Tender Value
₹1.4 Cr
EMD Value
₹2.7 L
Closing Date
12 May 2026, 3:00 pmClosed
EE,RMD-2,DDA
EE,RMD-2,DDA
Construction of footpath, boundary walls, side slopes, fencing and other allied works around the water body (Nithari Lake) at Village Nithari, Delhi
2026_DDA_907655_1
03/EE/RMD-2/DDA/2026-27
Open Tender
Civil Works
Works
60 days
Rohini
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹2.7 L
20 May 2026
6 May 2026
13 May 2026
6 May 2026
12 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
(A) In cement mortar | - | cum | 683.2 | - |
| - | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-incharge.
All kinds of soil | - | cum | 177.5 | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
(1 Cement : 5 coarse sand (zone-lll) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | 6,518.6 | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:1.5:3 (1 Cement: 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 8,340.85 | - |
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level
1:1.5:3 (I cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 9,045.75 | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for | - | - | - | - |
| 6.1 | a) Foundations, footings, bases of columns, etc. for mass concrete. | - | sqm | 392.15 | - |
| 6.2 | b) Columns, Pillers, Piers, Abutements, Posts and Struts. | - | sqm | 961.3 | - |
| 6.3 | c) Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | sqm | 736.4 | - |
| 6.4 | d) Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | - | sqm | 842.5 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.42 MB
BOQ_954004.xls
BOQ • 0.34 MB
NIT03.pdf
Tender Documents • 2.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .