Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.3 LAccepted-AOC M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹20.3 L | L1 | Accepted-AOC Lowest 1 |
| 2 | L2₹20.6 LRejected-AOC 1 A K CONSTRUCTION KAKORI LUCKNOW KAKORI LUCKNOW UTTAR PRADESH 226101 | LUCKNOW | UTTAR PRADESH | 226101 | ₹20.6 L | L2 | Rejected-AOC Lowest 2 |
| 3 | L3₹22.9 LRejected-AOC | ₹22.9 L | L3 | Rejected-AOC Lowest 3 |
| 4 | L4₹27.1 LRejected-AOC GRAM PO DUDHI SONBHADRA U P | ₹27.1 L | L4 | Rejected-AOC Lowest 4 |
| Sl No | Description | Qty | Unit | a.k. construction L2 | PANKAJ KUMAR GUPTA L4 | PANDEY ENTERPRISES L3 | M/S BADRI SINGH L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation in all types of soil mixed with Charri, Bajari, Kankar, Soft rock, Hard rocks etc. including wet earth work with slush with all lead and lift including back filling and disposal of surplus excavated earth including cost of carriage of all materials labours T&P taxes etc. for proper completion of work. | 837.39 | cum | 250 ₹2.1 L | 505 ₹4.2 L | 230 ₹1.9 L | 300 ₹2.5 L |
| 2.00 | Cement concrete in M-15 (1:2:4.) in foundation of barrel, wing wall, Toe wall with cement, coarse sand (F.M. 2.20 or more) and stone ballast 10mm to 20 size excluding reinforcement and centering and shuttering including cost and carriage of all materials, lead and lift labour T&P etc. for proper completion of work. | 45.36 | cum | 6,000 ₹2.7 L | 6,641 ₹3.0 L | 5,000 ₹2.3 L | 6,000 ₹2.7 L |
| 3.00 | Reinforced cement concrete in barrel, face wall, wing wall & return wall in M-25 (1:1:2) with cement approved coarse sand (F.M.-25 or more) and stone ballast 10mm to 20mm size excluding rinforcement centering and shuttering including cost and carriage of all materials, lead and lift labour T&P etc. for proper completion of work. | 38.17 | cum | 8,000 ₹3.1 L | 9,180 ₹3.5 L | 6,000 ₹2.3 L | 8,000 ₹3.1 L |
| 4.00 | Centering & shuttering for plain C.C. works including cost and carriage of all materials, labour, T&P etc. required for proper completion of work. | 84.36 | sqm | 150 ₹12,654 | 224 ₹18,896.64 | 225 ₹18,981 | 150 ₹12,654 |
| 5.00 | Centering & shuttering for plain R.C.C. works including cost and carriage of all materials, labour, T&P etc. required for proper completion of work. | 148.05 | sqm | 300 ₹44,415 | 619 ₹91,642.95 | 620 ₹91,791 | 500 ₹74,025 |
| 6.00 | Reinforcement including straightening, cutting, bending, binding & placing including cost of binding wire, materials, labours carriage T&P and taxes etc. for proper completion of work. | 4.49 | MT | 70,000 ₹3.1 L | 70,350 ₹3.2 L | 70,350.67 ₹3.2 L | 40,000 ₹1.8 L |
| 7.00 | Providing and fixing PVC water stop seal 230 mm. wide including cost of seal, labours, T&P taxes etc. required for proper completion of the work. | 10.6 | RM | 600 ₹6,360 | 707 ₹7,494.20 | 709 ₹7,515.40 | 500 ₹5,300 |
| 8.00 | Providing and Laying local coarse sand around the barrel and in filter below C.C block including cost of all materials, labours, T&P etc. required for proper completion of work. | 18.04 | cum | 1,010 ₹18,216.36 | 1,507 ₹27,180.25 | 1,423.28 ₹25,670.28 | 1,000 ₹18,036 |
| 9.00 | Earth Work in filling including all labours, T&P Taxes etc. for proper completion of the work | 1,042.02 | cum | 200 ₹2.1 L | 257 ₹2.7 L | 260 ₹2.7 L | 150 ₹1.6 L |
| 10.00 | Providing and Laying graded crushed hard stone grit 4.75mm to 20 mm size in filter including cost of all materials, labour, T& P etc. required for proper completion of work. | 32.84 | cum | 2,020 ₹66,336.80 | 2,788 ₹91,557.92 | 2,789.42 ₹91,604.55 | 2,400 ₹78,816 |
Tender Value
Refer Docs
EMD Value
₹55,000
Closing Date
25 Nov 2025, 3:00 pmClosed
Executive Engineer
KCD-2 PIPRI SONBHADRA
Construction of Head regulator of Bairiyakhad Minor at km 26.800 of RKC
2025_UPIDC_1091391_1
07/EE/2025-26/LOT-2
Open Tender
Civil Works
90 days
Village Bairiyakhad Duddhi
Please refer Tender documents
2 documents required · 2 mandatory
₹1,180
₹55,000
1 Apr 2026
17 Nov 2025
25 Nov 2025
17 Nov 2025
25 Nov 2025
17 Nov 2025
Amount
Earth work in excavation in foundation in all types of soil mixed with Charri, Bajari, Kankar, Soft rock, Hard rocks etc. including wet earth work with slush with all lead and lift including back filling and disposal of surplus excavated earth including cost of carriage of all materials labours T&P taxes etc. for proper completion of work.
Cement concrete in M-15 (1:2:4.) in foundation of barrel, wing wall, Toe wall with cement, coarse sand (F.M. 2.20 or more) and stone ballast 10mm to 20 size excluding reinforcement and centering and shuttering including cost and carriage of all materials, lead and lift labour T&P etc. for proper completion of work.
Reinforced cement concrete in barrel, face wall, wing wall & return wall in M-25 (1:1:2) with cement approved coarse sand (F.M.-25 or more) and stone ballast 10mm to 20mm size excluding rinforcement centering and shuttering including cost and carriage of all materials, lead and lift labour T&P etc. for proper completion of work.
Centering & shuttering for plain C.C. works including cost and carriage of all materials, labour, T&P etc. required for proper completion of work.
Centering & shuttering for plain R.C.C. works including cost and carriage of all materials, labour, T&P etc. required for proper completion of work.
Reinforcement including straightening, cutting, bending, binding & placing including cost of binding wire, materials, labours carriage T&P and taxes etc. for proper completion of work.
Providing and fixing PVC water stop seal 230 mm. wide including cost of seal, labours, T&P taxes etc. required for proper completion of the work.
Providing and Laying local coarse sand around the barrel and in filter below C.C block including cost of all materials, labours, T&P etc. required for proper completion of work.
Earth Work in filling including all labours, T&P Taxes etc. for proper completion of the work
Providing and Laying graded crushed hard stone grit 4.75mm to 20 mm size in filter including cost of all materials, labour, T& P etc. required for proper completion of work.
Providing and Laying graded crushed hard stone grit 20mm to 40 mm size in filter including cost of all materials, labour, T& P etc. required for proper completion of work.
Providing & fixing 100mm dia P.V.C. pipe including cost of all material, labour and T&P etc. required for proper completion of work.
Providing and Laying stone boulder (weight 25Kg. to60kg) for pitching in launching apron side pitching, bed pitching including cost of all materials, labours, T&P taxes etc. required for proper completion of the work.
Random rubble stone masonery in 1:4 cement (OPC 43 grade) and sand mortar including all leads and lift, cost of soil, labour charges, manual compaction and T&P etc. for Proper Completion of work.
Raised pointing work for exposed surface of stone masonry in 1:2cm with cement OPC-43 grade, sand etc. including all leads and lift, cost of soil, labour charges, manual compaction and T&P etc. for Proper Completion of work.
Dewatering of Foundation hiring diesel pump 5 HP including operator cost, cost of dewatering equipment and its accessories, labour etc. required for proper completion of work.
Providing and fixing of steel gate in position in structure includin cost of all material,labour and T&P etc requred for proper completion of work
a.k. construction (BID ID -5689985)
PANDEY ENTERPRISES (BID ID -5702030)
PANKAJ KUMAR GUPTA (BID ID -5695322)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Tenderl2.pdf
Tender Documents • 0.68 MB
BOQ_2004839.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid