Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹46,000
Closing Date
23 Feb 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
DRDA, Chengalpattu
Chengalpattu District Strengthening of Salaiyur Salaiyamman Koil Road Km 0/0-1/00 of Madurantakam Panchayat Union under 15th Finance Commission Grant Block Panchayat untied
2021_RDTN_195988_1
R.C.NO.2768/2020/A9.dt06 /02/2021
Open Tender
Civil Works - Roads
Item Rate
180 days
Madurantakam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹46,000
Yes
23 Feb 2021
15 Feb 2021
23 Feb 2021
15 Feb 2021
23 Feb 2021
15 Feb 2021
90 days
Amount
Strengthening of Salaiyur Salaiyamman Koil Km 0/0 - 1/00 in Maduranthagam Panchayat Union Est. Amt. - Rs.45.85 Lakh
Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete
Earth work exavation in all classes of soils such as Hard Soil , etc. and depositing on berms with all leads and lifts and all other incidential charges. etc., complete for berms.Asper SS20B
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and laying Prime coat over WMM surface using 7.0 kgs. of emusion for 10 sqm.area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer etc., complete as per clause 503 of MOST specification
Bitumenous macadam 50mm consolidated thickness using bitumen 60/70 grade as per clause 504of most Specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 23.232 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete PAVER FINISHER
Filling with US Gravel for side berms including cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete
Provision for KM Stone
Provision for HM Stone
Culvert 1.5m span
Earth Work excavation and depositing on bank with initial lead of 10m and initial lead of 2m in hard stiff black cotton soil hard red eath shales murram gravel stoney eathth and earth mixed with small size boulders etc..
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification
Cement concrete1: 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete1: 3:6 mix using 40mm metal hard broken stone for foundation inclusive of shorting strutting bailing our tof water ramming curing etc.. including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying & Erecting centering for sides fpor all reinforced cement concrete works like drain sides revetment sides etc using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with mild steel angels of size 25mmz25mmz3mm including removing the same after specified period without damaging RCC works etc.
a.below ground level
b.above ground level
Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement 5 concrete works as per the design given jncluding cost of steel and binding wire in all floors ete, Complete complying with stanard specification.
Cement concrete 1:2:4 mix using 20mm size hard broken stone includive of shorting bailing out of water ramming curing etc..
Reinforcement Cement concrete 1:11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SAMPATH CONTRACTOR
stage.html
html • 0.02 MB
finance_233918.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .