Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.3 LAccepted-AOC NO 25 9 DR NATESAN ROAD 1ST LANE TRIPLICANE CHENNAI 05 | CHENNAI | TAMIL NADU | 600005 | 1 | Accepted-AOC Your tender is accepted | |
| 2 | 2₹10.5 L+₹1.3 L (13.7%)Rejected-AOC NO 1 1 ANNA STREET ETHIRAJ NAGAR WEST MAMBALAM METTUPALAYAM CHENNAI 600 033 | CHENNAI | TAMIL NADU | 600033 | 2 | Rejected-AOC your tender is rejected | |
| 3 | Rejected-Technical | - | Rejected-Technical ESI Live certificate is not enclosed hence rejected |
Tender Value
₹15.6 L
EMD Value
₹14,000
Closing Date
22 Sept 2023, 11:00 amClosed
Superintending Engineer
No.485, MTB building Anna Salai, Nandanam, Chennai.35
Engaging Essential Services to 108 HIG Flats in Shenoy Nagar in T.S. No.43, Block No.3,Perambur,Purasaiwakkam Taluk, Chennai District period From 01.10.2023 to 29.02.2024
2023_TNHB_363528_2
TNHB_CC1_09_2023-24
Open Tender
Civil Works - Others
Item Rate
152 days
Anna Nagar
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹14,000
29 Sept 2023
15 Sept 2023
22 Sept 2023
15 Sept 2023
22 Sept 2023
15 Sept 2023
Amount
Maintenance of Engaging Essential Services to 108 HIG Flats in Shenoy Nagar in T.S. No.43, Block No.3,Perambur –Purasaiwakkam Taluk, Chennai District . period From 01.10.2023 to 29.02.2024 (5 months) by engaging the required and properly trained pump operators for lifting water from sump, well or bore ,well to the over head tank in each block, maintenance of pump sets, attending the repair works in water supply and sanitary line and removal of blockages in water closets, inspection chambers and gullies, attending electrical fault in wiring and electrical installations in the flats, replacing the bulb in common areas, sweeping the common areas including clearing the cowdung and clearing of vegetations, bushes and jungle clearance in and around the scheme area, desilting and cleaning the storm water drains and removal of debris away from the schme area, maintaining the avenue trees, and garden plants, cleaning of water tanks and sump in each block once in 4 months of a year by rotation and to maintain the scheme area in a neat and tidy condition, operating to lift smoothly without any complaints from the residents of the scheme and also staying in the lift itself as per time schedule indicated, etc., complete in all respect and as directed by department officers.
Pump Operator
Sweeper
Electrician cum plumber
Providing Security arrangements for 108 HIG Flats at Shenoy nagar chennai for 5 month . with necessary regular day and night watchman and to safe guard the installation such as pump sets, generators, fire service equipments, common lights, etc all complete and as directed by the departmental officers.
Sub Total
SRK CONSTRUCTIONS
LASHMINARAYANANCONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .