replacement of cast iron sluice valve heavy duty class PN-1.6 conforming to IS 14846-2000 with flanged ends 150 mm nominal bore ISI marked complete with gun metal or stainless steel spindle and cast iron hand wheel including rubber /fiber board gasket nuts, washers etc, suitable for fire fighting pressurised pipe line including necessary excavation, returning and filling complete all as specified and directed .
(MAKE :- SANT/KIRLOSKER/UPDHAYA/BIR.) | 2 | Each | - | - |
| - | All as per item No 9.00 but for 200 mm dia. | 2 | Each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_846939.xls
BOQ • 0.34 MB
CompleteTenderDocumets.pdf
Tender Documents • 2.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .