Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹38.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹40.5 L+₹1.8 L (4.65%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹42.7 L+₹4.0 L (10.4%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹45.7 L+₹7.0 L (18.0%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹49.0 L+₹10.3 L (26.6%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
28 Feb 2026, 12:00 pmClosed
EXECUTIVE ENGINEER, PUBLICHEALTHENGINEERINGDEPARTM
EXECUTIVE ENGINEER, PUBLICHEALTHENGINEERINGDEPARTMENT, CITY DIVISION BHILWARA
ConstructionExperienceofkeyComponent Source improvement and pipeline laying work in Bhainsakundal BlockSuwana District Bhilwaraon single point responsibility turnkey basis
2026_PHCJA_539871_9
122
Open Tender
Civil Works - Water Works
Percentage
120 days
EXECUTIVE ENGINEER, PUBLICHEALTHENGINEERINGDEPARTM
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
EXECUTIVE ENGINEER, PUBLICHEALTHENGINEERINGDEPARTM
₹98,000
Yes
12 Mar 2026
19 Feb 2026
28 Feb 2026
19 Feb 2026
28 Feb 2026
19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dry sinking of well true & vertical in all types of soil including sand, silt, clay, mixed upto 25% with gravel and river bed stones upto size 300 mm in any direction complete as per drawing and technical specification (depth from level of placing of cutting edge & internal dia, to be taken for measurement) rate includes all percentage of pebbles, boulders and river bed stones. (depth to be measured from ground level) | - | - | - | - |
| 2 | Fore depth up to 5.00 m depth | - | P.M. dia P.M. depth | 1,473 | - |
| 3 | for depth from 5.00 m to 10.0 mtr | - | P.M. dia P.M. depth | 2,057 | - |
| 4 | Wet sinking of well in all type of strata (soil & boulders in any quantity) including required operations like chiseling, air and water jetting, hoist drives, skilled divers etc for removal of isolated obstructions and minor blasting if required and lifting of excavated material upto ground level, and spreading the same with ramming and watering within a radius of 50 m from the site of open well. Rate includes all percentage of pebbles, boulders and river bed stones. (depth to be measured from ground level) | - | - | - | - |
| 5 | for depth from 5.00 m to 10.0 mtr | 1 | P.M. dia P.M. depth | 3,507 | ₹3,503.49 |
| 6 | for depth from 10.00m to 15.0 mtr | - | P.M. dia P.M. depth | 4,448 | - |
| 7 | Earth work in excavation over areas (exceding 30cm depth, 1.5 mtr in width and I 0 SQM in plan) for construction of open well, lift up to 1.5 Mtr. including taking out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 meter. | - | - | - | - |
| 8 | Hard rock (requiring blasting) useful material 30 % | - | Cum | 1,171.2 | - |
| 9 | Add extra over item No 2.1 and 2.2 for every additional; lift of 1.5 m or part there of.: In ordinary rock and hard rock | - | - | - | - |
| 10 | In hard rock | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
128.pdf
Tender Documents • 3.50 MB
BOQ_963348.xls
BOQ • 0.37 MB
Ordar.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .