Loading…
Loading…
Tender Value
₹63.8 L
EMD Value
₹1.3 L
Closing Date
2 Jan 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
EL/MTC
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.
Eligibility Criteria as per GCC-2022 of works, Part-1, para10 Definition Of Similar Work : - Execution of internal and/or external HT/LT electrification works for industrial buildings, workshops, substations or similar facilities, including Supply, Installation, Testing and Commissioning of Air Insulated Bus Trunking / Bus Ducts / Down Shop Lead (DSL) systems and associated power distribution electrical works."
3 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Contractor has to submit a copy of valid Electrical Contractor License for carrying out installation work of voltage class involved, issued by any State/Central Government along with a supervisor competency certificate and a person holding a permit (Wireman etc.) as per Regulation 29 of the Central Electricity Authority (Measure relating to Safety and Electric Supply) Regulation 2010 or latest / as per Rules 45 of the Indian Electricity Rules 1956 along with the tender documents, failing which the offer is liable to be rejected.
Air insulated distribution type Bus Trunking of 04 Pole (03 phase 4 wire system) capacity 250 amp. For Bogie Shop in RCF Workshop Kapurthala.
RCF-EL-MTC-77AA-ET-25-26~RCF
RCF-EL-MTC-77AA-ET-25-26
Open
Works - General
180 Days
Kapurthala, Punjab
₹0
₹1.3 L
2 Jan 2026
11 Dec 2025
19 Dec 2025
13 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 63,79,489.46 | ||
| — | 598.00 | — | — | ||
| Supply of Compact air insulated distribution type Bus Trunking of 04 Pole (03 phase 4 wire system) capacity 250 amp. | — | — | — | 37,08,843.84 | |
| — | 9.00 | — | — | ||
| Supply of 250A Center Feed Unit Boxes with supply of MCCB | — | — | — | 3,44,268.54 | |
| — | 18.00 | — | — | ||
| Supply of 250A End Cover | — | — | — | 16,715.88 | |
| — | 95.00 | — | — | ||
| Supply of 63A Tap off Boxes with SFU & fuse supply | — | — | — | 8,93,661.2 | |
| — | 25.00 | — | — | ||
| Supply of 100A Tap of Box with SFU & fuse supply | — | — | — | 3,54,000 | |
| — | 1.00 | — | — | ||
| Installation and dismantling charges for Compact Air insulated Distribution Trunking of 4 Pole (3 Ph 4 Wire system) of Aluminium busbars, center feed unit, End cover and plug in Box as per explanatory notes | — | — | — | 10,62,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .