Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹7.3 L
EMD Value
₹7,280
Closing Date
29 Jul 2020, 4:00 pmClosed
EXECUTIVE ENGINEER CONSTRUCTION DIVISION IV Jammu
Directorate of Samagra Shiksha, Channi Rama, Jammu
CONSTRUCTION OF 1 ADDITIONAL CLASS ROOM IN GOVT GIRLS MIDDLE SCHOOL NAKKA KOTE (ZONE BALAKOTE) DISTRICT POONCH
2020_RMSA_100924_1
E NIT No. 02 of 2020-21 Div IV
Open Tender
Civil Works
Fixed-rate
90 days
CONSTRUCTION OF 1 ADDITIONAL CLASS ROOM IN GOVT GI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EXECUTIVE ENGINEER CONSTRUCTION DIVISION IV Jammu
₹7,280
10 Sept 2020
21 Jul 2020
30 Jul 2020
21 Jul 2020
29 Jul 2020
21 Jul 2020
21 Jul 2020 - 29 Jul 2020
Amount
Earth work in excavation by manual means over areas (Exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All works up to plinth level in 1:5:10 (1 cement:5 coarse sand:10 graded stone aggregate with 40mm nominal size) Crushed.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level in 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) crushed.
Damping/filling of stone including cost of stones in horizontal on level.(Available at site)
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering. shuttering, finishing and reinforcement-All work upto plinth level 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size)
Brick work with common burnt clay F.P.S.(non-modualar) bricks of class designation 75 in foundation and plinth in Cement mortar 1 :6 ( 1 cement : 6 coarse sand) & Extra for brick work in superstructure above plinth level upto floor V level. (By manual means)
Providing and laying Reinforced Cement Concrete 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) in suspended floors, balconies, landings and staircase having upto 15°slope. excluding cost of centering and shuttering , all work upto floor V level
Reinforcement for RCC work including straightening cutting, bending, placing in position & binding all complete with TMT bars.
Centring and Shuttering including strutting, propping etc and removal of form work for Foundations: footings, bases of columns etc. for mass concrete.
Centring and Shuttering including strutting, propping etc and removal of form work for Suspended floors, roofs, landings, balconies and access platform
Centring and Shuttering including strutting, propping etc and removal of form work for Lintels, beams, plinth beams, girders, bressumers and centilevers.
Centring and Shuttering including strutting, propping etc and removal of form work for Edges of Slabs and Break in floors and walls (Under 20 cms wide)
Structural steel work welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc including priming coat with approved steel primer all complete. Fixed to steel windows by welding
6 mm Cement plaster to ceiling of mix 1 : 3 ( 1 cement : 3 fine sand)
12mm cement plaster of mix 1:6 (1 cement : 6 fine sand)
15mm Cement plaster on the rough side of single or half brick wall of mix 1 : 6 ( 1 cement : 6 fine sand)
Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows including lSI marked M.S. pressed Butt hinges bright finished of required size with necessary screws excluding panelling which will be paid for separately,all complete as per direction of engineer- in charge.First class kail wood
Providing and fixing glazed shutters for doors, windows and clerestory windows using 10kg/sqm (4mm thick) float glass panes including lSI marked M.S. pressed butt hinges bright finished of required size with necessary screws. 35mm thick First class kail wood
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) Crushed .
Cement concrete Flooring in 1:2:4 (1 cement : 2 coarse sand: 4 Graded Stone aggregate) finishing with floating coat of neat cement including cement slurry but excluding the cost of nosing of steps etc. compete. 50 mm thick 20 mm nominal size stone aggregate Crushed.
Providing and fixing glass strips in joints of terrazo/cement concrete floor.40 mm wide and 4 mm thick
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work
Distempering with 1st quality acrylic washable distemper (ready made) of approved manufacturer and of required shade/ colour complete as per manufacturer's specifications Two or more coats on new work
Finishing walls with water proofing cement paint of required shade New work (two or more coats) applied @3.84 kg/10sqm
Providing & fixing electric points complete in all respect as per necessary as site.
Carriage of materials by mechanical transport including loading /unloading and stacking complete. Sand lead up to 40 kms.
Carriage of materials by mechanical transport including loading/ unloading and stacking complete. Stone aggregate lead up to 40 kms.
Carriage of materials by mechanical transport including loading / unloading and stacking complete. Bricks lead up to 190 kms.
Carriage of materials by manual labour including loading/unloading and stacking complete for lead of 2 km Sand.
Carriage of materials by manual labour including loading/unloading and stacking complete for lead of 2 km Stone aggregate.
Carriage of materials by manual labour including loading/unloading and stacking complete for lead of 2 km Bricks
MS Sky Line Construction group Mendhar
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .