| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.9 L+₹475 (0.25%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NIRASHA CONTRACTOR AND SUPPLIERS L1 | PADAM SINGH L2 |
|---|---|---|---|---|---|
| 1.00 | Cleaning thick bushes and thorny jungle without uprooting.. | 9,500 | sqm | 3.95 ₹37,525 Lowest | 4 ₹38,000 |
| 2.00 | Earth work in silt clearance including lift up to 1.5 m. and lead up to 30 m. by manual labour or machine. The earth from clearance to be used in side embankment or to be disposed off on spoil banks | 237 | cum | 59 ₹13,983 Lowest | 59 ₹13,983 Lowest |
| 3.00 | Scraping internal section of existing channel including bed & slope with silt upto 5.00 c.m. | 19,500 | sqm | 4 ₹78,000 Lowest | 4 ₹78,000 Lowest |
| 4.00 | Earth work in silt clearance with slush and lehel including lift up to 1.5 m. and lead up to 30 m. by manual labour or machine. The slush from clearance to be disposed from away site as directed by Engineer - in - Charge. | 264 | cum | 102 ₹26,928 Lowest | 102 ₹26,928 Lowest |
| 5.00 | Extra for lead of slush or lehel, beyond 30M and up to a total lead of 200 M. | 264 | cum | 130 ₹34,320 Lowest | 130 ₹34,320 Lowest |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
30 Sept 2026, 3:00 pmClosed
EXECUTIVE ENGNEER
IRRIGATION DIVISION FIROZABAD
Earthwork in silt clearence /scraping of internal section of Sihori minor km 0.00 to km 3.00 ,Raipur minor km 0.00 to km 1.56, Paindapur minor km 0.00 to 3.700 and Malamai minor from km 0.00 to km 1.600.
2026_UPIDC_1188447_25
05/EE/2026-27
Open Tender
Civil Works
Item Wise
25 days
Earthwork in silt clearence /scraping of internal
Please refer Tender documents.
2 documents required · 2 mandatory
₹856
₹4,000
8 Oct 2026
23 Sept 2026
30 Sept 2026
23 Sept 2026
30 Sept 2026
23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning thick bushes and thorny jungle without uprooting.. | 9,500 | sqm | - | - |
| 2 | Earth work in silt clearance including lift up to 1.5 m. and lead up to 30 m. by manual labour or machine. The earth from clearance to be used in side embankment or to be disposed off on spoil banks | 237 | cum | - | - |
| 3 | Scraping internal section of existing channel including bed & slope with silt upto 5.00 c.m. | 19,500 | sqm | - | - |
| 4 | Earth work in silt clearance with slush and lehel including lift up to 1.5 m. and lead up to 30 m. by manual labour or machine. The slush from clearance to be disposed from away site as directed by Engineer - in - Charge. | 264 | cum | - | - |
| 5 | Extra for lead of slush or lehel, beyond 30M and up to a total lead of 200 M. | 264 | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.71 MB
BOQ_2239763.xls
BOQ • 0.29 MB
TimeExtend05.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .