| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 CrAccepted-AOC NAN | ₹3.1 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹3.2 CrRejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹3.2 Cr | 2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | M/s Bajrang Construction & Suppliars L1 | BHAMAR SINGH L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of old and damaged brick/stone masonary and plain concrete with lime or cement mortar | 8.55 | M3 | 384.18 ₹3,284.74 Lowest | 1,000 ₹8,550 |
| 2.00 | Earth Work in excavation for foundation in Mar, Kabar, Rankar & Kankar mixed soil including with disposal in 30 m lead and 1.50 m lift. | 7,065.95 | M3 | 88.6 ₹6,26,043.17 | 60 ₹4,23,957 Lowest |
| 3.00 | Supplying & laying of sand spreading in foundation i/c all labour, material,carriage from Erech quarry and T&P etc. for complete. | 420.39 | M3 | 2,299.02 ₹9,66,485.02 | 1,800 ₹7,56,702 Lowest |
| 4.00 | Supplying & laying of C.C. M-10 (1:3.6) with stone grit (20-40 mm) size in foundation of wall including all cost of material, labour,carriage from Gora Machhiya quarry and T&P etc complete. | 1,458.98 | M3 | 4,889.29 ₹71,33,376.32 | 4,800 ₹70,03,104 Lowest |
| 5.00 | Brick work (M-150) with 1:4 cement mortor including all cost of material labour,carriage from Bhoganipur and T&P etc complete. | 3,440.83 | M3 | 4,700 ₹1,61,71,901 Lowest | 5,300 ₹1,82,36,399 |
| 6.00 | Centring and shuttering for R. C.C. & C.C.work in bed block,slab & foundation C.C.including all cost of material labour T&P etc. | 74.91 | M2 | 7,694.38 ₹5,76,386.01 | 500 ₹37,455 Lowest |
| 7.00 | Cutting,bending,binding placing in position of steel Reinforcement with binding wire and cost of steel with all labour, Taxes,T&P etc complete required for proper completion of work. | 1.95 | MT | 65,000 ₹1,26,750 Lowest | 78,000 ₹1,52,100 |
| 8.00 | Supplying & laying of R.C.C.M-20 (1:1.5:3) cement concrete with well graded stone grit manual mixing & vibration,curing including all cost of material labour ,carriage from Gora Machhiya quarryT&P etc complete the work. | 85.31 | M3 | 6,414.71 ₹5,47,238.91 Lowest | 6,800 ₹5,80,108 |
| 9.00 | Cement pointing in 1:2 c.m. for brick work including all cost of material,labour and T&P etc. | 7,203.05 | M2 | 97.48 ₹7,02,153.31 Lowest | 130 ₹9,36,396.5 |
| 10.00 | Earth work in mar kabar rankar and kankar mixed soil in filling including lead up to 30 m.& lift up to 1.50m.dressing making profile with manual compation etc. | 15,945.87 | M3 | 58.3 ₹9,29,644.22 Lowest | 60 ₹9,56,752.2 |
Tender Value
₹3.7 Cr
EMD Value
₹7.5 L
Closing Date
7 Jul 2026, 3:00 pmClosed
Superintending Engineer, IVth Circle Irrigation Wo
Office of the Superintending Engineer, IVth Circle Irrigation Works, Jhansi
LOT-2, Restoration of Bavina and Parausa Canal System under Betwa Canal Division-I, Orai, District Jalaun
2026_UPIDC_1164587_2
02/SE-IV/2026-27
Open Tender
Civil Works
Item Wise
540 days
Babina
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,401
₹7.5 L
18 Aug 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old and damaged brick/stone masonary and plain concrete with lime or cement mortar | 8.55 | M3 | 469.2 | ₹4,011.66 |
| 2 | Earth Work in excavation for foundation in Mar, Kabar, Rankar & Kankar mixed soil including with disposal in 30 m lead and 1.50 m lift. | 7,065.95 | M3 | 108.2 | ₹7,64,535.79 |
| 3 | Supplying & laying of sand spreading in foundation i/c all labour, material,carriage from Erech quarry and T&P etc. for complete. | 420.39 | M3 | 2,807.46 | ₹11,80,228.11 |
| 4 | Supplying & laying of C.C. M-10 (1:3.6) with stone grit (20-40 mm) size in foundation of wall including all cost of material, labour,carriage from Gora Machhiya quarry and T&P etc complete. | 1,458.98 | M3 | 5,970.56 | ₹87,10,927.63 |
| 5 | Brick work (M-150) with 1:4 cement mortor including all cost of material labour,carriage from Bhoganipur and T&P etc complete. | 3,440.83 | M3 | 5,909.97 | ₹2,03,35,202.08 |
| 6 | Centring and shuttering for R. C.C. & C.C.work in bed block,slab & foundation C.C.including all cost of material labour T&P etc. | 74.91 | M2 | 939.6 | ₹70,385.44 |
| 7 | Cutting,bending,binding placing in position of steel Reinforcement with binding wire and cost of steel with all labour, Taxes,T&P etc complete required for proper completion of work. | 1.95 | MT | 72,580 | ₹1,41,531 |
| 8 | Supplying & laying of R.C.C.M-20 (1:1.5:3) cement concrete with well graded stone grit manual mixing & vibration,curing including all cost of material labour ,carriage from Gora Machhiya quarryT&P etc complete the work. | 85.31 | M3 | 7,833.33 | ₹6,68,261.38 |
| 9 | Cement pointing in 1:2 c.m. for brick work including all cost of material,labour and T&P etc. | 7,203.05 | M2 | 119.04 | ₹8,57,451.07 |
| 10 | Earth work in mar kabar rankar and kankar mixed soil in filling including lead up to 30 m.& lift up to 1.50m.dressing making profile with manual compation etc. | 15,945.87 | M3 | 71.2 | ₹11,35,345.94 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.24 MB
BOQ_2183873.xls
BOQ • 0.42 MB
02SEIVNIT2026-27.pdf
Tender Documents • 2.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].