| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC DOOR NO 90 C1 AYYAMPERUMAL ST VIRUDHUNAGAR TOWN | ₹1.3 Cr | L1 | Accepted-AOC Quoted Lowest Value |
| 2 | L2₹1.3 CrRejected-AOC | ₹1.3 Cr | L2 | Rejected-AOC Rate Quoted Higher than L1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Bidder has not submitted the Experience Certificate. Hence the contractor was treated as failed |
| 4 | Rejected-Technical | - | - | Rejected-Technical Bidder has not submitted the IT and GST. Hence the contractor was treated as failed |
| Sl No | Description | Qty | Unit | G RAMESHKUMAR L3 | JJ INFRASTRUCTUREE L4 | S.MUNIASAMY L1 | M.KARTHIKEYAN L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Hire Charges for supplying and fixing in position M.S Steel framed fixed weldmesh grill using 35 x 35 x 6 mm angle of outer frame with 25 x 5 mm flats stiffeners welded horizontally and vertically in both direction and using 3"x 1" and 6 x 10 Gauge weldmesh with necessary locking facilities and hinges including cost of red oxide primer.(Inner,outer,Door Steel Barricading Arrangements) and removing the Same After Counting is over, for Maximum 30 days | 1,395.64 | M2 | 1,860 ₹26.0 L | 1,873 ₹26.1 L | 1,804 ₹25.2 L | 1,831 ₹25.6 L |
| 2.00 | Hire Charges for Supply and fixing in position fine wiremesh netting inclusive of cost of red oxide primer etc.,Complete Complying with standard specifications and removing the Same After Counting is over, for Maximum 30 days. | 56.4 | M2 | 1,949 ₹1.1 L | 1,965 ₹1.1 L | 1,892 ₹1.1 L | 1,921 ₹1.1 L |
| 3.00 | Hire Charges for Supplying and fixing Door grill including cost of fixing charges and fixing in original position etc., Complete Complying with standard specifications and removing the Same After Counting is over, for Maximum 30 days | 63.84 | M2 | 2,462 ₹1.6 L | 2,480 ₹1.6 L | 2,389 ₹1.5 L | 2,425 ₹1.5 L |
| 4.00 | Hire Charges for Supplying and fixing M.S plain sheet arrangements including cost of fixing charges and fixing in original position etc.,and removing the Same After Counting is over, for Maximum 30 days. | 179.52 | M2 | 1,728 ₹3.1 L | 1,741 ₹3.1 L | 1,677 ₹3.0 L | 1,702 ₹3.1 L |
| 5.00 | Hire Charges for Supplying and fixing of steel door with the following specification MS angels of size 40x40x6mm are used for the outer frames and M.S. angles of size 35x35x6mm for the shutter frames stiffeners with 32 x 6mm M.S flat is provided at required intervals in the shutter frame. 18-gauge C.R. sheet laid as panel in the shutter and welded intact. M.S. flat 18x5mm is welded over the 32 x 6mm M.S. flat sandwitching the C.R. sheet in between additional stiffeners with 18x5mm M.S. flat is provided diagonally at the rear side of the shutter, 3nos. of hinges in case of single leaf and 6nos. of hinges in double leaves shutter to be provided 6nos. of holdfasts 120 mm in length made of angle section spliced at the ends are welded to the outer frames of the door and removing the Same After Counting is over, for Maximum 30 days. | 17.64 | M2 | 4,924 ₹86,859.36 | 4,961 ₹87,512.04 | 4,777 ₹84,266.28 | 4,851 ₹85,571.64 |
| 6.00 | Hire Charges for Supplying and fixing the Adithandah for safety aspects. The rate includes the cost of materials and labour for providing safety arrangements with Adithandah for door including locking arrangements as directed by the departmental officers and removing the Same After Counting is over, for Maximum 30 days. | 182.4 | Kg | 502 ₹91,564.80 | 506 ₹92,294.40 | 487.5 ₹88,920 | 495 ₹90,288 |
| 7.00 | Hire Charges for Providing the ordinary plastic chair for the sitting area the rate include the Labour Charges for Loading and Unloading,cost of transportation, material etc., for Maximum 30 days. | 300 | Nos | 75 ₹22,500 | 76 ₹22,800 | 73 ₹21,900 | 74 ₹22,200 |
| 8.00 | Hire Charges for Providing the casurina props including earthwork of size 250 x 250 x 750 mm for the wooden post of size of 10cm dia. With height of 2.40m. In the vertical props with interval of 2.50m and horizontal props with 0.50m interval of three rows etc., The rate includes the fixing the props underneath the Ground surface, labour charges, material, removing, transportation etc.(outer Wooden Barricading Arrangements)and removing the Same After Counting is over, for Maximum 30 days. | 2,281.8 | Rm | 271 ₹6.2 L | 273 ₹6.2 L | 263 ₹6.0 L | 267 ₹6.1 L |
| 9.00 | Hire Charges for Providing the casurina props for the size of 10cm dia. With height of 2.40m. In the vertical props with interval of 1.00 m and horizontal props with 0.50m interval of three rows etc., The rate includes the fixing charges, labour, material, removing, transportation etc.(Inner Wooden Barricading Arrangements) and removing the Same After Counting is over, for Maximum 30 days. | 848.4 | Rm | 266 ₹2.3 L | 268 ₹2.3 L | 258 ₹2.2 L | 262 ₹2.2 L |
| 10.00 | Hire Charges for Cleaning the Scrub Jungle and Levelling the site with JCB Machinery.The Rate includes the Cleaning and levelling charges,Transportation,Driver Beta,etc., | 48 | Hours | 743 ₹35,664 | 750 ₹36,000 | 721 ₹34,608 | 732 ₹35,136 |
Tender Value
₹1.3 Cr
EMD Value
₹76,000
Closing Date
6 Apr 2026, 3:00 pmClosed
Superintending Engineer PWD Buildings Sivagangai
Superintending Engineer PWD Buildings C M Circle Sivagangai 630562
Providing Safety Arrangements for Strong Room, Storage Room, Counting Centre Barricading Arrangements in Anna University College of Engineering at Ramanathapuram In Ramanathapuram District for Tamilnadu Legislative Assembly Election-2026
2026_PWD_675342_1
42 SE Buildings C M Circle Sivagangai 2025 2026 dt 27 03 2026
Open Tender
Civil Works - Buildings
30 days
TamilNadu Election 2026 Ramanathapuram
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹76,000
15 May 2026
30 Mar 2026
6 Apr 2026
30 Mar 2026
6 Apr 2026
30 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Hire Charges for supplying and fixing in position M.S Steel framed fixed weldmesh grill using 35 x 35 x 6 mm angle of outer frame with 25 x 5 mm flats stiffeners welded horizontally and vertically in both direction and using 3"x 1" and 6 x 10 Gauge weldmesh with necessary locking facilities and hinges including cost of red oxide primer.(Inner,outer,Door Steel Barricading Arrangements) and removing the Same After Counting is over, for Maximum 30 days | ||||||
| 2 | Hire Charges for Supply and fixing in position fine wiremesh netting inclusive of cost of red oxide primer etc.,Complete Complying with standard specifications and removing the Same After Counting is over, for Maximum 30 days. | 1 | M2 | - | - | 2 |
| 3Hire Charges for Supplying and fixing Door grill including cost of fixing charges and fixing in original position etc., Complete Complying with standard specifications and removing the Same After Counting is over, for Maximum 30 days | ||||||
| 4Hire Charges for Supplying and fixing M.S plain sheet arrangements including cost of fixing charges and fixing in original position etc.,and removing the Same After Counting is over, for Maximum 30 days. | ||||||
| 5Hire Charges for Supplying and fixing of steel door with the following specification MS angels of size 40x40x6mm are used for the outer frames and M.S. angles of size 35x35x6mm for the shutter frames stiffeners with 32 x 6mm M.S flat is provided at required intervals in the shutter frame. 18-gauge C.R. sheet laid as panel in the shutter and welded intact. M.S. flat 18x5mm is welded over the 32 x 6mm M.S. flat sandwitching the C.R. sheet in between additional stiffeners with 18x5mm M.S. flat is provided diagonally at the rear side of the shutter, 3nos. of hinges in case of single leaf and 6nos. of hinges in double leaves shutter to be provided 6nos. of holdfasts 120 mm in length made of angle section spliced at the ends are welded to the outer frames of the door and removing the Same After Counting is over, for Maximum 30 days. | ||||||
| 6Hire Charges for Supplying and fixing the Adithandah for safety aspects. The rate includes the cost of materials and labour for providing safety arrangements with Adithandah for door including locking arrangements as directed by the departmental officers and removing the Same After Counting is over, for Maximum 30 days. | ||||||
| 7Hire Charges for Providing the ordinary plastic chair for the sitting area the rate include the Labour Charges for Loading and Unloading,cost of transportation, material etc., for Maximum 30 days. | ||||||
| 8Hire Charges for Providing the casurina props including earthwork of size 250 x 250 x 750 mm for the wooden post of size of 10cm dia. With height of 2.40m. In the vertical props with interval of 2.50m and horizontal props with 0.50m interval of three rows etc., The rate includes the fixing the props underneath the Ground surface, labour charges, material, removing, transportation etc.(outer Wooden Barricading Arrangements)and removing the Same After Counting is over, for Maximum 30 days. | ||||||
| 9 | Hire Charges for Providing the casurina props for the size of 10cm dia. With height of 2.40m. In the vertical props with interval of 1.00 m and horizontal props with 0.50m interval of three rows etc., The rate includes the fixing charges, labour, material, removing, transportation etc.(Inner Wooden Barricading Arrangements) and removing the Same After Counting is over, for Maximum 30 days. | 1 | Rm | - | - | 9 |
| 10Hire Charges for Cleaning the Scrub Jungle and Levelling the site with JCB Machinery.The Rate includes the Cleaning and levelling charges,Transportation,Driver Beta,etc., | ||||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
TenderConElectionWorkRamanathapuram.pdf
Tender Documents • 0.71 MB
BOQ_811696.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid