Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.7 LAccepted-AOC MADURAI | ₹60.7 L | L1 | Accepted-AOC Admit |
| 2 | L2₹62.0 LRejected-Finance | ₹62.0 L | L2 | Rejected-Finance L2 bid Rank |
| Sl No | Description | Qty | Unit | sribalajibuilders L1 | SRI EZHUMALAIYAN CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00MRL03-Pondy Adirangam Road Km.0/0-3/177 | |||||
| 2.00Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content | |||||
| 3.00 | Km 0/0 - 1/0 | 45 | Cum | 1,257 ₹56,565 | 1,300 ₹58,500 |
| 4.00 | Km 1/0 -2/0 | 45 | Cum | 1,265 ₹56,925 | 1,300 ₹58,500 |
| 5.00 | km 2/0-3/0 | 45 | Cum | 1,272 ₹57,240 | 1,300 ₹58,500 |
| 6.00 | Km 3/0 - 3/177 | 7.97 | Cum | 1,273 ₹10,145.81 | 1,300 ₹10,361 |
| 7.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | |||||
| 8.00 | Km 0/0 - 1/0 | 9.62 | Cum | 5,424 ₹52,178.88 | 5,500 ₹52,910 |
| 9.00 | Km 1/0 -2/0 | 9.24 | Cum | 5,431 ₹50,182.44 | 5,500 ₹50,820 |
| 10.00 | km 2/0-3/0 | 8.26 | Cum | 5,438 ₹44,917.88 | 5,500 ₹45,430 |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
14 Jul 2025, 3:00 pmClosed
Additional Collector(Dev)/Project Director
1st floor, DRDA, Collectorate campus, Tiruvarur
Periodic Renewal of PMGSY Road From MRL03-Pondy Adirangam Road Km.0/0-3/177 in Muthupet Block,Year 2024-25 OLD PACKAGE NO TN-21-191
2025_RDTN_142813_1
DIPR/3464/Tender/2025 dated 06.07.2025 tn21191
Open Tender
Civil Works - Roads
120 days
Muthupet
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.2 L
1st floor, DRDA, Collectorate campus, Tiruvarur
13 May 2026
7 Jul 2025
14 Jul 2025
7 Jul 2025
14 Jul 2025
7 Jul 2025
9 Jul 2025
Amount
MRL03-Pondy Adirangam Road Km.0/0-3/177
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Applying tack coat over WBM surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as pe
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Proviosion for KM stone
Provision for HM stone
Provision for Name board (repair)
Provision for Citizen information Board(repair)
Provision for Logo Boards
Provision for sign Boards
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above RENEWAL & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SRI EZHUMALAIYAN CONSTRUCTION (BID ID -623233)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Technical_doc_191.pdf
Tender Documents • 2.57 MB
BOQ_221993.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid