Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹1.2 CrAccepted-Finance | l1 | Accepted-Finance Accepted | |
| 2 | l2₹1.4 Cr+₹20.8 L (17.2%)Accepted-Finance | l2 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | TDR and Co H1 | G Ravichandran H2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water, shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevent standard specification for DRESSING THE BED UPTO SILL LEVEL. | 169.6 | CuM | 200 ₹33,920 | 131 ₹22,217.6 Lowest |
| 2.00 | Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification forFoundation under Abutments & Return Walls and Piers / Pile cap under Abutments & Return Walls and Piers. | 226.96 | CuM | 500 ₹1,13,480 | 472.5 ₹1,07,238.6 Lowest |
| 3.00 | Earth work Excavation in soft rock not requiring blasting and depositing on bank with all leads and lifts including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation under Abutments & Return Walls and Piers / Pile cap under Abutments & Return Walls and Piers. | 151.31 | CuM | 700 ₹1,05,917 | 601 ₹90,937.31 Lowest |
| 4.00 | Plain Cement concrete M10 Grade using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site and cost of cement at site, including soft water, labour charges for mixing transporting, laying, compacting, curing concrete, Hire charges for Tools and plants and all incidental charges such as bailing out water, maintaining protective bunds, cofferdams, shoring etc., complete for LEVELLING COURSE BELOW FOUNDATION | 15.14 | CuM | 6,000 ₹90,840 | 5,560 ₹84,178.4 Lowest |
| 5.00 | Vibrated Cement concrete of grade M20 (Nominal mix) using 40mm ISS HBG granite metal including cost and conveyance of all materials to site including cement at site, including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, worikingat depths, Hire charges for Tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc, complete as per relevent standard specification for Footing of Abutments, Return Walls and Piers / Cutoff Wall / Raft (BELOW SILL). | 370.03 | CuM | 9,000 ₹33,30,270 | 8,426 ₹31,17,872.78 Lowest |
| 6.00 | Vibrated Cement concrete of grade M15/M20 (Nominal mix) using 40mm ISS HBG granite metal including cost and conveyance of all materials to site including cement at site, including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, worikingat depths, Hire charges for Tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc, complete as per relevent standard specification for Substructure of Abutments & Return Walls / Wing Wall / BODY WALL (BELOW SILL / ABOVE SILL). | 132.56 | CuM | 11,000 ₹14,58,160 | 10,553 ₹13,98,905.68 Lowest |
| 7.00 | Vibrated Reinforced Cement Concrete of grade M25/M30/M35 (Design mix) using 20mm and below ISS HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for Hire charges for Tools and plants including all other incidental charges etc. complete for Bed block cum Dirtwall Over Abutments. | 7.44 | CuM | 24,283 ₹1,80,665.52 | 14,283 ₹1,06,265.52 Lowest |
| 8.00 | Providing and fixing Class I PVC seepage pipes of 100 dia of required lengths for abutments and return walls / Side Walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain from the backfill as per section 2706 of MORTH specification (Rev- V) | 52 | Rm | 300 ₹15,600 | 284 ₹14,768 Lowest |
| 9.00 | Vibrated Reinforced cement concrete of grade M30/M35 (Design mix) using 20mm and below HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for Hire charges for Tools and plants including all other incidental charges etc., complete for Solid Deck Slab / T Beam and Cross girders / Deck Slab, Kerb & Footpath. | 137.1 | CuM | 22,330 ₹30,61,443 | 12,330 ₹16,90,443 Lowest |
| 10.00 | Providing and fixing PVC EXPANSION JOINT 20mm thickness with approved type of PVC water stopper of 300mm width over abutments and piers in 20mm gap between deck slabs as shown in the drawing including cost and conveyance of expansion joints including expansion joint filler and joint sealant etc, complete. as per section 2600 of MoRT&(H) specifications (fifth revision) | 25.2 | Rm | 750 ₹18,900 | 699 ₹17,614.8 Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
5 Mar 2026, 3:00 pmClosed
COMMISSIONER TINDIVANAM MUNICIPALITY
COMMISSIONER TINDIVANAM MUNICIPALITY
RECONSTRUCTION OF BRIDGE AT NAGALAPURAM WARD NO 26 IN TINDIVANAM MUNICIPALITY
2026_MAWS_668641_1
ROC.NO3489/2024/E1
Open Tender
Civil Works
Works
TINDIVANAM MUNICIPALITY
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.3 L
Yes
TINDIVANAM MUNICIPALITY
9 Apr 2026
1 Mar 2026
5 Mar 2026
1 Mar 2026
5 Mar 2026
1 Mar 2026
1 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water, shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevent standard specification for DRESSING THE BED UPTO SILL LEVEL. | 169.6 | CuM | 1 | ₹169.6 |
| 2 | Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification forFoundation under Abutments & Return Walls and Piers / Pile cap under Abutments & Return Walls and Piers. | 226.96 | CuM | 1 | ₹226.96 |
| 3 | Earth work Excavation in soft rock not requiring blasting and depositing on bank with all leads and lifts including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation under Abutments & Return Walls and Piers / Pile cap under Abutments & Return Walls and Piers. | 151.31 | CuM | 1 | ₹151.31 |
| 4 | Plain Cement concrete M10 Grade using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site and cost of cement at site, including soft water, labour charges for mixing transporting, laying, compacting, curing concrete, Hire charges for Tools and plants and all incidental charges such as bailing out water, maintaining protective bunds, cofferdams, shoring etc., complete for LEVELLING COURSE BELOW FOUNDATION | 15.14 | CuM | 1 | ₹15.14 |
| 5 | Vibrated Cement concrete of grade M20 (Nominal mix) using 40mm ISS HBG granite metal including cost and conveyance of all materials to site including cement at site, including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, worikingat depths, Hire charges for Tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc, complete as per relevent standard specification for Footing of Abutments, Return Walls and Piers / Cutoff Wall / Raft (BELOW SILL). | 370.03 | CuM | 1 | ₹370.03 |
| 6 | Vibrated Cement concrete of grade M15/M20 (Nominal mix) using 40mm ISS HBG granite metal including cost and conveyance of all materials to site including cement at site, including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, worikingat depths, Hire charges for Tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc, complete as per relevent standard specification for Substructure of Abutments & Return Walls / Wing Wall / BODY WALL (BELOW SILL / ABOVE SILL). | 132.56 | CuM | 1 | ₹132.56 |
| 7 | Vibrated Reinforced Cement Concrete of grade M25/M30/M35 (Design mix) using 20mm and below ISS HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for Hire charges for Tools and plants including all other incidental charges etc. complete for Bed block cum Dirtwall Over Abutments. | 7.44 | CuM | 1 | ₹7.44 |
| 8 | Providing and fixing Class I PVC seepage pipes of 100 dia of required lengths for abutments and return walls / Side Walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain from the backfill as per section 2706 of MORTH specification (Rev- V) | 52 | Rm | 1 | ₹52 |
| 9 | Vibrated Reinforced cement concrete of grade M30/M35 (Design mix) using 20mm and below HBG metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for Hire charges for Tools and plants including all other incidental charges etc., complete for Solid Deck Slab / T Beam and Cross girders / Deck Slab, Kerb & Footpath. | 137.1 | CuM | 1 | ₹137.1 |
| 10 | Providing and fixing PVC EXPANSION JOINT 20mm thickness with approved type of PVC water stopper of 300mm width over abutments and piers in 20mm gap between deck slabs as shown in the drawing including cost and conveyance of expansion joints including expansion joint filler and joint sealant etc, complete. as per section 2600 of MoRT&(H) specifications (fifth revision) | 25.2 | Rm | 1 | ₹25.2 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
Tendernotice_2.pdf
PDF • 1.11 MB
BOQ_803346.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .