Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹8 L
Closing Date
2 May 2026, 6:00 pmClosed
Commanding Officer
18 Engineer Regiment
Supply and construction of Amn Bkr small as per RFP documents
2026_ARMY_760618_1
6346/26-27
Open Tender
Civil Works
Item Wise
120 days
Batalik
As per tender documents
3 documents required · 3 mandatory
₹1,000
Yes
Payable To
₹8 L
Yes
16 Apr 2026
16 Apr 2026
4 May 2026
16 Apr 2026
2 May 2026
27 Apr 2026
16 Apr 2026 - 22 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | The work consists supply and construction of Small UG Amn Bunker (Precast) of size 7.00 x 3.60, with 750mm OHP (earth used for filling should be free from boulders). The clear ht of structure measured above floor level upto roof is 3.60m.
Note :- All materials make list attached in RFP for ref .Vendor Should provide raw material assurance certificate of all items.
2. Design Data (Pre-Cast One Box)-
2.1 Length - 1.0 mtr Minimum (External dimensions)
2.2 Width - 3.6 mtr (inner dimensions)
2.3 Height - 3.6 mtr (inner dimensions)
3. Design criteria.
3.1 Seismic Co-efficient – As per Seismic Zone V.
3.2 Snow load - 1.5 feet standing on roof.
3.3 Wind load - Equivalent to wind speed of 55 mtrs/sec as per IS-875- 2015(reaff- 2020)
3.4 Roof slope - As per Drawing attached.
3.5 External temperature – (-) 400C to + 350C.
3.6 Water absorption/Penetration – Nil and adequate sealing material be provided.
3.7 Termite proofing – Termite proof.
3.8 Ease of construction – Should be modular in design.
3.9 Design load – As per IS 875-2015 (reaff 2020).
4. Excavation. Excavation upto required level to be done by vendor in any type of soil i.e. hard rock / soft rock / hard dense / dense etc as directed by Accepting officer. The contractor will deploy his own resources for digging and levelling of ground. The excavated earth will be disposed off as directed by the Accepting Officer at an appropriate site as governed by local Adm guidelines or as directed by the Accepting Officer. Nos 01
Levelling: - Before excavation for foundation, top surface area of GL will be made levelled over truly rammed earth etc as per technical specification and drawing attached at tender documents. | - | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
RFP.pdf
Tender Documents • 1.30 MB
BOQ_851996.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .