Loading…
Loading…
Tender Value
₹1.5 L
EMD Value
₹2,912
Closing Date
24 Jul 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
boq
2026_RDPR_315388_1
e-NIT No. 30 REW UDHAMPUR of 2026-27 Dated 10-07-2026
Open Tender
Civil Works
Percentage
30 days
XEW REW UDHAMPUR
nit
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹2,912
Yes
11 Jul 2026
11 Jul 2026
25 Jul 2026
11 Jul 2026
24 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earh Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 10.69 | cum | 479.3 | ₹5,123.72 |
| 2 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 1.25 | cum | 4,826.5 | ₹6,033.13 |
| 3 | P/L of RR stone masonary laid in 1:6 cement mortar | 13.7 | cum | 5,402.9 | ₹74,019.73 |
| 4 | 20mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 26.7 | Sqm | 362.65 | ₹9,682.76 |
| 5 | Providing and laying 50mm thick D.P.C 1:2:4 mix | 5.99 | Sqm | 416.5 | ₹2,494.84 |
| 6 | Providing and laying 50mm thick flooring 1:2:4 mix | 5.11 | rmt | 562.15 | ₹2,872.59 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree, landing balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding cost of centring, shuttering, finishing and reinforcement.1 cement: 2 coarse sand : 4 graded stone aggregates 20mm nominal size. | 1.11 | cum | 9,821.85 | ₹10,902.25 |
| 8 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . | 88.79 | kg | 123.2 | ₹10,938.93 |
| 9 | Providing centering and shuttering including struting ,propping etc for slab | 5.95 | each | 718.2 | ₹4,273.29 |
| 10 | Providing centering and shuttering including propping struting etc. for edges of slab | 12.5 | sqm | 262.2 | ₹3,277.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_1022780.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .